Bletchleyite
Veteran Member
But what about widening the junction approach to 4 tracks?
You couldn't do that by double stacking it.
But what about widening the junction approach to 4 tracks?
Grayling is only stopping it because it would take money away from London. Plus something tells me that he wants the Ordshall Chord to be a white elephant. I wonder why...The official scheme would provide a good deal of extra capacity despite remaining two tracks at the narrowest points. It just needs Grayling to stop blocking it. Westbound trains would alternate between the two westbound through platforms at Piccadilly, similarly at Oxford Road, similarly eastbound.
Key word: WideningYou couldn't do that by double stacking it.
I can't see how two tiers would work, it is going to take you almost the length from Piccadilly to Deansgate to get the 'elevated' tracks to the required height and a similar length to get them down again. AND don't forget they will have to be 4-tracks wide whilst they are getting up to and down from full height.The only way of solving this is widening or double tiering. Some people are against widening, others are are against 2 tiers and the rest are against both ideas. This needs to happen and something's going to have to give and 1 group of people are going to be left unhappy. Everyone will just have to except that the outcome may not be the one they wanted.
That's why I originally said widen it.I can't see how two tiers would work, it is going to take you almost the length from Piccadilly to Deansgate to get the 'elevated' tracks to the required height and a similar length to get them down again. AND don't forget they will have to be 4-tracks wide whilst they are getting up to and down from full height.
Yes, it will. Manchester isn't going to end up like some European cities with skyscrapers for every meal, as it were, it simply isn't a UK thing. Birmingham is probably about as high rise as the UK will ever get.
But what about widening the junction approach to 4 tracks?
That's not to increase T'sPH. It's for ease of access. Like my plan to widen the whole thing. Ease of access/planning.It wouldn't make a huge difference because it would just shift the bottlekneck elsewhere. Currently clearing Castlefield Junction signals takes 3 minutes limiting the theoretical maximum capacity of the whole corridor to 20tph. In reality it is lower to allow some room for error. Increasing the linespeeds of both lines to reduce the path to 2 minutes would push the bottleneck elsewhere. 4 platforms at Oxford Road and 4 through platforms at Piccadilly (with very limited length of 4 tracking into Piccadilly) combined with rebuilding Castlefield Junction to increase line speed plus closing Deansgate would provide all the capacity realistically needed. The suggestions of huge amounts of infrastructure are never going to happen and even if the government was prepared to spend the money then the
City council and Combined Authority would oppose demolishing a swathe of central Manchester. Does anyone think that capacity for more than 15tph + freight is actually neccessary?
Indeed.It's a shame we never build a massive third station, a west facing terminal around the Midland Hotel / GMEX area.
Oh... err hang on....![]()
It's a shame we never build a massive third station, a west facing terminal around the Midland Hotel / GMEX area.
Oh... err hang on....![]()
Yes, but the boundary has moved!Well played. Now if only you could be able to get from Cheshire to Manchester in 11 minutes...
Building HS2 would be cheaperImagine persuading someone to the left of politics, perhaps should he (or, she) get into power, to take back by comp purchasing & nationalising both Manchester Central and Manchester Arena & it's car park for the (obscure, obviously) purpose of being fit for purpose, major railway stations. The question of compensating the two venues would probably involve offering them (currently an arena & a conference centre) new venues at different locations. Far fetched, but who knows where we'll be in 10 years.
Think that's more to do with the way Railway infrastructure is built in Europe verses how we do things here.
But digging down to extend a station (and I agree Antwerpen Centraal is a very nice job, as is Berlin Hbf) is rather different from what would be a horrid blight on central Manchester by stacking another double track viaduct onto the existing one.
Imagine persuading someone to the left of politics, perhaps should he (or, she) get into power, to take back by comp purchasing & nationalising both Manchester Central and Manchester Arena & it's car park for the (obscure, obviously) purpose of being fit for purpose, major railway stations. The question of compensating the two venues would probably involve offering them (currently an arena & a conference centre) new venues at different locations. Far fetched, but who knows where we'll be in 10 years.
Not sure, but it would help. There are 5 stoppers in each direction most hours.Is closing Deansgate station actually required?
Sacrificing the interchange with Metrolink is something of a significant downside.
And portion working would likely require substantial additional platform capacity at already heavily rationalised outlying stations and is thus rather problematic.
Pity HS2 can't feed trains onto that side of the Piccadilly throat.
I see the logic in re-opening Central Station (even if it means demolishing Deansgate-Castlefield tram stop) but what's the logic in buying the arena?Imagine persuading someone to the left of politics, perhaps should he (or, she) get into power, to take back by comp purchasing & nationalising both Manchester Central and Manchester Arena & it's car park for the (obscure, obviously) purpose of being fit for purpose, major railway stations. The question of compensating the two venues would probably involve offering them (currently an arena & a conference centre) new venues at different locations. Far fetched, but who knows where we'll be in 10 years.
Is closing Deansgate station actually required?
Sacrificing the interchange with Metrolink is something of a significant downside.
And portion working would likely require substantial additional platform capacity at already heavily rationalised outlying stations and is thus rather problematic.
Pity HS2 can't feed trains onto that side of the Piccadilly throat.
Not sure, but it would help. There are 5 stoppers in each direction most hours.
You could build a station adjacent to Cornbrook Tram stop that would capture all the Liverpool stoppers but the Preston/Southport ones are still missing out.
I see the logic in re-opening Central Station (even if it means demolishing Deansgate-Castlefield tram stop) but what's the logic in buying the arena?
*COUGH* Piccadilly or Oxford Road *COUGH*You could build a station adjacent to Cornbrook Tram stop that would capture all the Liverpool stoppers but the Preston/Southport ones are still missing out.
I Know!!*COUGH* Piccadilly or Oxford Road *COUGH*
Virgin aren't much use if you're going to NottinghamIn my opinion, the current through platforms at Manchester
Piccadilly always seem to be really busy! Fortunately I normally use the terminal platforms as my family like the Virgin brand, (although GWR and HT are the best in my op)