Oberon

New Member
Joined
26 Jan 2021
Messages
2
Location
Teesside
That appears different from what I was expecting. I was under the impression a new platform was getting built on the north side (down Saltburn slow line).
That concept was part of the previous Middlesbrough Council led masterplan. The real world site constraints meant that a new platform and concourse to the north of the up/down slow lines was never a feasible option.

I've attached some detailed initial drawings, which outline the proposed arrangement for the new platform and track layout. These are still awaiting sign off by Network Rail's engineering and asset management teams, so could be subject to change, but they're a good barometer for what to expect from the package of works:
 

Attachments

  • MID-STN-700001-min.pdf
    2.2 MB · Views: 182
  • MID-STN-700002-min.pdf
    3.8 MB · Views: 148
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
Thanks for uploading those. And welcome to the forums, I see this is only your first couple of posts. :D

Having zoomed in I can see in the small print the turnback siding has 278m standage, (10 car 800?) and P3 will be 150m, and its end is beyond the end of P2.
 
Last edited:

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,952
Location
here to eternity
Seen the following article on our local newspaper website.
https://www.gazettelive.co.uk/news/...rough-railway-station-masterplan-new-14358462



I suspect the 'new' platform will be the re-opening of the bay platform at the Saltburn end of platform 2. The new retail units are suppossed to be opening under where the currently closed carpark is once the work to fix the age deteriated supports for the carpark is completed. As for the rest of the plans .......

Thread reopened to allow @bearhugger to provide an update.
 

bearhugger

Member
Joined
17 Mar 2015
Messages
688
Location
Middlesbrough
Thanks @Mag_seven for re-opening.

I used Middlesbrough today for the first time in a little while & realised the boarding had come down outside where the ticket office is. The old car park at the top of the ramp is now a seating area with a couple of big seats that double as a cover for the air con units for the newly refurbished shop units below. Also the new steps down to the subway are tiled now.
I'm really glad the boarding has gone as it's been up for at least a decade.
PXL_20240902_093639011.RAW-01.COVER.jpg

PXL_20240902_142359890.RAW-01.COVER.jpgPXL_20240902_093635071.RAW-01.COVER.jpg

PXL_20240902_093704142.RAW-01.COVER.jpg
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
Yes it's coming along nicely at the moment! The new subway (or I guess extension to the existing subway) appears to be coming along nicely and is fitting out so can't be that far away from opening I suspect. I've attached a few photos from a few weeks ago showing the way down to the subway and the currently none public part of the subway extension (the second image was taken poking the phone over the green barrier in the first). Progress has been made since as well. IMG_20240810_111704.jpgIMG_20240810_111719.jpg
 

bearhugger

Member
Joined
17 Mar 2015
Messages
688
Location
Middlesbrough
Yes it's coming along nicely at the moment! The new subway (or I guess extension to the existing subway) appears to be coming along nicely and is fitting out so can't be that far away from opening I suspect. I've attached a few photos from a few weeks ago showing the way down to the subway and the currently none public part of the subway extension (the second image was taken poking the phone over the green barrier in the first). Progress has been made since as well. View attachment 164779View attachment 164780
That bit of wood with the printed out "Way Out" etc has been removed & now has the tiling & a proper sign on now. If I hadn't had my grandson with me I would have probably taken a photo but was more concentrating on getting him up the stairs ok.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
That bit of wood with the printed out "Way Out" etc has been removed & now has the tiling & a proper sign on now. If I hadn't had my grandson with me I would have probably taken a photo but was more concentrating on getting him up the stairs ok.
Yeah think they did that last week but didn't feel photo worthy! :lol:
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
Is the new P3 behind the down end of P2 and loop behind the down island actually going to happen? Post #151 just before the thread was closed included drawings, but I lost touch with what was decided.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
Oh! Speaking of signs we got some new ones including this one, which seems a little hopeful :lol:

IMG_20240809_171643.jpg
(Picture shows sign pointing to platform 2 and 3)

The first, and very much only(!), sign of platform 3 being constructed.

Is the new P3 behind the down end of P2 and loop behind the down island actually going to happen? Post #151 just before the thread was closed included drawings, but I lost touch with what was decided.
Alledgedly, and see my picture above for hard proof. But yes it is alledgedly still going to happen. I offer no comment on when.
 
Last edited:

bearhugger

Member
Joined
17 Mar 2015
Messages
688
Location
Middlesbrough
Is the new P3 behind the down end of P2 and loop behind the down island actually going to happen? Post #151 just before the thread was closed included drawings, but I lost touch with what was decided.
To concur with @ainsworth74 in his post above, there's certainly no sign of any work related to that happening yet. Whether it will start once the current phase is pretty much done, we'll just have to wait & see.
Edit: on a side note, I see I started this thread on 2nd March 2018 - 6 years ago. But the area outside the ticket office was closed long before that as I was a mature student at Teesside Uni at the time. I turned 40 during my time at uni and was even using Marton station as James Cook hadn't been opened.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
To concur with @ainsworth74 in his post above, there's certainly no sign of any work related to that happening yet. Whether it will start once the current phase is pretty much done, we'll just have to wait & see.
Edit: on a side note, I see I started this thread on 2nd March 2018 - 6 years ago. But the area outside the ticket office was closed long before that as I was a mature student at Teesside Uni at the time. I turned 40 during my time at uni and was even using Marton station as James Cook hadn't been opened.
At this steady rate of progress, you might be able to use a senior railcard from P3 then…
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
Alledgedly, and see my picture above for hard proof. But yes it is alledgedly still going to happen. I offer no comment on when.

