Manchester - Liverpool Electrification

Status
Not open for further replies.

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Yes, typing error! Sorry but I'm sure you do the odd now one and then? :lol:

You had me looking for a LM Class 350 service between Crewe and Liverpool running via Warrington Bank Quay :P

I thought there must be some workings I had missed. LM must surely find this route useful should Runcorn be blocked - but I bet they won't learn the road.
--- old post above --- --- new post below ---
To me the best idea would still be for the 350s to transfer to London Midland when growth on that franchise requires it, as they are practically identical to the units already in use there. Northern would have the 120 new vehicles (DMUs or bi-modes) plus whatever else the successful bidder comes up with. Transpennine needs a new fleet which could be specified to be in 3-car or 4-car format for different routes according to demand and available platform length. If Transpennine doesn't get a new fleet then I'm in danger of joining the chorus of complaints about southern cast-offs...

Agree totally 350/4s to LM. I reckon either Hitachi trains or mini Pendolinos for Manchester to Scotland.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

railhead56

Member
Joined
6 Dec 2014
Messages
18
I agree re 350/4 to LM but how about retractioned 317s for Manchester to Scotland. So much more affordable.
I'll get my coat....
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
You had me looking for a LM Class 350 service between Crewe and Liverpool running via Warrington Bank Quay :P

I thought there must be some workings I had missed. LM must surely find this route useful should Runcorn be blocked - but I bet they won't learn the road.
--- old post above --- --- new post below ---


Agree totally 350/4s to LM. I reckon either Hitachi trains or mini Pendolinos for Manchester to Scotland.

Why mini Pendos? Transpennine is struggling right now with six and eight car formations. In five years full size Pendos could easily be needed.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Why mini Pendos? Transpennine is struggling right now with six and eight car formations. In five years full size Pendos could easily be needed.

Depends if they can fit at Manchester Airport, Glasgow Central and Edinburgh. The latter two have only a few long platforms usually fully occupied by other services and does Manchester Airport have anything beyond 8 carriages?
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
Depends if they can fit at Manchester Airport, Glasgow Central and Edinburgh. The latter two have only a few long platforms usually fully occupied by other services and does Manchester Airport have anything beyond 8 carriages?

By mini Pendo I presumed you meant the six car version we saw mentioned in the failed 2012 WCML bids. As these can only obviously not be doubled up they need to be as long as possible to begin with. Therefore eight car 390s would seem to be the compromise.

Also Edinburgh Waverley's motorail platforms and two bay platforms at the other end of the station are being merged to form two new long through platforms.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,327
It's a good idea and many on Merseyside want this service resurrected.

If Manchester can have a direct service to Sccotland, why can't Liverpool?

Yes - but as I wrote - there are no spare trains curently available for such a service. Unless you think a Class 319 would be suitable ?
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,828
Location
Liverpool, UK
It's a good idea and many on Merseyside want this service resurrected.

If Manchester can have a direct service to Sccotland, why can't Liverpool?

Manchester Airport attracts a lot of business from North West England and so the MIA-EDB/GLC/WDM/BIF services cater for this requirement.
I do not think that you will see Liverpool to Scotland services until Pennine electrification is completed and TPE EMU stock is working into Liverpool.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
I agree re 350/4 to LM but how about retractioned 317s for Manchester to Scotland. So much more affordable.
I'll get my coat....

You'll need the coat to cope with the draughts unless they're also fitted with aircon.

I think the 317, 319 and similar are OK for the short journeys most people use them for, such as Northern Liverpool-Manchester where most people are only making part of the journey because other operators provide faster through trains.

However they aren't the right train for longer interurban journeys. These have a significant business clientele so they really need a good number of seats with tables and power sockets, and aircon so conversation is possible without the noise from open windows. Also with only one motored coach out of four they may struggle with the gradients on Transpennine routes including Shap and Beattock on the way to Scotland, particularly in the frequent event of poor rail conditions.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,196
Actually it was later than you think - mid 1990's (1994) and by then in the hands of I/C Class 47's although occasional Class 31 or 37 hauled the Liverpool - Preston or vice versa legs. See: https://www.flickr.com/photos/8a-collection/14075112690/

The following year for a temporary period, the service went over to Class 158's then stopped altogether.

