I thought I'd create a new thread because today is the start of the big change to the FCC timetable, with 'new' rolling stock, longer trains and some rather major changes to inner and outer suburban stopping patterns.
Now, there are sure to be teething problems but this morning didn't inspire confidence.
The new 0902 Hat - KGX service, shown on the front as 'Not in svc', was running late, having started from Hitchin late. It crawled along, and with no stopping service close ahead I presume it may have been a train fault - but it did get stuck behind a Hertford North - Moorgate train, the one that I should have been able to connect with according to the new timetable.
As both trains use the slow line, I wonder if this is going to be a regular problem - namely getting put in behind the stopper if it's late to Bounds Green/Alexandra Palace? There's only 4 minutes between them.
Back to Hatfield, and it was rather odd to see a FCC service stopping on platform 3 (the fast line) and a NXEC train passing through on the slow (platform 4)! What's that all about?!
The main changes are to the paths through the Digswell Viaduct, so I wonder how that is going to work throughout the day. Is there now more scope for recovery, or is this morning a sign that things are even tighter?
Now, there are sure to be teething problems but this morning didn't inspire confidence.
The new 0902 Hat - KGX service, shown on the front as 'Not in svc', was running late, having started from Hitchin late. It crawled along, and with no stopping service close ahead I presume it may have been a train fault - but it did get stuck behind a Hertford North - Moorgate train, the one that I should have been able to connect with according to the new timetable.
As both trains use the slow line, I wonder if this is going to be a regular problem - namely getting put in behind the stopper if it's late to Bounds Green/Alexandra Palace? There's only 4 minutes between them.
Back to Hatfield, and it was rather odd to see a FCC service stopping on platform 3 (the fast line) and a NXEC train passing through on the slow (platform 4)! What's that all about?!
The main changes are to the paths through the Digswell Viaduct, so I wonder how that is going to work throughout the day. Is there now more scope for recovery, or is this morning a sign that things are even tighter?