• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Merseyrail Expansion

Status
Not open for further replies.

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,398
Location
A typical commuter-belt part of north-west England
Additionally, this is the Speculative Discussion section; don't police people speculating here.

The website moderators do an excellent job on this website and have no need of unofficial moderation from thread contributors.

== Doublepost prevention - post automatically merged: ==

If you ask for everything and get something, you might be disappointed, but you'll be better off than that poor sod with nothing.
On the other side of that coin, what do you do if you ask for everything.....and get nothing.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CaramellDansen

On Moderation
Joined
6 Jan 2024
Messages
175
Location
Liverpool
On the other side of that coin, what do you do if you ask for everything.....and get nothing.
Then you've lost nothing, and hopefully learned what to do in the future to ensure you get what you want... or you can let pessimism consume you and start stamping out others' optimism.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
The trouble with putting the curves back is that it will cost money - lots of money.

Regardless of what I may have said above, I am continuing to think that 'Skem Parkway' (quite possibly in the form of Upholland with improved access, parking and facilities) and Merseyrail extension to Wallgate is the way to go: for Ormskirk to Preston how about extending M'rail (on batteries) through Burscough Junction to a new platform where the Ormskirk - Preston and Southport - Wigan lines cross? Let's call it Burscough School Lane for the moment.

If School Lane also has Wigan line platforms and good car parking, then it would be a parkway type station with direct trains to Liverpool, Southport, Preston and Manchester - and while not giving through trains apart from the existing Southport to Manchester would allow travel between all pairs of stations (and their suburbs) with only one change.

(N.b. aim to retain Bridge and Junction - although Bridge to School Lane would be very short.)

Cheapish, and by no means perfect - but with gains outweighing the costs?

I'd call that West Lancashire Parkway, it could be funded in part by development around it, and I'd replace Bridge with it, adding a foot and cycle path between the two as they are rather close.

However, it is the weaker of the two options, in particular it doesn't enable a Preston to Southport service, it would just move the end on end buffer stops from Ormskirk.

It'd be better than nowt, though.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,157
I'd call that West Lancashire Parkway, it could be funded in part by development around it, and I'd replace Bridge with it, adding a foot and cycle path between the two as they are rather close.

However, it is the weaker of the two options, in particular it doesn't enable a Preston to Southport service, it would just move the end on end buffer stops from Ormskirk.

It'd be better than nowt, though.
Only issue is how do you get traffic to the new Parkway without loads of traffic down School Lane? Not much room for a new dedicated access road from the A59.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Only issue is how do you get traffic to the new Parkway without loads of traffic down School Lane? Not much room for a new dedicated access road from the A59.

An access road from the A5209 doesn't look like it would be difficult, and if building housing around it (as would be sensible) would be needed anyway.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,551
Location
Torbay
Strikes me that the better way to do Skem (given its car dependent nature and low density, plus the likely lack of inbound traffic to the town centre as it's not a desirable place to shop and aside from the Co-op Bank mostly offers minimum wage employment available more or less everywhere) is to extend Upholland with a new building and large car park on the Pimbo side and run Merseyrail to Wallgate to serve it.

If anything inbound commuting is more likely to Pimbo than to the Concourse and Asda.

I don't think Merseyrail to Southport via Burscough makes much sense. An hourly Northern Southport-Preston service via the North Curve and Merseyrail to Burscough Bridge makes most sense to me. Even to Preston makes little sense - it's a long run on uncomfortable, toiletless units with a very low density population and mass development unlikely, whereas Burscough itself is expanding, looks to Liverpool more than Preston, and likely to become joined to Ormskirk before long.
A car park yes, but the ironic thing is Skem has the lowest car availability in West Lancashire, the bus network is mediocre, with local needs mostly met by longer interurban routes crossing town and no public buses at all go into the Pimbo industrial estate today, despite it being Skelmersdale's biggest employment destination. The only route with a a stop nearby is the hourly 312 from Rainford at Upholland station which then runs via Upholland (town) to Skem central before tracing a convoluted path through some housing estates and heading out to Ormskirk via Parbold and Burscough. Like many such routes it finishes for the night around 7pm so would be little use for returning home after working late in Liverpoool for instance and none whatsoever going out for the evening in the city. There are unserved stops in Pimbo Lancashire council database still records as 'active', so that suggests there was an estate bus in the fairly recent past. An interchange at Upholland with a new frequent and long hours bus service would doubly benefit Skem residents with new connections to their local major employment centre as well as access to rail travel elsewhere for work and leisure.