Interesting that goes via St Helens. The 18:10 Edinburgh to Liverpool used to go via Newton Le W.
--- old post above --- --- new post below ---
Indeed, it would be much easier to do this than it is to split and join the sleeper, which happens six nights a week.

But Carlisle is a very simple join. Trains arrive, hook up, and on they go. Carstairs on the other hand involves the Edinburgh portion arriving in front of the Glasgow portion and then reversing back out. It all takes up more time purely to serve a lightly used station. Is it worthwhile? Perhaps it's cheaper than running two trains in close proximity up and down the WCML (perhaps one of the two could stop at Lockerbie), but it would lead to a perception of slowing down the service which could make rail less competitive, particularly from Edinburgh.

(And yes I'm perfectly aware that the Carstairs split/join was the norm in days gone by, but that's no longer the case so it could also be seen as a retrograde step).

I am not sure, given the use of multiple units, why joining at Carlisle is easier than at Carstairs. There may be a journey time issue and Carstairs may not be seen as a significant market for passengers.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
I am not sure, given the use of multiple units, why joining at Carlisle is easier than at Carstairs. There may be a journey time issue and Carstairs may not be seen as a significant market for passengers.

Good point. I think the faffing around at Carstairs is to avoid ending up with a loco trapped in the middle of the train. If the necessary subsidiary routes are provided (which are probably needed for LHCS as well), then MUs ought to be able to arrive from opposite directions, not simultaneously but a few minutes apart, and just couple together.
 

SpringsBranch

New Member
Joined
2 Jun 2014
Messages
4
Actually it was later than you think - mid 1990's (1994) and by then in the hands of I/C Class 47's although occasional Class 31 or 37 hauled the Liverpool - Preston or vice versa legs. See: https://www.flickr.com/photos/8a-collection/14075112690/

The following year for a temporary period, the service went over to Class 158's then stopped altogether.

An on very rare occasions, a short formed HST with (if I remember rightly) just 3 carriages!
 

railhead56

Member
Joined
6 Dec 2014
Messages
18
You'll need the coat to cope with the draughts unless they're also fitted with aircon.

I think the 317, 319 and similar are OK for the short journeys most people use them for, such as Northern Liverpool-Manchester where most people are only making part of the journey because other operators provide faster through trains.

However they aren't the right train for longer interurban journeys. These have a significant business clientele so they really need a good number of seats with tables and power sockets, and aircon so conversation is possible without the noise from open windows. Also with only one motored coach out of four they may struggle with the gradients on Transpennine routes including Shap and Beattock on the way to Scotland, particularly in the frequent event of poor rail conditions.

Most of that can be sorted by Angel if they refurb. I take your point about Shap but havent the similar (retractioned) 325s worked from Warrington to Glasgow doing the mail? New build is clearly better but someone has to sign the cheque.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
Most of that can be sorted by Angel if they refurb. I take your point about Shap but havent the similar (retractioned) 325s worked from Warrington to Glasgow doing the mail? New build is clearly better but someone has to sign the cheque.

When were the 325s retractioned? Wikipedia makes no mention of that saying that they were/are fitted with the same kit as the 319s.
--- old post above --- --- new post below ---
New build is clearly better but someone has to sign the cheque.

Exactly. A refurb./medium upgrade such as replacement seating, improved luggage stowage and at least a pressure ventilation system will allow the residual value of the stock to be realised on mainline services. The probelm with a/c is that the hotel demands may involve major replacement of the transformer and other electrical systems.
Fitting low-power 230v ac outlets and wi-fi to make them suitable for that sort of service for the rest of their operational life is trivial.
 

railhead56

Member
Joined
6 Dec 2014
Messages
18
AM9 is right to correct my error on 325 retractioning. Sorry. I agree with his other comments too.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
Most of that can be sorted by Angel if they refurb. I take your point about Shap but havent the similar (retractioned) 325s worked from Warrington to Glasgow doing the mail? New build is clearly better but someone has to sign the cheque.

