• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Marston Vale Line Rail Replacement Service

Status
Not open for further replies.

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,917
Location
Fenny Stratford
The Marston Vale line ( Bedford - Bletchley Line) was supposed to be closed to rail traffic with a replacement bus service due to the Bletchley engineering works over Christmas. The line was supposed ot be closed unitl 2nd January.

However, the service is still suspended and will now remain so until the 14th according to LM and the 15th according to National Rail Enquires! We are told that this is due to engineering works. LM indicate they were given very short notice by NR that the works would be extended. However not very much seems to be going on.

My question is does anyone know what works, specifically, are taking place that means the line is closed for an extended period?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mike395

Forum Staff
Staff Member
Administrator
Joined
23 May 2009
Messages
3,393
Location
Bedford
They are re-signalling the Bletchley end in preparation for services to run through to Milton Keynes Central - and I believe using the necessary blockade to do other general maintenance throughout the rest of the line - I believe this was slowed due to the bad weather we have had in recent weeks :)
 

eMeS

Member
Joined
12 Jun 2011
Messages
954
Location
Milton Keynes, UK
Will the trains from Bedford to Milton Keynes use a new platform(s) at Bletchley, or stop and then reverse through to Milton Keynes? Looking at Google maps of Bletchley station, it looks as though some extra track might be needed?
 

Mike395

Forum Staff
Staff Member
Administrator
Joined
23 May 2009
Messages
3,393
Location
Bedford
Trains from Bedford can use either P5 or P6 at Bletchley (currently, they usually only use 6 unless there's disruption) - from memory, I think you can get onto the slow lines to/from MK from 5 but not 6, so I think they will either have to change the platform used or build a crossover from 6. :) (either way, they will have to reverse)
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,917
Location
Fenny Stratford
Platform 5 is not in use until April. There is a nice new stop block at the London end of P.6.

Once the work is done 6 will go OOU ( unless needed for an emergency/disruption) and all trains will use P.5, reversing there to reach MK via the new line they are builiding. Trains will terminate in P.2A at MKC. I think it might happen this time!

I only ask about the engineering work as there doesnt seem to be much happening or much machinery in the area ;)
 

eMeS

Member
Joined
12 Jun 2011
Messages
954
Location
Milton Keynes, UK
Thanks, Mike. The quicker it's completed the better.
--- old post above --- --- new post below ---
Will the service commence using DMUs before the Marston Vale line is electrified, or does the whole thing depend on, I assume, the faster acceleration of EMUs?
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,917
Location
Fenny Stratford
Thanks, Mike. The quicker it's completed the better.
--- old post above --- --- new post below ---
Will the service commence using DMUs before the Marston Vale line is electrified, or does the whole thing depend on, I assume, the faster acceleration of EMUs?

It is supposed to start at the next timetable chnage so it will have to be DMU operation. I am sure the LM 150/153 can cope :roll:
 

nr_signaller

Member
Joined
6 Feb 2011
Messages
94
DarloRich:1318455 said:
Platform 5 is not in use until April. There is a nice new stop block at the London end of P.6.

I only ask about the engineering work as there doesnt seem to be much happening or much machinery in the area ;)

I don't believe the infrastructure is in place to get the unit onto the branch at the moment? Due to remodelling at Bletchley
 
Status
Not open for further replies.

Top