All trains at a standstill. Marylebone Signal Box evacuated as is the station.
Saw that from the train, big fire at a waste recycling place.Nationalrail infers there are two seperate fires:
![]()
Incident: Harrow-on-the-Hill | National Rail
Disruption between London Marylebone and Harrow-on-the-Hill expected until 14:00. Find details of all current incidents on National Rail Enquiries.www.nationalrail.co.uk
I would to be fair suspect their control is extremely overworked and very short of crew and units given the Marylebone chaos. Running a short shuttle will not be high on their priorities.The fire is all the way down in Wembley yet Chiltern have completely thrown in the towel as usual and suspended the MET line service, no shuttle to Amersham or even just Great Missenden, nothing!
Although I shouldn't be surprised, even the littlest of issues and Chiltern gives up on this line.
Apart from this thread is talking about something unrelated to the fire at Wembley. Trying to operate a service with the signalbox closed is a little difficult.The fire is all the way down in Wembley yet Chiltern have completely thrown in the towel as usual and suspended the MET line service, no shuttle to Amersham or even just Great Missenden, nothing!
Although I shouldn't be surprised, even the littlest of issues and Chiltern gives up on this line.
Chiltern Railways JourneyCheck - Train times and live real time delay/cancellation/disruption information.
Chiltern Railways JourneyCheck provides real time, up-to-date train times and train disruption information keeping you informed about any delays or cancellations on the network and helping you know what to do when your journey is affected. Train Cancellations, Delays, Alterations and...www.journeycheck.com
NoneWhich signal box or contingency plan is used whilst Martlebone is closed?
There will be a contingency plan but no other signal box can control it, as you probably already knew.Which signal box or contingency plan is used whilst Martlebone is closed?
Yep, as demonstrated to the travelling public on previous fail days.There will be a contingency plan but no other signal box can control it, as you probably already knew.
Do you feel services should have still operated from Marylebone?, What would be your priority and how would you activate such a plan?Yep, as demonstrated to the travelling public on previous fail days.
No. I was just confirming that from previous failure scenarios there is no resilience for the Marylebone signalling cabin. When it's down, it's down, and nothing is going to move until it's back up in service.Do you feel services should have still operated from Marylebone?, What would be your priority and how would you activate such a plan?
Where or how would you suggest that resilience resource to be sited?No. I was just confirming that from previous failure scenarios there is no resilience for the Marylebone signalling cabin. When it's down, it's down, and nothing is going to move until it's back up in service.
I would suggest it would be sensible for Network Rail to build in some resilience for Marylebone, and the priorities for any service operated in a resilience scenario needs to be informed by the capability of the resilience, plans to fail over and fail back, and any operating procedures that are tested and agreed.
I think you might have picked up some of the commentary around the Cross Country control centre and run a bit far with it. A TOC control centre is very broadly speaking a load of desks with computers and a decent connection to the internet.No. I was just confirming that from previous failure scenarios there is no resilience for the Marylebone signalling cabin. When it's down, it's down, and nothing is going to move until it's back up in service.
I would suggest it would be sensible for Network Rail to build in some resilience for Marylebone, and the priorities for any service operated in a resilience scenario needs to be informed by the capability of the resilience, plans to fail over and fail back, and any operating procedures that are tested and agreed.
No signalbox or control centre has a backup site. There's a lot of engineering resilience built into the system, however: Duplicated power feeders, uninterruptible supplies for the main systems, twin diversely routed trackside datalink cables, etc, but none of that can help in an evacuation.No. I was just confirming that from previous failure scenarios there is no resilience for the Marylebone signalling cabin. When it's down, it's down, and nothing is going to move until it's back up in service.
I would suggest it would be sensible for Network Rail to build in some resilience for Marylebone, and the priorities for any service operated in a resilience scenario needs to be informed by the capability of the resilience, plans to fail over and fail back, and any operating procedures that are tested and agreed.
Yep and yep. So if all day its another Cross Country scenario.There will be a contingency plan but no other signal box can control it, as you probably already knew.
But what is new here? Its been the case since the 60s with the addition of PSBs etc.Yet another 'don't put all your eggs in one basket' scenario. Like software on trains that fails the whole unit for some minor fault that doesn't physically prevent the train running, except the computer says no. Like Cross Country a few days ago. Like banks, supermarkets and airports having a failure that stops everything. Progress is supposed to improve things and make them more resilient to problems, not less so.
Except there is no realistic alternate option in many of these cases. These costs of these alternatives, particularly in something safety critical like signalling, would be extraordinary, both in initial installation and in maintenance.Yet another 'don't put all your eggs in one basket' scenario. Like software on trains that fails the whole unit for some minor fault that doesn't physically prevent the train running, except the computer says no. Like Cross Country a few days ago. Like banks, supermarkets and airports having a failure that stops everything. Progress is supposed to improve things and make them more resilient to problems, not less so.
What units have you been on that an aircon fault has knocked them out? Discounting when they are taken out of service because the temperature is unsafe.Manual signal box problems were just for that box. The section would bypass that box until it was fixed. Older diesels could have problems that didn't disable it, although sometimes there were total failures of course. Mechanical ones, not IT having a fit over a dirty windscreen or something equally trivial. Clean it and carry on. If they had had air con in the first place, it could fail without knocking out the whole loco, as seems to happen now. Dawlish waves didn't knock out whole trains as they do the delicate little darlings that are modern units. Even less so in steam days. the crew got wet, but they carried on.
Keep Calm and Carry On as it used to be. Now it is stop everything and panic. The passenger comes last in the priorities.