From Lancashire's 'MARIO' mapping service - Maps & Related Information Online https://mario-lancashirecc.hub.arcgis.com/ Note the stops in Pimbo. Note Lancashire don't publish pdf bus maps like some local authoritiess, so in a multioperator town like Skelmersdale its difficult for a stranger to get a good idea of the service patterns.
1719872827142.png
 
Last edited:

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,157
An access road from the A5209 doesn't look like it would be difficult, and if building housing around it (as would be sensible) would be needed anyway.
If you managed to cross School Lane and the Leeds & Liverpool Canal twice, it would be possible. However, I think a 3rd platform at Burscough Bridge and the curves with your Preston to Southport + Merseyrail to Burscough Bridge might be a cheaper option (with the same sizeable housing development for the Section 106 money to help fund).
 

CaramellDansen

On Moderation
Joined
6 Jan 2024
Messages
175
Location
Liverpool
An interchange at Upholland with a new frequent and long hours bus service would doubly benefit Skem residents with new connections to their local major employment centre as well as access to rail travel elsewhere for work and leisure.
Well said! The bus routes I mentioned earlier (the 312, 740, 742, 744, 746 and 769) in post #567 show decent local connections within Skem but then seem to be one an hour at best (the 312, like you said) but then as low as once per day according to bustimes.org. Either increasing some of these routes to 1 or 2 buses per hour or creating a new route with inspiration from them would not only be worthwhile, but I would argue necessary!
However, I think a 3rd platform at Burscough Bridge and the curves with your Preston to Southport + Merseyrail to Burscough Bridge might be a cheaper option
Agreed, although where do you think that platform would go? My first thought was on the curve to keep the main line free, but that produces accessibility concerns. Using the current south platform as an island platform would mean destroying the modern... (something?)* building.

*(Signs on the side call it Burscough Bridge Interchange. Is it a cafe? Community centre? Station building? Waiting shelter?)

Edit: Wikipedia says it's "disused"
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
If you managed to cross School Lane and the Leeds & Liverpool Canal twice, it would be possible. However, I think a 3rd platform at Burscough Bridge and the curves with your Preston to Southport + Merseyrail to Burscough Bridge might be a cheaper option (with the same sizeable housing development for the Section 106 money to help fund).
There is minimal need or justification to change the current rail provision in the Aughton/Ormskirk/Burscough area, which is entirely within West Lancashire and thus outwith Merseyside. The proposals that several posters on this thread are making would destroy the through rail service from Ormskirk to Preston. Virtually no one is going to change trains at Burscough Bridge. There are adequate bus services from Ormskirk to Wigan and to Southport, together with an express bus (X2) from Southport to Preston. There aren't enough battery/electric class 777 trains to serve both the Ormskirk and Kirkby lines to allow Merseyrail extensions beyond the end of the 3rd rail electrification at Ormskirk.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,398
Location
A typical commuter-belt part of north-west England
A car park yes, but the ironic thing is Skem has the lowest car availability in West Lancashire, the bus network is mediocre, with local needs mostly met by longer interurban routes crossing town and no public buses at all go into the Pimbo industrial estate today, despite it being Skelmersdale's biggest employment destination. The only route with a a stop nearby is the hourly 312 from Rainford at Upholland station which then runs via Upholland (town) to Skem central before tracing a convoluted path through some housing estates and heading out to Ormskirk via Parbold and Burscough. Like many such routes it finishes for the night around 7pm so would be little use for returning home after working late in Liverpoool for instance and none whatsoever going out for the evening in the city.
Would you say that the "Concourse" area is where most bus services use in Skelmersdale. I have not been there for quite a long time, but it seemed the stop where the majority of services called at, where interchange could be made.

