Bay platforms would be on the other side, where Manchester Exchange used to be.
This is the obvious solution for west facing bay platforms and these are part of the new plan for the area, but it is their situation that still bothers me, due to the the proposed development at Greengate that is a joint project with Ask Developments and National Rail. Have you heard of any firm positioning decision where these bay platforms are likely to be situated, as the "office staff" at the first National Rail "Ordsall Chord" exhibition at MOSI last Friday were unable to provide that answer.
--- old post above --- --- new post below ---
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
I was looking today at where you could possibly make room for two extra bay platforms and I think there could be room potentially if you moved the metrolink ever so slightly to the right (facing towards Bury/Rochdale).....Two bay platforms isn't enough IMO with the increased services and those sorry of an excuse for neanderthal gate staff need to learn how to read tickets.
You are referring to the existing east-facing bay platforms 1 and 2 here. I think you need to look at the new plans for Manchester Victoria station that National Rail have in mind, such as the new overall roof (at long last) and the use of the old fish dock where plans are under consideration for the redevelopment of the land used as a car park that runs from the side of the current Metrolink stop.
It is not just the case of relocating the existing Metrolink stop to allow the construction of any further east-facing heavy rail bay platforms and I am not aware of any such plans, as the Ordsall Chord will allow through running for trains arriving from the east side of Manchester Victoria station.
The Metrolink system is said to be trebling in size over the next five years and TfGM have plans to redevelop the existing Manchester Victoria Metrolink stop in order to provide increased platform and operational capacity. Two new Metrolink platforms are proposed in these plans, with additional track to cater for both through and terminal services. Remember the new Second City Crossing will be feeding into Manchester Victoria station. The new development on the Corporation Street side of the station will be two new office buildings that will provide 500,000 sq ft of office space.