• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Merseyrail legacy fleet updates (Class 507/508)

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WarrenT

Member
Joined
7 Aug 2024
Messages
32
Location
Wirral
Very interesting. I noticed that the fire announcement is the same script as it is for the new trains. "and close the doors to block the smoke". I've always wondered what they meant by that on the 777 announcement but i guess it's just them re-using a script. Very lazy.
 

mikecmac

Member
Joined
24 Oct 2023
Messages
62
A senior Merseyrail manager is hoping 507001 will be out running on November 1st as this was day the two "Royal " units 001 & 002 first entered revenue service 46yrs ago. The highest mileage run by a 507 is 3.9 million miles and 001 had covered 3.6 million miles earlier in the year!!!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,236
Location
West Wiltshire
BBC reporting that £500,000 extra was spent April-July keeping the old 507+508 in service longer than planned

Extending the life of older Merseyrail trains has cost taxpayers hundreds of thousands of pounds, a report said.
Documents released ahead of a Liverpool City Region Combined Authority (LCRCA) meeting show a £500,000 overspend in rolling stock between April and July that was "largely due to the retention of the old fleet longer than expected".
Merseyrail's new Class 777 trains were unveiled in January 2023 and it was hoped older models would be phased out.
LCRCA leaders will be asked to sign off on Merseyrail's latest financial position later this week.
The report to the LCRCA said: "This delay attracts additional lease and maintenance costs and reduces the operational savings from the new fleet."
More than 50 state-of-the-art Class 777 trains have been introduced as part of the publicly owned fleet.

 

Sam 76

Member
Joined
10 Nov 2021
Messages
499
Location
Southport.
BBC reporting that £500,000 extra was spent April-July keeping the old 507+508 in service longer than planned



That explains why Merseytravel wouldn’t sign off the use of 6 car sets on Ormskirk to Hunts Cross then. Although I’m not sure what good it is keeping them parked in the sidings whilst passengers are squashed in either.
 

mikecmac

Member
Joined
24 Oct 2023
Messages
62
Stadley should be paying any costs associated with delays in getting the full 777 fleet in service!!!
 

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,711
Location
Liverpool
507029 is about to enter service forming the 16.06 Birkenhead Hamilton Square - Liverpool - Chester. The first 507 in revenue-earning service on this route since 25th May.
 

MR-507508

Member
Joined
17 Jan 2020
Messages
1,022
Location
North West
Interesting to see the nameplate on 507016 was not removed prior to heading to Newport, any particular reason for this?
 

Grumpy Git

On Moderation
Joined
13 Oct 2019
Messages
2,255
Location
Liverpool
Interesting to see the nameplate on 507016 was not removed prior to heading to Newport, any particular reason for this?

I think its only a "fancy" sticker, (but happy to be corrected)?
 

D6975

Established Member
Joined
26 Nov 2009
Messages
3,053
Location
Bristol
Interesting to see the nameplate on 507016 was not removed prior to heading to Newport, any particular reason for this?
Nameplates are removed at Newport and returned to the owners. The 91s were the same, went for scrap with plates still on. If it's only a sticker then why bother?
 

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,711
Location
Liverpool
It's actually a namesticker isn't it!
No, a physical plate.

Nameplates are removed at Newport and returned to the owners. The 91s were the same, went for scrap with plates still on. If it's only a sticker then why bother?
All named 507/8s so far except this have had their plates removed at Birkenhead North, not Newport.

I've checked my video from yesterday and the plate hasn't been removed from other (grey) side, either.
 

simonmpoulton

Member
Joined
25 Jun 2011
Messages
217
Also just had a ride on 507029 - took it from the 17:01 all the way from Chester to Chester. Here it is waiting to form the 18:30
 

Attachments

  • IMG_1228.jpg
    IMG_1228.jpg
    3 MB · Views: 49

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,711
Location
Liverpool
029 is still out I believe. As for the others, four are at Birkenhead North: 018 in the workshop, 007 back in the main shed looking very clean and the railtour pairing of 001 and 003 beside. 023 remains at Southport but still hasn't been called into action since regular diagrams stopped.
 