== Doublepost prevention - post automatically merged: ==

There aren't enough battery/electric class 777 trains to serve both the Ormskirk and Kirkby lines to allow Merseyrail extensions beyond the end of the 3rd rail electrification at Ormskirk.
Glad to see that you made that particular point.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Well said! The bus routes I mentioned earlier (the 312, 740, 742, 744, 746 and 769) in post #567 show decent local connections within Skem but then seem to be one an hour at best (the 312, like you said) but then as low as once per day according to bustimes.org. Either increasing some of these routes to 1 or 2 buses per hour or creating a new route with inspiration from them would not only be worthwhile, but I would argue necessary!

Agreed, although where do you think that platform would go? My first thought was on the curve to keep the main line free, but that produces accessibility concerns. Using the current south platform as an island platform would mean destroying the modern... (something?)* building.

*(Signs on the side call it Burscough Bridge Interchange. Is it a cafe? Community centre? Station building? Waiting shelter?)

Edit: Wikipedia says it's "disused"

To me the best way would be to move the station maybe 20 metres towards Tesco, then there'd be ample room for a turnout, with the new platform face's track on what is now car parking. It would lose that building but it's hardly a big thing in the scheme of things. Replacement parking could be provided elsewhere.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,551
Location
Torbay
There aren't enough battery/electric class 777 trains to serve both the Ormskirk and Kirkby lines to allow Merseyrail extensions beyond the end of the 3rd rail electrification at Ormskirk.
More could be converted if desired (at a cost clearly). The design has space and weight budget to accommodate either a bank of 'line haul' traction batteries or a 25kV transformer for dual voltage working in the same space but not both. Units without batteries today have a ballast weight so vehicle dynamics would be unchanged if a battery or transformer was fitted in the future. All units already have a small traction battery for depot shunting and emergency movements.

== Doublepost prevention - post automatically merged: ==

Would you say that the "Concourse" area is where most bus services use in Skelmersdale. I have not been there for quite a long time, but it seemed the stop where the majority of services called at, where interchange could be made.
Looking at bustimes.org, it looks like all regular public routes go to the concourse bus station, where interchange between services is possible. There might be infrequent extra school services and similar that avoid the concourse, but I haven't found any.
 
Last edited:

CaramellDansen

On Moderation
Joined
6 Jan 2024
Messages
175
Location
Liverpool
There aren't enough battery/electric class 777 trains to serve both the Ormskirk and Kirkby lines to allow Merseyrail extensions beyond the end of the 3rd rail electrification at Ormskirk.
Idea: overhead electrification. You know, like the rest of the country... No, the rest of the world!
Simple. Reliable. Standardised.

I'm sick of pretending Britain, especially Merseyside, cannot afford incredibly minor railway infrastructure meanwhile skyscrapers and new stadiums litter Liverpool city centre...
The money is there and we should demand it.
Additionally, this would hopefully start a cascaded replacement of the third rail system to finally bring Merseyrail into the futuristic technology of the year... (checks notes...) 1881.

To me the best way would be to move the station maybe 20 metres towards Tesco
Do you mean 20m down the line towards Southport? If so, would that mean the Merseyrail service would join the Southport-Wigan line and then spur off it for a 3rd platform, or would a third set of tracks run alongside the Southport-Wigan line and then split into two, one set going to the Merseyrail platform and the other joining the Southport-Wigan line (similar to Hunts Cross, sans third rail)?

== Doublepost prevention - post automatically merged: ==

Signs on the side call it Burscough Bridge Interchange
You know, it's hilarious to me that this is the grand "Interchange" Burscough gets, but all they have is one single bus stop and at most 30 parking spaces, serving an infrequent and unelectrified line. This country is a laughing stock.
 
Last edited:

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,594
Location
Greater Manchester
Additionally, this would hopefully start a cascaded replacement of the third rail system to finally bring Merseyrail into the futuristic technology of the year... (checks notes...) 1881.
I doubt the 3rd rail would be replaced, especially since 777s can have a pantograph fitted (except the battery units, there's not enough space for both) and just become dual voltage.
3rd rail has some benefits, and I don't think there'd be room in the tunnels for OLE.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Do you mean 20m down the line towards Southport?

