• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Manchester Piccadilly - Euston reduction?

Status
Not open for further replies.

CHESHIRECAT

Member
Joined
27 Jul 2010
Messages
294
Down to 2 ph from tomorrow ?
Xx55 SB and xx 13 NB cancelled
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,322
Down to 2 ph from tomorrow ?
Xx55 SB and xx 13 NB cancelled

Comment on local community group mentions platform closures at Piccadilly for roof works but they've been ongoing for few months now ?
That’s what’s showing on RTT so must be correct.

All Avanti at Piccadilly showing as Variations.

Looks to be up to and including wc 23rd September.
 

greatkingrat

Established Member
Joined
20 Jan 2011
Messages
3,291
Avanti website says

Engineering work is taking place to the roof at Manchester Piccadilly station, closing Platforms 5, 6 and 7.
Whilst these platforms are blocked, Avanti West Coast will only be able to operate in and out of Platform 8.
As a result, the services to and from Manchester Piccadilly are reduced to two trains per hour:
 

CHESHIRECAT

Member
Joined
27 Jul 2010
Messages
294
Ah ok up to now only 2 platforms closed at a time... random how the one via Crewe only cancelled Southbound
Tks all!
 

Thomas6187

Member
Joined
27 May 2011
Messages
444
Location
Rochdale
Platform 7 will only be available to diesel traction, with the Bournemouth using it every hour. Avanti have minimal room for error, with the platform being used for 47 in every hour
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
All of platform 9 as well, though this would take out 10, 11 and 12 so would be super disruptive - but contingency would allow it.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,091
Location
Wilmslow
Down to 2 ph from tomorrow ?
Xx55 SB and xx 13 NB cancelled

Comment on local community group mentions platform closures at Piccadilly for roof works but they've been ongoing for few months now ?
Thank you for the heads-up; I tend to go for the xx.55 Piccadilly-Wilmslow so now I know not to bother.

It’s bad that there’s such short notice of this change, but it’s increasingly expected. The Piccadilly platform closures have been going on for months so something must have gone wrong with the last closures.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,322
Thank you for the heads-up; I tend to go for the xx.55 Piccadilly-Wilmslow so now I know not to bother.

It’s bad that there’s such short notice of this change, but it’s increasingly expected. The Piccadilly platform closures have been going on for months so something must have gone wrong with the last closures.
Surely this has been planned for several weeks?
Timetables available online?
Posters stations?
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,091
Location
Wilmslow
Surely this has been planned for several weeks?
Timetables available online?
Posters stations?
You’re having a laugh! See earlier discussion at https://www.railforums.co.uk/threads/manchester-piccadilly-platform-12.261069/page-2#post-6894218

The plan was
  • STAGE 3: Platforms 1 and 2 closed – 27 July- 17 August (3 weeks)
  • STAGE 4: Platforms 3 and 4 closed – 17 August to 7 September (3 weeks)
  • STAGE 5: Platforms 5 and 6 closed – 7 September 28 September (3 weeks)
  • STAGE 6: Platforms 7 and 8 closed – 28 September to 20 October (3 weeks)
but that’s obviously changed.

The other thread does acknowledge some posters at stations, but the online timetables from Northern show services which have been cancelled for months. There is also information on the Northern Web site if you come across it. For the original plan, that is. I suspect most passengers only found out by trying to use a cancelled train, though - almost all the Alderley Edge terminators are cancelled plus Marple rush-hour services.
 
Last edited:

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,377
Location
Calder Valley
All of platform 9 as well, though this would take out 10, 11 and 12 so would be super disruptive - but contingency would allow it.
Which did indeed happen yesterday with the disruption on the WCML.

 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
Which did indeed happen yesterday with the disruption on the WCML.
Yesterday was interesting at Piccadilly. After the 1615 they were down to one an hour.

I missed the 1615 by a few minutes and was stuck until 1815. It was completely declassified, people were sat in the aisles, on the tables and in the toilets That train was so full they were turning people away. it was like something out of Dr Zhivago!

The train made an additional stop at Nuneaton where loads tried to get on but were left behind. Obviously a 9 car train.............
 

Thomas6187

Member
Joined
27 May 2011
Messages
444
Location
Rochdale
The alterations for each set of platforms are only appearing about 2 weeks before the closure. Platform 7 and 8 will be out of action from Sunday 29th September for three weeks, but currently no alterations have been put in
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,091
Location
Wilmslow
Last edited:

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,377
Location
Calder Valley
Nope, signalling doesn't allow it.
This is getting off topic now, but I remember there was a series of drags that happened in the early 2000s with Class 47s to VTIC/XC (cannot remember which) at Stockport any ideas how that one worked?

== Doublepost prevention - post automatically merged: ==

You also have a couple of examples of Avanti services starting at Stockport, both ad-hoc and planned. One came off Longsight yesterday and started at Stockport due to issues and one planned this morning.

 

plugwash

Established Member
Joined
29 May 2015
Messages
1,990

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
This is getting off topic now, but I remember there was a series of drags that happened in the early 2000s with Class 47s to VTIC/XC (cannot remember which) at Stockport any ideas how that one worked?

== Doublepost prevention - post automatically merged: ==

You also have a couple of examples of Avanti services starting at Stockport, both ad-hoc and planned. One came off Longsight yesterday and started at Stockport due to issues and one planned this morning.

If Avanti did a better job of announcing these services and ran them, and if the tannoy at Piccadilly would announce these services, you'd have many people taking a local service to Stockport and changing there. Instead poor communication and a lack of commitment to these services is leading to terrible overcrowding on a service two hours after the last.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,990
you'd have many people taking a local service to Stockport and changing there.
And potentially causing terrible overcrowding on said local services.

I suspect this is another reason for not wanting to terminate trains at Stockport. An 11 car dumping out and the passengers trying to get onto a 2 car train would not be pretty.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,091
Location
Wilmslow
AIUI while a turnback from the south in the station itself is not possible (turnback from the north *is* possible in either platform 1 or platform 3A), it's possible to drop the passengers in 3 or 4, run north onto the viaduct, reverse and renter the station on 1 or 2 to pick up new passengers.

On https://www.opentraintimes.com/maps/signalling/macclesfield#T_STKP I think this means reversing between signals 44 and 117
See https://www.railforums.co.uk/threads/stockport-sig-st2-116-118.271979/#post-6884941 for more information on this shunt move.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,667
This is getting off topic now, but I remember there was a series of drags that happened in the early 2000s with Class 47s to VTIC/XC (cannot remember which) at Stockport any ideas how that one worked?

== Doublepost prevention - post automatically merged: ==

You also have a couple of examples of Avanti services starting at Stockport, both ad-hoc and planned. One came off Longsight yesterday and started at Stockport due to issues and one planned this morning.

That is coming from Longsight, you couldn't do that move from Edgeley.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
And potentially causing terrible overcrowding on said local services.

I suspect this is another reason for not wanting to terminate trains at Stockport. An 11 car dumping out and the passengers trying to get onto a 2 car train would not be pretty.
In the South East these things are easier as local services are 5/10 car or 8/12 car commuter trains but for Manchester, Northern are stretched for units and can't run everything as 3 or 4 car like they should be doing and TfW are still running 2 car services to Manchester which should all be 3 and 4. Avanti could still run rail replacement buses though I suspect many would still gun for the local services and not be able to board a TfW that came the way from Cardiff.

Still there are still enough Stockport - Manchester services per hour I think the crowds could be evenly distributed if two services run within close timing of each other.
 
Status
Not open for further replies.

Top