I wonder if the team delivering it have been working on the new platform and associated infrastructure for this new platform at Bradford Forster Square.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
Seems like everything has come to a sudden stop with platform 3
It never got started in order for it to come to a sudden stop :lol:

But yes whilst I'm not quite as pessimistic as @Last Orders in that I do think it will eventually happen, I don't think it's happening any time soon.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
I hope it happens but I also hope Halifax gets one too!

It may be being done like Bradford i.e plan it and then announce it shortly after they start work on it.

With our new goverment keen to demonstrate investment its certainly a quick win poltically so I can certainly see it happening at some point.
 

Last Orders

New Member
Joined
27 Mar 2021
Messages
4
Location
Redcar
@ainsworth74 Sorry for the scepticism but lets face it the project started in 2021 and we are now rapidly approaching 2025 and still nothing positive regarding platform 3 why. While having a nice fancy new entrance to the station and all the other work being done to improve the look of the station is very nice it was not the priority. The installation of the extra platform is crucial in order to increase capacity which is much needed in order to attract new travel destinations so why didn't they build the new platform first. The original £35m has gone we are now looking at other funding in which we are having to compete with other nation wide projects so good luck with that, perhaps Reading station can send us a few million from their £895m hey shouldn't miss it
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
@ainsworth74 Sorry for the scepticism but lets face it the project started in 2021 and we are now rapidly approaching 2025 and still nothing positive regarding platform 3 why. While having a nice fancy new entrance to the station and all the other work being done to improve the look of the station is very nice it was not the priority. The installation of the extra platform is crucial in order to increase capacity which is much needed in order to attract new travel destinations so why didn't they build the new platform first. The original £35m has gone we are now looking at other funding in which we are having to compete with other nation wide projects so good luck with that, perhaps Reading station can send us a few million from their £895m hey shouldn't miss it
Isn't the area between the station and the river a massive redevelopment area, which maybe could help fund the new platform?
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
The original £35m has gone we are now looking at other funding in which we are having to compete with other nation wide projects so good luck with that, perhaps Reading station can send us a few million from their £895m hey shouldn't miss it

Who was orginally funding it ?

Interestingly there is a platform extension plan for Leeds station between £20 & £25 million. Which I believe is a much more recently developed scheme.

£14.9m is supposedly comming from the Rail Network Enhancement Pipeline Fund.

See thread:

Leeds Station: What further improvements would you like to see?​

Post: 62
 

choo.choo

Member
Joined
17 May 2022
Messages
55
Location
UK
A few photos of the new subway extension (taken last week) now that it’s open. I like the green tiles that show where the old staircase used to be.









 

Fadacious

Member
Joined
4 Sep 2023
Messages
27
Location
York
As someone who's used the station for nearly all of their life, it's really odd seeing that the dingy subway actually looks nice now
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
At the meeting of the Tees Valley Combined Authorities Transport sub-committee on 22 November the subject of this station and platform 3 came up in the papers:

Middlesbrough Station

The phase 2 redevelopment of the station undercroft is being delivered by Network Rail with a funding contribution from TVCA. The station concourse has been completed and the new station entrance is already in use. The final phase is the completion of two new business units, which will be finished in late 2024.

TVCA is in contract with Network Rail for phase 3 of the project development to deliver additional capacity at the station to improve performance and reliability and enable an expansion of services. Detailed discussions with London North Eastern Railway (LNER), TransPennine Express (TPE) and Northern regarding infrastructure requirements are ongoing. Completion of outline designs, costs and an assured delivery programme are due in August 2025. The delivery programme outlined in Appendix 1 is indicative at this stage.

It is somewhat disappointing that despite at least one set of plans having already been published about the design of the station it would seem we've not actually locked in on the final design so discussion "remain ongoing". According to Appendix 1 the project is currently under development with end now expected in August 2025. Delivery will begin in January 2026 with completion by March 2027. Though on the plus side the deliverability is assessed as being "Likely" whilst the funding is rated as being "Green" so it's not all doom and gloom.
 

Attachments

  • Agenda-and-Papers-Transport-Committee-22.11.24 (1).pdf
    2.7 MB · Views: 26
Joined
20 Oct 2021
Messages
46
Location
Teesside
At the meeting of the Tees Valley Combined Authorities Transport sub-committee on 22 November the subject of this station and platform 3 came up in the papers:



It is somewhat disappointing that despite at least one set of plans having already been published about the design of the station it would seem we've not actually locked in on the final design so discussion "remain ongoing". According to Appendix 1 the project is currently under development with end now expected in August 2025. Delivery will begin in January 2026 with completion by March 2027. Though on the plus side the deliverability is assessed as being "Likely" whilst the funding is rated as being "Green" so it's not all doom and gloom.
Least it’s getting done is what I can say about it, some funding was given to us last year which would “speed up delivery of this” this has since been on review waiting confirmation in spring , if we end up getting this maybe timescales will be brought forward
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
Any further updates or anything for platform 3 at Middlesbrough
No spades anywhere near the ground. Looking at the Tees Valley Combined Authority cabinet papers for their most recent meeting (28 March 2025), specifically the attached document, suggests that they're still working on project development which is expected to conclude in August 2025. Project delivery is expected to commence in January 2026 with completion in March 2027.

The document also has various other updates but they would be matters for alternative threads ;)
 

Attachments

  • 12.1-Transport-Programme-Cabinet-Report-Appendix-1-Draft-1.pdf
    503.7 KB · Views: 40