Yes, to give enough room for a turnout after the bridge.

If so, would that mean the Merseyrail service would join the Southport-Wigan line and then spur off it for a 3rd platform

Yes.

, or would a third set of tracks run alongside the Southport-Wigan line and then split into two, one set going to the Merseyrail platform and the other joining the Southport-Wigan line (similar to Hunts Cross, sans third rail)?

The road bridge only has room for two tracks. Doing it that way would be extraordinarily expensive (as it would require a new bridge and significant streetscape modifications) and not really necessary when Merseyrail units would only be running on the Southport bound line from Manchester for less than a train length.

You'd only need to move the Southport bound platform, the other one could stay where it is.

== Doublepost prevention - post automatically merged: ==

I doubt the 3rd rail would be replaced, especially since 777s can have a pantograph fitted (except the battery units, there's not enough space for both) and just become dual voltage.
3rd rail has some benefits, and I don't think there'd be room in the tunnels for OLE.

There definitely wouldn't be room through Moorfields on the Northern Line without significant work - the ceilings there are very low.

There's no real need to convert Merseyrail. If they wanted to do it for safety reasons, they could switch to bottom-contact using the standard used by the DLR and pretty much every German U-Bahn.
 

chris53

Member
Joined
12 Feb 2024
Messages
59
Location
West Lancashire
Well said! The bus routes I mentioned earlier (the 312, 740, 742, 744, 746 and 769) in post #567 show decent local connections within Skem but then seem to be one an hour at best (the 312, like you said) but then as low as once per day according to bustimes.org. Either increasing some of these routes to 1 or 2 buses per hour or creating a new route with inspiration from them would not only be worthwhile, but I would argue necessary!

Agreed, although where do you think that platform would go? My first thought was on the curve to keep the main line free, but that produces accessibility concerns. Using the current south platform as an island platform would mean destroying the modern... (something?)* building.

*(Signs on the side call it Burscough Bridge Interchange. Is it a cafe? Community centre? Station building? Waiting shelter?)

Edit: Wikipedia says it's "disused"
The building was opened in 2005 as a ticket office. It closed in 2016. The building was leased by Lancashire County Council from Network Rail on a 50 year lease. Burscough Town Council have taken over the remainder of the lease and now use it as their offices.
 

CaramellDansen

On Moderation
Joined
6 Jan 2024
Messages
175
Location
Liverpool
especially since 777s can have a pantograph fitted (except the battery units, there's not enough space for both) and just become dual voltage.
Yeah, that's exactly what I meant!
3rd rail has some benefits...
I disagree!
...and I don't think there'd be room in the tunnels for OLE.
That's fine, for now. Just nominate a station where the changeover happens, one north and one south of the city centre (for the Northern line, anyway).
There's no real need to convert Merseyrail.
If you want to stay in the past and never ever expand beyond the state of the network today? Sure.
That's not good enough. Third rail is dead, and we need to move past it eventually.
they could switch to bottom-contact using the standard used by the DLR and pretty much every German U-Bahn.
Would the ORR accept this, given their prohibition on conductor rails?
not really necessary when Merseyrail units would only be running on the Southport bound line from Manchester for less than a train length.
Fair!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
If you want to stay in the past and never ever expand beyond the state of the network today? Sure.
That's not good enough. Third rail is dead, and we need to move past it eventually.

That's not really true, though, as the 777s can be fitted with a pantograph and transformer in addition to the third rail capability.

Would the ORR accept this, given their prohibition on conductor rails?

Good question. As it's a much safer system I suspect they would, yes.
 

CaramellDansen

On Moderation
Joined
6 Jan 2024
Messages
175
Location
Liverpool
That's not really true, though, as the 777s can be fitted with a pantograph and transformer in addition to the third rail capability.
I mean institutionally depending on it. Obviously I believe the dual system of both third rail and OLE is fitting here, at least in the short term, or third rail for just the underground sections. That's not what I'm opposing.
I'm more talking about the seeming refusal to do any kind of infrastructural work in adding OLE, and relying on this battery malarkey, and using these as excuses to not extend the network any further than a single station here and there.