MR-507508

Member
Joined
17 Jan 2020
Messages
1,022
Location
North West
029 is still out I believe. As for the others, four are at Birkenhead North: 018 in the workshop, 007 back in the main shed looking very clean and the railtour pairing of 001 and 003 beside. 023 remains at Southport but still hasn't been called into action since regular diagrams stopped.
029 appears to have been swapped out at Rock Ferry on 2C56.


029 running back to West Kirby sidings now.

 

harrym508131

Member
Joined
18 Jun 2022
Messages
109
Location
birkenhead north
029 appears to have been swapped out at Rock Ferry on 2C56.


029 running back to West Kirby sidings now.

booted off 029 onto tram 15, tram 15 then proceeded to fail at rock ferry despite being fresh off kirkdale
 

simonmpoulton

Member
Joined
25 Jun 2011
Messages
217
Yes it looks from the timings on RTT that instead of just taking it out of service at the end of the day that they've inconvenienced everyone by swapping it out causing a 10+ min delay and then skipping a load of stops on the way back to get it back on time for the next diagram. Makes no sense at all to me!

Harry - your joking surely the replacement unit failed as well?
 

WirralLine

Member
Joined
4 Jun 2024
Messages
527
Location
Wirral
Yes it looks from the timings on RTT that instead of just taking it out of service at the end of the day that they've inconvenienced everyone by swapping it out causing a 10+ min delay and then skipping a load of stops on the way back to get it back on time for the next diagram. Makes no sense at all to me!

Harry - your joking surely the replacement unit failed as well?
Harry isn't joking, there's a message on internal systems as 777015 unit fault on change over!

Apparently 029 needed swapping as that diagram finishes at Rock Ferry then the unit would start on Chesters again in the morning - they didn't want it back out today. Of course it did make it out today, just not on Chesters!

I managed a couple of round trips on her yesterday. It was meant to be swapped earlier at Rock Ferry on the 1830 off Chester - the guard came through and advised everybody of the unit change - but that 777 had a fault too so it managed an extra round trip and a bit!
 

mrd269697

Member
Joined
14 Feb 2020
Messages
170
Location
Wirral
Why do they rush to swap them out? Surely it is easier to just keep it on til end of service. Seems so pointless to swap it out in the middle of the evening.
 

WirralLine

Member
Joined
4 Jun 2024
Messages
527
Location
Wirral
Why do they rush to swap them out? Surely it is easier to just keep it on til end of service. Seems so pointless to swap it out in the middle of the evening.
Ruins their image having old ones out when they havnt been seen for months. Also a lot of new train managers about who don't sign the 50X so a bit of a logistical nightmare covering jobs that have adhoc 507s on them
 

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,711
Location
Liverpool
Ruins their image having old ones out when they havnt been seen for months. Also a lot of new train managers about who don't sign the 50X so a bit of a logistical nightmare covering jobs that have adhoc 507s on them
More they have been told to remove them from service as soon as possible than anything else. 507s were intended for diagrammed Ormskirk - Hunts Cross work before Merseytravel put the kibosh on it.

507029 actually ran a full diagram on the West Kirby line, concluding with the 17.51 circuit. Great to see.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,194
booted off 029 onto tram 15, tram 15 then proceeded to fail at rock ferry despite being fresh off kirkdale
Those 777s are the gift that keeps on giving.

== Doublepost prevention - post automatically merged: ==

Ruins their image having old ones out when they havnt been seen for months. Also a lot of new train managers about who don't sign the 50X so a bit of a logistical nightmare covering jobs that have adhoc 507s on them
What could be worse in terms of image than a train that doesn't work? Point taken about crew though. Would it be easier to use them to Southport?
 

Pacef8

Member
Joined
21 Mar 2020
Messages
479
Location
Wirral
Dont forget the hoylake open when the brand new train was unveiled for all to see . The special 4 ft access bridge between platforms . The train arrived people waited and it left empty and faulty .
 
Status
Not open for further replies.

Top