• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Maximum allowed width for trains in UK?

Status
Not open for further replies.

Wardog

Member
Joined
21 Feb 2015
Messages
27
Also, what is the maximum allowed speed through grade crossings in UK?

In Denmark it is 140 km/h, when ATC is installed.

Im not for sure about the maximum allowed Width for trains in Denmark, other than we got 3,15 wide trains on the intercity lines, and even 3,6 meter wide commuter trains around the Copenhagen area.

It could be interesting to compare ;)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,961
Location
Airedale
125mph is permitted for supervised crossings, and there are some such on the East Coast route, but only 100mph for automatic crossings. At that speed the lines have AWS.

Maximum width at waist level on most routes is approximately 2.8m but some ex Great Western routes allow a slightly greater width, and HS1 is built to standard European width.
An oversimplification but it will do to start with.
 

Wardog

Member
Joined
21 Feb 2015
Messages
27
125mph is permitted for supervised crossings, and there are some such on the East Coast route, but only 100mph for automatic crossings. At that speed the lines have AWS.

Maximum width at waist level on most routes is approximately 2.8m but some ex Great Western routes allow a slightly greater width, and HS1 is built to standard European width.
An oversimplification but it will do to start with.
Thanks, thats a good answer for starters :)

Seems it was not too foresighted to place the tracks so close, that it only permits 2,8 meter wide trains, if you dont mind me saying so. It doesnt permit for 2 + 3 seating, or 2 + 2 comfortable wide seats. Its a shame really...
 

Zoidberg

Established Member
Joined
27 Aug 2010
Messages
1,270
Location
West Midlands
Thanks, thats a good answer for starters :)

Seems it was not too foresighted to place the tracks so close, that it only permits 2,8 meter wide trains, if you dont mind me saying so. It doesnt permit for 2 + 3 seating, or 2 + 2 comfortable wide seats. Its a shame really...

But, but, I've been on trains here with 2+3 seating. Unless I was imagining ...
 
Last edited:

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Maximum width varies not just with route, but with length. There's essentially two main standard sizes currently- 20m(ish) long carriages are ~2.8m wide, 23m long carriages are ~2.7m wide. Mostly, modern EMUs are 20m stock and DMUs 23m stock (exceptions are numerous). ~2.8m is the widest that straight platforms (where the body length is unimportant) will take and thus is the "hard" limit.
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
Seems it was not too foresighted to place the tracks so close, that it only permits 2,8 meter wide trains, if you dont mind me saying so. It doesnt permit for 2 + 3 seating, or 2 + 2 comfortable wide seats. Its a shame really...

I blame those nasty Stephenson's fancy not realising in the early 1830's that people would want to carry 9'-6" containers of electronics from China, or that with a bit of development the Rocket could be made to do 125MPH as standard.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
I blame those nasty Stephenson's fancy not realising in the early 1830's that people would want to carry 9'-6" containers of electronics from China, or that with a bit of development the Rocket could be made to do 125MPH as standard.

In fairness to Robert Stephenson, the Conwy and Britannia tubular bridges (see my avatar) were a better shape for containerised freight than all those silly brick arches... :P
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,222
Location
Stockport
I think the widest trains to run here were the class 503 EMUs (3.02m.)? although that was the overall width including the step boards.
 

Wardog

Member
Joined
21 Feb 2015
Messages
27
I think the widest trains to run here were the class 503 EMUs (3.02m.)? although that was the overall width including the step boards.
I wonder about the cost per km of track relaying, in order to make space for 3,4 meter wide trains? Allowing for 2 + 3 comfortable seating. ;)
 

Deerfold

Veteran Member
Joined
26 Nov 2009
Messages
13,728
Location
Yorkshire

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,279
I wonder about the cost per km of track relaying, in order to make space for 3,4 meter wide trains? Allowing for 2 + 3 comfortable seating. ;)

The track repositioning is comparatively trivial, once you've moved all the platforms, and widened all the under-bridges, over-bridges, cuttings, embankments and tunnels.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,675
Location
Nottingham
I wonder about the cost per km of track relaying, in order to make space for 3,4 meter wide trains? Allowing for 2 + 3 comfortable seating. ;)

You have to relay the tracks further apart. Which means you will also have to replace practically every bridge, tunnel, signal, OLE support etc since if it didn't infringe the clearances of the wider trains to start with it would do when the track was moved outwards. Not to mention buying a strip of land alongside the railway for most of its length to widen the formation, including bits of thousands of back gardens which people won't want to give up.

Probably more expensive, and certainly vastly more hassle, than building a new route on a totally new alignment which can avoid most of the built-up areas.
 

Wardog

Member
Joined
21 Feb 2015
Messages
27
You have to relay the tracks further apart. Which means you will also have to replace practically every bridge, tunnel, signal, OLE support etc since if it didn't infringe the clearances of the wider trains to start with it would do when the track was moved outwards. Not to mention buying a strip of land alongside the railway for most of its length to widen the formation, including bits of thousands of back gardens which people won't want to give up.

Probably more expensive, and certainly vastly more hassle, than building a new route on a totally new alignment which can avoid most of the built-up areas.
In other words; Mission Impossible! ;)
 
Status
Not open for further replies.

Top