60163tornado
Member
Just a thought that because Met 1 has recently been running on the underground, would it be classed as mainline fitted, or was that just an exception?
Thanks
Thanks
I seem to recall it went to Brighton with some Pullman cars in tow some time in the 1980s.Something of interest; electric locomotive Sarah Siddons has worked on BR metals in the past with the green 4-SUB unit (evidence here). Does anyone know if this means it has AWS installed, or was an exception made for it? Would such a thing be acceptable on today's railway?
EDIT: Pictures of other tours on BR worked by Sarah Siddons