Put the bloody pantographs on the trains and stick some damn wires over the tracks like the rest of the world has been doing for literally over a century. Then Merseyrail can actually expand in a substantive way for the first time since the line south of Rock Ferry was electrified, if I recall correctly... which is a shocking (pardon the pun) and embarrassing amount of time. The Gateacre (and hopefully further, maybe even the loop line, as I've argued for both further up in this thread), Burscough and Skem / Wigan extensions are literally decades overdue, and it's a disgrace that we've just accepted this stagnation as just the way things are. We should demand more!
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Would the ORR accept this, given their prohibition on conductor rails?
There is no prohibition or de-facto prohibition on conductor rails as such.

There is a de-facto prohibition on new installations of top contact third rail operated by Network Rail using current Network Rail operational practice.

These are two very different things.

I expect, in the case of Merseyrail extensions, the cheaper option would be to make the required changes for operational practice rather than spring ~£4m/stkm for a 25kV system, which would require sacrificing any attempt at battery operation.
As it is, it is likely battery operation would be adequate for essentially everywhere except maybe the Borderlands line and any extension to Preston.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,157
Agreed, although where do you think that platform would go? My first thought was on the curve to keep the main line free, but that produces accessibility concerns. Using the current south platform as an island platform would mean destroying the modern... (something?)* building.

*(Signs on the side call it Burscough Bridge Interchange. Is it a cafe? Community centre? Station building? Waiting shelter?)
A bay platform on the site of the building/parking at Burscough Bridge Interchange would be perfect. You could fund a multistorey on the site of the adjacent Tesco car park for both shoppers and rail users to replace the parking.
There is minimal need or justification to change the current rail provision in the Aughton/Ormskirk/Burscough area, which is entirely within West Lancashire and thus outwith Merseyside. The proposals that several posters on this thread are making would destroy the through rail service from Ormskirk to Preston. Virtually no one is going to change trains at Burscough Bridge. There are adequate bus services from Ormskirk to Wigan and to Southport, together with an express bus (X2) from Southport to Preston. There aren't enough battery/electric class 777 trains to serve both the Ormskirk and Kirkby lines to allow Merseyrail extensions beyond the end of the 3rd rail electrification at Ormskirk.
Destroying the interchange at Ormskirk is irrelevant.

Moving it one stop down the line maintains the journey time (the acceleration and reduced dwell times of the Class 777 on the new Merseyrail section), reduces the operational subsidy for Northern (Preston to Southport via Burscough would be far more popular than the existing Ormskirk to Preston shuttle), and introduces a fast and reliable direct Merseyrail service into Liverpool (this part of West Lancs is as much prime Liverpool commuter belt as Littleborough or Wilmslow is for Manchester) for the approximately 10,000 residents of Burscough and the adjoining settlements.

As for the existing bus connections - several of them are subsidised by Lancashire County Council; if they were a reasonable public option, they would be able to be operated commercially by Stagecoach without subsidy.

The exception to this rule is the X2 - however, the Preston to Southport link would perform the additional purpose of a Park and Ride for the large volume of Southport daytrippers in the Blackburn with Darwen/Chorley/South Ribble areas at Croston station (parking is expensive and poorly located for a lot of the attractions in Southport, especially since the 3 Park and Rides have closed down).

This is a frequent use case that the X2 cannot practically fulfill, due to the significant time and effort involved with driving into Preston, parking and then an hour on a bus into Southport. The alternative options along the Wigan - Southport line are already well used, due to Manchester commuting or visits to other significant attractions in the area (e.g. Martin Mere).

Croston station is only 15 mins from M6 J28 in Leyland and would only be around 28 mins (13 mins Croston to Burscough Bridge + 15 mins Burscough Bridge to Southport currently) to Southport on the train, far more competitive than the existing drive into Preston and X2 option.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
There is no prohibition or de-facto prohibition on conductor rails as such.

There is a de-facto prohibition on new installations of top contact third rail operated by Network Rail using current Network Rail operational practice.

