could anyone advise what if there is a signal box controlling a Manually controlled barrier and as part of upgrades they were looking to close this box, what are the alternatives to this? The new controlling signal box would be almost an hour away and one train working is being considered for that section of line, how would that work for the crossing? I’m aware you have Obstacle Detection and CCTV options but would that mean the barrier stays closed as soon as the train enters the section or is there a way it can be done after the train enters the section? Any thoughts?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Dunragit, I presume? A trainman operated barrier crossing may be an appropriate solution, or perhaps an AFBCL, assuming that full barriers are deemed to be necessary. ABCL if full barriers are not required.

A CCTV or MCB-OD crossing need not be closed as soon as a train enters the section if the crossing has its own protecting signals (but this would be an expensive option).
 
Last edited:

MarkyT

Established Member
Joined
20 May 2012
Messages
7,555
Location
Torbay
could anyone advise what if there is a signal box controlling an MCB and as part of upgrades they were looking to close this box, what are the alternatives to an MCB? The new controlling signal box would be almost an hour away and one train working is being considered for that section of line, how would that work for the crossing? I’m aware you have OD and CCTV options but would that mean the barrier stays closed as soon as the train enters the section or is there a way it can be done after the train enters the section? Any thoughts?
Even if such a crossing is in a very long block section with the section signals many, many miles away, additional signals will be provided closer to an OD or CCTV crossing protecting it in both directions. These may not be block signals for trains following each other but are simply there to delay closing the crossing until the train is much closer. These are the signals that prove the control and road warning light sequence has occurred correctly and the barriers are now down and intact. The road closed time can still be a few minutes to avoid trains seeing restrictive aspects for OD and CCTV. If a local speed restriction of 55mph or below is acceptable with good approach visibility, the newish AFBCL design mentioned by Railsigns might be used instead, which actuates automatically and, like an ABCL, is then locally monitored by an approaching train driver observing a flashing red/white indicator and inspecting the road. This can significantly reduce the road closed time compared to standard CCTV and OD MCB types.

== Doublepost prevention - post automatically merged: ==

Dunragit, I presume? A trainman operated barrier crossing may be an appropriate solution, or perhaps an AFBCL, assuming that full barriers are deemed to be necessary. ABCL if full barriers are not required.

A CCTV or MCB-OD crossing need not be closed as soon as a train enters the section if the crossing has its own protecting signals (but this would be an expensive option).
Traincrew-operated would be costly in time. ABCL or AFBCL would be my favoured option. If there's any likelihood of an additional station in the immediate vicinity, any necessary crossing speed restrictions may be more acceptable.
 
Last edited:

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,084
Location
Wilmslow
MCB - Manually Controlled Barriers according to https://en.wikipedia.org/wiki/Level_crossings_in_the_United_Kingdom

MCB-OD – manually controlled barriers monitored by obstacle detection

AFBCL – automatic full barrier crossing locally monitored

ABCL – automatic barrier crossing locally monitored

== Doublepost prevention - post automatically merged: ==

Sorry, but this thread was completely baffling without looking up what these abbreviations meant.
 
Last edited:

Dartspro123

Member
Joined
16 Jan 2025
Messages
5
Location
Scotland
Dunragit, I presume? A trainman operated barrier crossing may be an appropriate solution, or perhaps an AFBCL, assuming that full barriers are deemed to be necessary. ABCL if full barriers are not required.

A CCTV or MCB-OD crossing need not be closed as soon as a train enters the section if the crossing has its own protecting signals (but this would be an expensive option).
Yes heard they might be upgrading this line in this control period and wondered what that might look like with if they’re trying to close the boxes completely and still needed the barrier while controlling it from a box further north
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,481
Location
Northampton
Yes heard they might be upgrading this line in this control period and wondered what that might look like with if they’re trying to close the boxes completely and still needed the barrier while controlling it from a box further north
Assuming it is this location: https://maps.app.goo.gl/sHkewXT1cjdHT6Fz5, having looked at Google Maps I'd be very surprised if the crossing wasn't simply closed and a footbridge provided with road traffic diverted via the bypass.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,494
Location
Moorpark, CA
Yes heard they might be upgrading this line in this control period and wondered what that might look like with if they’re trying to close the boxes completely and still needed the barrier while controlling it from a box further north
Nothing firm, but there has been some talk of reinstating a Signalling Centre at Paisley with a view to it ultimately covering the whole “South West Scotland“ area.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,555
Location
Torbay
Nothing firm, but there has been some talk of reinstating a Signalling Centre at Paisley with a view to it ultimately covering the whole “South West Scotland“ area.
Once you leave Ayr (under W of Scotland SC) there are six signalboxes to Stranraer, a lot of operational expense for such a sparse service. At least Stranraer can be switched out.
 

