Thanks for the info guys. It seems a shame that the timetable is not going to realise the true potential of the electrics, after all one of the raisons d'etre for electrification is to decrease time between towns and citys.I know there are other benefits - less track wear, ease of maintenance and less pollution (sounds a bit like - What have the electrics ever done for us?) but surely reducing journey times would be the most important reason for the money spent.
Even the station staff have no idea what the work is all about when I was at the station tonight!Bit of activity this morning at Roby station with the orange army working on the platform for the fourth track.
According to a reliable source from Network Rail the 'new platforms' at Roby and Huyton have failed clearance for 319's by 15mmand are having to be rebuilt to spec, hence the building work.
I assume they were designed prior to NR knowing Northern would be getting 319's!
No they knew they getting them as far as I am aware. So on that basis, would that apply to the other three operational platforms at both stations too? If not, so why platform four different at both stations - this could suggest the track was laid in the in-correct place rather than platform edging? A strange one indeed!!According to a reliable source from Network Rail the 'new platforms' at Roby and Huyton have failed clearance for 319's by 15mmand are having to be rebuilt to spec, hence the building work.
I assume they were designed prior to NR knowing Northern would be getting 319's!
Still better than the Class 142's, Class 150's and dare I say the Class 156's too. The latter I do like but only when I'm able to get a table seat, although they are a good ride.A little of track so to speak, but maybe of interest, was travelling into Lime Street on Wednesday evening on LM from Acton Bridge, we paused in the tunnel , and a Northern Railways Electric train pulled up along side to us and also stopped. My friend who I was with at the time, who has no interest in rail, looked at the Northern train, and said, "god that looks old !" I then said they have only been in the NW quite recently, but they were indeed second hand.
A little of track so to speak, but maybe of interest, was travelling into Lime Street on Wednesday evening on LM from Acton Bridge.
Really nothing change when I looked when travelling in and out of Liverpool yesterday. Clearly waiting for the blockade beginning of next month. What I did notice, there seem to be an access of track panels and crossover slips just to insert line four (up slow). At Roby Junction, there was 5 crossover slips which seem excessive for that location. I know some of the other lines will need realigning but still more than required though. May be some of the existing rails are already subject to excessive wear and tear may be?The orange army was busy rebuilding P4 at both Huyton and Roby today (Roby more advanced).
To my eye, the new edge is lower than before, so presumably they will have to re-tarmac as well.
What a fiasco.
The 4th track has been extended east of Huyton station, up to a point near the bus station where an electrification mast is in the way.
A new signal base is in at Roby Jn.
Really nothing change when I looked when travelling in and out of Liverpool yesterday. Clearly waiting for the blockade beginning of next month. What I did notice, there seem to be an access of track panels and crossover slips just to insert line four (up slow). At Roby Junction, there was 5 crossover slips which seem excessive for that location. I know some of the other lines will need realigning but still more than required though. May be some of the existing rails are already subject to excessive wear and tear may be?
Yes and of course I am aware of the change's at Huyton Junction too. However there are 4 sets right next to Huyton Station too, see:- https://www.flickr.com/photos/127646831@N03/36302426281/in/album-72157683639340646/ ."crossover slips"? do you mean half sets of switches? And were they all the same length, as there are changes at Huyton Junction too ...
Yes and of course I am aware of the change's at Huyton Junction too. However there are 4 sets right next to Huyton Station too, see:- https://www.flickr.com/photos/127646831@N03/36302426281/in/album-72157683639340646/ .