These are two very different things.

I expect, in the case of Merseyrail extensions, the cheaper option would be to make the required changes for operational practice rather than spring ~£4m/stkm for a 25kV system, which would require sacrificing any attempt at battery operation.
As it is, it is likely battery operation would be adequate for essentially everywhere except maybe the Borderlands line and any extension to Preston.
I think the reason that the overhead option isn't being used is that means Network Rail having to do some work to install catenary and power supplies, whereas the battery option transfers most of the cost and risk to the train operator. So either DfT or NR (whoever is really making the decision) does just that. This is why bi-mode trains are appearing so widely. It's just shifting the risk - to the wrong place, in my opinion. Electrify the lines and every train can be single power supply electric, relatively simple designs. Don't electrify and every train on a route has to be bi-mode or diesel, not the best long term solution.
 

Mr. SW

Member
Joined
13 Sep 2023
Messages
528
Location
Armchair
Batteries should not be used on metro-style services that demand high acceleration and frequency such as Merseyrail. They're just extra dead weight to cart about for no significant real gain and may even be a hinderance. It's just seems to me to be a way to kick OLE into the long grass.

If you were going to put OLE on Merseyrail, do as much as possible using the economy of scale.
That would be everything north and east of Sandhills and south of St Michaels on the Northern Line, and west of Birkenhead Park and south of Rock Ferry on the Wirral line. Then third rail would be retained on the inner sections only on a "Tunnel equals Third Rail" basis, and keeping it out of the way of people's feet.
Infrastructure changes to be made (natch).

I'm sure it won't happen though.

Question: Are any changes going to be made to Sandhills station regarding the possible pressure being put on it by the new stadium at Bramley Moore Dock?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
If you were going to put OLE on Merseyrail, do as much as possible using the economy of scale.
Economies of scale might make each track kilometre cheaper but they won't make the scheme cheaper!
We are looking at ~£4m per single track kilometre these days (Midland Main Line schemes), so ~£8m per route kilometre.

That's an awful lot of money.
Replacement of third rail with 25kV on Merseyrail would provide very few operational benefits and the would cost more than a billion pounds.

Beyond Bidston-Wrexham, and an extension to Wigan, there isn't too much more expansion than needs doing. Even including a hypothetical Warrington extension its only a few dozen more kilometres.
 
Last edited by a moderator:

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,594
Location
Greater Manchester
If you were going to put OLE on Merseyrail, do as much as possible using the economy of scale.
That would be everything north and east of Sandhills and south of St Michaels on the Northern Line, and west of Birkenhead Park and south of Rock Ferry on the Wirral line. Then third rail would be retained on the inner sections only on a "Tunnel equals Third Rail" basis, and keeping it out of the way of people's feet.
Infrastructure changes to be made (natch).
How many low bridges would you run into?
My guess is a lot, several bridges on the line between Wigan and Lostock Jn are too low and having to be replaced/raised and that's only 6.5 miles, the sections you describe are over 80 miles.
North of Sandhills - 51 miles.
South of St Michaels - 4.5 miles
West of Birkenhead Park - 11.5 miles
South of Rock Ferry - 16.5 miles

If you're going to keep dual voltage anyway, just keep the bits that already have it and don't throw money at something that doesn't need to be replaced.
Every track km of OLE done over third rail (except at the changeover point obviously) means somewhere else diesels are running that don't have to.