Dartspro123

Member
Joined
16 Jan 2025
Messages
5
Location
Scotland
Nothing firm, but there has been some talk of reinstating a Signalling Centre at Paisley with a view to it ultimately covering the whole “South West Scotland“ area.
Think that’s the ultimate end goal is it not? To have a number of smaller signalling centres rather than 2 or 3 but I thought that was a long term plan for the next 25/30 years not right now?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,481
Location
Northampton
Once you leave Ayr (under W of Scotland SC) there are six signalboxes to Stranraer, a lot of operational expense for such a sparse service. At least Stranraer can be switched out.
Given the service, one RETB (or equivalent) workstation can probably cover the entire line. Amd it could be located wherever is easiest.

Big question would be what the impact of level crossings would be.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,555
Location
Torbay
Given the service, one RETB (or equivalent) workstation can probably cover the entire line. Amd it could be located wherever is easiest.

Big question would be what the impact of level crossings would be.
Or a minimal TCB scheme with long axle counter blocks. The line doesn't need so many passing loops today, especially once past Girvan, and some of the road crossings might be closed, like your suggestion for Dunragit. There are many UWCs.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Why can’t Dunragit be an auto half barrier? Are they out of favour, even for such an infrequent service?
Though I agree that if a foot crossing was left there would be little hardship in closing it.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,555
Location
Torbay
Why can’t Dunragit be an auto half barrier? Are they out of favour, even for such an infrequent service?
Though I agree that if a foot crossing was left there would be little hardship in closing it.
AHBCs seem to be going out of favour today with most being replaced by better-protected types when equipment is renewed today. I'm very happy about that personally. Locally monitored is a safer option if a possibly lower speed limit is acceptable at a particular site on such a rural line. Dunragit can probably be closed or downgraded to a foot only status however.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,963
Given the service, one RETB (or equivalent) workstation can probably cover the entire line. Amd it could be located wherever is easiest.

Big question would be what the impact of level crossings would be.
The Heart of Wales system seems to cope with multiple level crossings and passing loops, from a single box at Pantyffynnon. It's a sparse service, but probably not much different from Girvan to Stanraer.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,555
Location
Torbay
The Heart of Wales system seems to cope with multiple level crossings and passing loops, from a single box at Pantyffynnon. It's a sparse service, but probably not much different from Girvan to Stanraer.
I wouldn't implement a new system today with manual token exchange. It's quite time-consuming operationally at each loop and imposes an additional staffing requirement to balance the tokens periodically at each remote site. A simple TCB installation with axle counters would be more efficient and probably no more expensive with modern techniques. Remember the remote passing loops on the HoW all now have multiple indicators, TPWS loops and a small relay interlocking to switch powered point machines since all the self-actuated hydropneumatic ones were replaced.
 

matchmaker

Established Member
Joined
8 Mar 2009
Messages
1,877
Location
Central Scotland
Nothing firm, but there has been some talk of reinstating a Signalling Centre at Paisley with a view to it ultimately covering the whole “South West Scotland“ area.
I'm sure I saw somewhere that there was talk of scaling back the expansion of the East Scotland ROC (and West of Scotland ROC?) and instead opening some smaller Signalling Centres.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,494
Location
Moorpark, CA
I'm sure I saw somewhere that there was talk of scaling back the expansion of the East Scotland ROC (and West of Scotland ROC?) and instead opening some smaller Signalling Centres.
That’s what I recall, part of which was that whenever a decision is eventually made about Perth, it will retain a local signaling presence.

== Doublepost prevention - post automatically merged: ==

I'm sure I saw somewhere that there was talk of scaling back the expansion of the East Scotland ROC (and West of Scotland ROC?) and instead opening some smaller Signalling Centres.
That’s what I recall, part of which was that whenever a decision is eventually made about Perth, it will retain a local signaling presence.
 
Last edited: