emoaconr
Member
Moderator note: split from
www.railforums.co.uk
Just demonstrates the lack of urgency for projects of a specific local importance by a regional TOC. The state of Northern's stations in Greater Manchester quite literally demonstrate how neglected the City Line stations could have become without local PTE sponsorship (TfGM's priorities - until recently - lay in Metrolink over local rail).
LCRCA really needs to be afforded the power to transfer the management of City Line stations within LCRCA boundary to Merseyrail - despite who runs the service. As seen with the planned station destaffing under the previous Government, Northern have shown absolutely no commitment to doing anything autonomously. The relative cleanliness and maintenance of City Line stations is certainly not attributed to Northern - and the consistency in design between Northern-operated and Merseyrail-operated stations is certainly something seldom replicated elsewhere.
Broad Green Station, Liverpool Refurbishment
Work has started at Broad Green Station on the Liverpool to Manchester/Wigan line. It appears that they are installing lifts. As a result the subway is closed and passengers arriving from Liverpool have to leave by the entrance on Platform 2 and walk down to Thomas Lane, using the footpath...
Just demonstrates the lack of urgency for projects of a specific local importance by a regional TOC. The state of Northern's stations in Greater Manchester quite literally demonstrate how neglected the City Line stations could have become without local PTE sponsorship (TfGM's priorities - until recently - lay in Metrolink over local rail).
LCRCA really needs to be afforded the power to transfer the management of City Line stations within LCRCA boundary to Merseyrail - despite who runs the service. As seen with the planned station destaffing under the previous Government, Northern have shown absolutely no commitment to doing anything autonomously. The relative cleanliness and maintenance of City Line stations is certainly not attributed to Northern - and the consistency in design between Northern-operated and Merseyrail-operated stations is certainly something seldom replicated elsewhere.
Last edited by a moderator: