The last train to Dobcross presumably continued to Delph. That was another place where the station was separated from the village by a steep hill.

The part of the poem/song that I referred to before which mentioned Dobcross was......

"And at Measurements Halt, the track has been lifted
The platform is all overgrown
There's willow and scrub where the Delph Donkey ran
And the valley has claimed back its own


In the Saddleworth hills on a crisp autumn day
A plume of smoke still lingers on
But I'm dreaming out loud, sure it's only a cloud
And the last train to Dobcross has gone"


 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,626
Location
Nottingham
"the night was dark and stormy,the rain fell down in lumps
Tram were on its journey from 'Ollinwood to Mumps
A dog ran in the tram tracks, driver rang 'is bell
Dog didn't hear his signal so he's on his way to Hellifax
So we're off, we're off,we're off in a motor car
Fifty bobbies are after us and we don't know where we are"

(from memory of 45 years ago)
Better not mention the lollipop on a family forum...
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
(Also posted in the TP CP6 thread)

Here's the press release on that:

https://www.networkrail.co.uk/feeds...hanges-to-services-through-ashton-under-lyne/

Ashton-under-Lyne station will close for 16 days while work takes place to provide passengers with better journeys between Manchester Victoria and Stalybridge.

As part of the Great North Rail Project, Team Orange will be working round-the-clock to remove a signal box, resignal sections of the railway and remodel the track from Saturday 14 April to Sunday 29 April 2018.

The upgrade will increase the linespeed in the area, helping to provide faster journeys, and renew the signalling system, which will make journeys more reliable.

During the work, Northern services will be replaced by buses between Manchester Victoria and Stalybridge. TransPennine Express trains will not run between Manchester Victoria and Liverpool Lime Street, only Manchester Piccadilly. Trains will continue to run from Stalybridge to Manchester Piccadilly station.

Nick Brown, project manager for Network Rail, said: “As part of the Great North Rail Project, this work will help us move towards a more modern railway. Not only are we aiming to improve the line speed but the signalling system at Ashton Moss will be changed so it can be controlled from our state-of-the-art rail operating centre in Manchester.”

Liam Sumpter, regional director for Northern, said: “We’re very sorry for any disruption this vital engineering work will cause for our customers. We are working closely with our partners in the rail industry to help keep people on the move and we will have a robust rail replacement system in place to get our customers where they need to be.”

Customer experience director for TransPennine Express Kathryn O’Brien said: “This essential work will deliver notable enhancements for rail customers across the North.

“There will be changes to our services between Liverpool, Manchester and Leeds, York and the North East over the 16 days and customers are encouraged to check and plan their journeys in advance.”

Preparation work will take place in the area over the coming weeks which will not affect services.

We will also be holding community drop-in sessions on Wednesday 14 March and Monday 16 April 2018 at Ashton Cricket Club, Reyner Lane, Richmond Street, Ashton-under-Lyne, OL7 0AU. Members of the project team will be on hand to answer any questions residents may have in relation to this work.

Passengers are advised to check before they travel at www.nationalrail.co.uk.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
Traversing the route today, there's a lot of physical work going on on both sides of the line to Stalybridge.
Much of it seems to be building new cable routes (for the OHLE "extension lead"?) which look really complicated where they avoid obstacles.
Plus things like new drainage.
I didn't see any obvious preparation for new signals to replace the semaphores at Ashton Moss.
Approaching Victoria there are 6 initial gantries, mostly dressed, then a sizeable gap before the ones immediately east of Victoria station.
It looks like that stretch will need large "gravity pads" for form the mast bases, so wiring is definitely not imminent.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Further lowered, as in they temporarily lowered it and now they are lowering it even further to achieve the necessary bridge clearance?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Further lowered, as in they temporarily lowered it and now they are lowering it even further to achieve the necessary bridge clearance?
I thought it was that they previously lowered the right-hand tracks as seen from the station, and are now lowering the left-hand tracks. Someone in the know has explained it somewhere since the turn of the year.

Edit: the platform 5 and 6 lines according to twpsaesneg here:

https://www.railforums.co.uk/thread...e-electrification.148433/page-10#post-3303893
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,824
Location
Liverpool, UK

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
Had a look round Victoria yesterday.
There are masts alongside the Platform 1 bay line, it's evidently in the process of being wired.
No masts are visible for the adjacent P2 line, but on closer inspection there are 3 big yellow plates on the floor next to the railings on the main concourse.
I expect these are for the P2 masts.
East of the station there are 2 full portals with a complete set of danglies, then another 5 portals much further east.
There's still a lot to do in the stretch between the two sets of completed portals, with the odd gravity pad under construction.

Killing time at Victoria, I noticed this interesting advertising display.
How do the installation guys not notice it is displaying upside down?
Or is it the latest marketing wheeze to get people looking at the advert?
It certainly got my attention.
man vic 20180413.jpg
 
Last edited:

jyte

Member
Joined
27 Oct 2016
Messages
671
Location
in me shed
Had a look round Victoria yesterday.
There are masts alongside the Platform 1 bay line, it's evidently in the process of being wired.
No masts are visible for the adjacent P2 line, but on closer inspection there are 3 big yellow plates on the floor next to the railings on the main concourse.
I expect these are for the P2 masts.
East of the station there are 2 full portals with a complete set of danglies, then another 5 portals much further east.
There's still a lot to do in the stretch between the two sets of completed portals, with the odd .

Killing time at Victoria, I noticed this interesting advertising display.
How do the installation guys not notice it is displaying upside down?
Or is it the latest marketing wheeze to get people looking at the advert?
It certainly got my attention.
View attachment 45320
Re you're imagine - orientation issues are all far too common. The display might have had to have been put upside down for various reasons and someone forget to set a software rotation in the controller.

I've watched the start of quite a few movies upside down in a cinema...
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Please to see the posts from the Woodhead line 1500 DC electrification are still up behind the signal box. Might they be pressed into use for 25,000 AC at some point?!

Only if someone was prepared to spend the time and money inspecting and assessing each one to verify that their height, strength and condition is adequate, and then come up with a unique set of fittings to attach modern SPS to old and relatively small steel sections. In summary - unlikely to be cost-effective, IMHO.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,253
Only if someone was prepared to spend the time and money inspecting and assessing each one to verify that their height, strength and condition is adequate. In summary - unlikely to be cost-effective, IMHO.
OK, that's a morning's work for a competent engineer.

Anything else we can think of to squander the electrification funds and come in 4 times over budget? Don't dismiss this - it's exactly what the GW electrifcation delivered.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
Aren't they all off-line to the main TP route though?
They were positioned on the branch/sidings/exchange lines from the old GC route onto the L&Y.
While the steelwork is ugly and should have been removed decades ago, I doubt if any of it is helpfully positioned to make any contribution to the modern TP route.
Having said that, there is modern 25kV OHLE fixed to similar LNER steelwork out of Liverpool St (and on bits of the MSJ&A still in NR control, and the remaining Woodhead route between Ardwick and Hadfield).
I think there are more disused masts in the undergrowth around Guide Bridge too, but again remote from the current Stalybridge running lines.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,824
Location
Liverpool, UK
Please to see the posts from the Woodhead line 1500 DC electrification are still up behind the signal box. Might they be pressed into use for 25,000 AC at some point?!
The only time that I saw an electric locomotive at Ashton Moss was 8th June 1962 when i was on my way to York. The locos were E26016 and E26031.
 

billh

Member
Joined
7 Jan 2015
Messages
320
The only time that I saw an electric locomotive at Ashton Moss was 8th June 1962 when i was on my way to York. The locos were E26016 and E26031.
I got a cab ride on an EM1 from Guide Bridge to Ashton Moss South and return. Aged about nine. Collected a rake of wagons by the 'box . The sidings and route to GB were de-wired in 1972, so less than 20years use and 45 years of disuse for the remaining gantries. Some of those structures behind the North box are special tubular experimental types , not found elsewhere on the Woodhead route.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,665
OK, that's a morning's work for a competent engineer.

Anything else we can think of to squander the electrification funds and come in 4 times over budget? Don't dismiss this - it's exactly what the GW electrifcation delivered.

No it isn't.... Developing new fixings from scratch is not half a days job.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,856
Location
Beeston (Notts)
No it isn't.... Developing new fixings from scratch is not half a days job.
Couldn't agree more. To quote a certain Mr. Dylan: "Don't criticise what you can't understand".
In this case, rather than pushing aside people who I'm sure do similar structural designs & analyses on a fairly regular basis, let them impart their own knowledge.
There's a ton of factors that need to be considered, and I'm sure @Joseph_Locke knows more about them than most of us on here.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Couldn't agree more. To quote a certain Mr. Dylan: "Don't criticise what you can't understand".
In this case, rather than pushing aside people who I'm sure do similar structural designs & analyses on a fairly regular basis, let them impart their own knowledge.
There's a ton of factors that need to be considered, and I'm sure @Joseph_Locke knows more about them than most of us on here.

Like that when a certain project was requested to assess 100 existing signal structures for screening cages for OLE, this involved ground investigation and drilling holes in steelwork (because there were no records and the structures were 30 years old), structural assessments for each one, about a dozen different fixing details to get the (new, compliant) ladders and screening cages to stay on ... and the first 20 all failed so the 100 were replaced (the cost of the assessment work was the same as a new signal, as it turned out).

OLE conductor tensions are now very high and the radial loads produced can be significant meaning that older portal structrues suffering section loss, founded on 1940s bases, are unlikely to be able to bear the new equipment.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
Like that when a certain project was requested to assess 100 existing signal structures for screening cages for OLE, this involved ground investigation and drilling holes in steelwork (because there were no records and the structures were 30 years old), structural assessments for each one, about a dozen different fixing details to get the (new, compliant) ladders and screening cages to stay on ... and the first 20 all failed so the 100 were replaced (the cost of the assessment work was the same as a new signal, as it turned out).

OLE conductor tensions are now very high and the radial loads produced can be significant meaning that older portal structrues suffering section loss, founded on 1940s bases, are unlikely to be able to bear the new equipment.

This is absolutely correct yes. I do not want to get too far OT but a trip to Fylde Junction is well worth it IMHO. Although I am a materials scientist/Corrosion engineer I naively thought - oh this is easy - just continue wiring from Fylde to Salwick - no problem. Not as easy as that - loads of new kit gone in with substantial overlaps etc. Some old kit has got reused but they were headspans with huge mast and thus pretty substantial - but even they had to be inspected etc. So there are pulleys with weights and the autotensioners both used. I will post the link to the photos when I get chance. LDECRexile has put them up and he also used many of mine.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
How it is not easy just to use old bases and structures. I hope they illustrate what I am trying to say + Mr Locke I assume?

Because if the old bases and structures cannot be guaranteed to be strong enough to take the design loads (which are higher than earlier installations) then you aren't going to use them! Note how in the 2 9064 pictures that you've linked to, both of the reused masts, which for what it's worth don't seem like they'd see particularly high loads compared to those with tensioning or anchoring equipment, appear to have had new stays(?) added to them requiring bases themselves. If you are going to the trouble of putting in a new base for the stay, unless you are 99.99% confident that the existing mast is good enough then you may as well pay out a little more and get a new one.
 