Until most of the country is electrified I think replacing 3rd rail is a waste of money.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
To me the best way would be to move the station maybe 20 metres towards Tesco, then there'd be ample room for a turnout, with the new platform face's track on what is now car parking. It would lose that building but it's hardly a big thing in the scheme of things. Replacement parking could be provided elsewhere.
Move the bowls club and put the platform there. They have an access arch under the road that can be used for passengers to get to the current station.
I think it would be better to keep the Merseyrail service completely off the Northern rails and platforms, for operational simplicity.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
First thoughts on hearing the term Baltic is cold!!!!
Quite! To be honest I had no idea that the discussion on naming Baltic had resurfaced. If I were benign dictator for a day, I'd stick with the old St James name, and rename James Street to something along the lines of Liverpool Waterfront... after I'd changed the Elizabeth Line to "Crossrail Line 1" and used the Elizabeth Line name for the Jubilee, which as it stands is named for a now insignificant milestone... but that is very much off topic so I'll leave it at that!
That’s why I personally would only want the Headbolt Lane line from Wallgate to become part of Merseyrail. Part of me also still kinda wants Skem to get an extension.
For a bit of blue-sky thinking, how about extending from Headbolt to Skelmersdale as per the previous scheme, but continuing on a new alignment to the old station in the area now known as "Old Skem". Then picking up the (AIUI mostly intact old formation to Ormskirk via Westhead.
Of the 4tph currently heading to Ormskirk, 2tph run to an expanded Burscough Bridge (Junction to close) with the other 2tph running via Westhead, Old Skem (stations at one or both) and Skelmersdale Newtown and back into Liverpool via Kirkby. The Kirkby trains then run as 2tph to Wigan Wallgate and 2tph round the Skem loop back to Liverpool via Ormskirk. This would probably want electrification, meaning replacing the batteries with transformers and pantographs (or just pans if DC overheads were used), with these changes applied to a larger proportion of the 777 fleet (if not the whole fleet).
You know, it's hilarious to me that this is the grand "Interchange" Burscough gets, but all they have is one single bus stop and at most 30 parking spaces, serving an infrequent and unelectrified line. This country is a laughing stock.
"Interchange" is often used as a window-dressing buzzword, particularly by PTEs. For every sensible use (Bradford, Barnsley, Meadowhall) there are some downright absurd ones too. Prime examples both from WYPTE being Denby Dale Interchange (name only used officially with buses) which is a bus shelter at a turning circle about 50m from a single platform station with an hourly service. Even worse is Waterloo Interchange in Huddersfield, which was nothing more than a collection of bus stops around a busy road junction, with a couple of additional (and outdated) information posters!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Quite! To be honest I had no idea that the discussion on naming Baltic had resurfaced. If I were benign dictator for a day, I'd stick with the old St James name, and rename James Street to something along the lines of Liverpool Waterfront... after I'd changed the Elizabeth Line to "Crossrail Line 1" and used the Elizabeth Line name for the Jubilee, which as it stands is named for a now insignificant milestone... but that is very much off topic so I'll leave it at that!

As Baltic is an adjective I think it sounds clumsy, but "Baltic Triangle" would have worked for me.

For a bit of blue-sky thinking, how about extending from Headbolt to Skelmersdale as per the previous scheme, but continuing on a new alignment to the old station in the area now known as "Old Skem". Then picking up the (AIUI mostly intact old formation to Ormskirk via Westhead.

That'd be a lot costlier than expanding Upholland and wouldn't really bring many more benefits.
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,927
Location
Exeter
If you were going to do this you would probably do two Tfl trains an hour Wrexham to Bidston and two Merseyrail battery/electric trains an hour Neston (say) around the Liverpool loop.

I think the capacity is there but it is a bit messy.

Again, Neston is not in LCR which, despite what some people here think, is a big problem. LCR will always in practice focus on developments within itself (e.g. Headbolt Lane (near the boundary but within it) , Maghull North (near the boundary but within it), Halton Curve (mainly if not exclusively in LCR), Liverpool Baltic, Halewood (near the boundary but within it), Wavertree Technology Park, Liverpool South Parkway, Eastham Rake (near the boundary but within it).

I would feel more confident if the good folks of Cheshire and Lancashire showed some inclination to take some money out of their pockets.
My suggestion on another thread was for TfW to acquire some bi-mode 777s with long-life batteries and extend the Borderlands line to Birkenhead North, but I was informed that a turn-back there would require resignalling and that running round the loop was preferable. This would allow batteries to be recharged. There is a depot at BKN and when I passed it last week it contained a 230 so I assume there is an arrangement for TfW to use it. Bidston is generally agreed to be an awkward place to terminate. Not really "Merseyrail expansion" though unless the trains were jointly owned.......
 
Status
Not open for further replies.

Top