Yes a high standard refurb including aircon might make these acceptable for TPE journeys, at least the shorter ones such as Blackpool (which I think ends up with Northern anyway).

325s mainly run overnight and mail isn't as critical as passengers, so delays due to poor adhesion are slightly less of a problem.
 
Last edited:

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
Yes a high standard refurb including aircon might make these acceptable for TPE journeys, at least the shorter ones such as Blackpool (which I think ends up with Northern anyway).

325s mainly run overnight and mail isn't as critical as passengers, so delays due to poor adhesion are slightly less of a problem.

But they have an equal propensity to delay following trains when they themselves are delayed by poor adhesion.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,327
An on very rare occasions, a short formed HST with (if I remember rightly) just 3 carriages!
Plus a year or so when they used Voyagers on the Edinburgh / Liverpool / Portsmouth diagrams.
--- old post above --- --- new post below ---
With electrification work now more or less "complete" on this route, does anyone know why there are no saturday services between Newton-Le-Willows and Manchester (Victoria or Piccadilly) from 31 October until at least the timetable change in December 2015 ? (The public TT does show an Arriva sevice to Manchester Piccadilly, but this does not appear in the on-line WTT ). Also no Northern sunday trains to Manchester from 13 September.

So, at great expense, we have a newly electrified line - but no weekend trains in the pre-Christmas period.
 

Loop & Link

Member
Joined
22 Feb 2015
Messages
515
There was a timing run between Lime St and Manchester Victoria stopping at all stations this evening - 5Z27/5Z28.
 

caliburn53

Member
Joined
3 Aug 2014
Messages
12
very nice to see 319's flashing through Earlestown with no indication when we will get a stopper if ever
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
very nice to see 319's flashing through Earlestown with no indication when we will get a stopper if ever

I doubt that Northern will want to run diesels under the wires any longer than necessary, especially when there is an ample supply of 319s available and they have more capacity as well as the potential for running a tighter timetable.
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
Plus a year or so when they used Voyagers on the Edinburgh / Liverpool / Portsmouth diagrams.
--- old post above --- --- new post below ---
With electrification work now more or less "complete" on this route, does anyone know why there are no saturday services between Newton-Le-Willows and Manchester (Victoria or Piccadilly) from 31 October until at least the timetable change in December 2015 ? (The public TT does show an Arriva sevice to Manchester Piccadilly, but this does not appear in the on-line WTT ). Also no Northern sunday trains to Manchester from 13 September.

So, at great expense, we have a newly electrified line - but no weekend trains in the pre-Christmas period.

Where did you hear this?

If this is true, I hope the police will be braced for an increase on drink driving during the run up to Christmas.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
Where did you hear this?

If this is true, I hope the police will be braced for an increase on drink driving during the run up to Christmas.

Maybe related to the ongoing quad tracking around Huyton? I did however think the deadline for that work was 2017, not the 2016 these blockades would make it.
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
Maybe related to the ongoing quad tracking around Huyton? I did however think the deadline for that work was 2017, not the 2016 these blockades would make it.

Yes but the quad tracking should not affect the Newton-Manchester section, I assume there is a turnback crossover at St Helen's Jct or Earlestown (using the west to south curve).

Is it anything to do with the start of work on the Ordsall chord? Since the authorisation of this was late maybe they are trying to make up time so as not to delay the other Northern Hub works.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Maybe related to the ongoing quad tracking around Huyton? I did however think the deadline for that work was 2017, not the 2016 these blockades would make it.

There's been previous discussion in this thread about NR's conflicting statements on the timescale for that. 2017 was mentioned in the stuff about the Transport & Works Act Order, but the CP5 Enhancements Delivery Plan says it's supposed to be complete by Feb 2016, which would obviously fit with works being done at the tail end of this year.

Are there any remaining line speed improvements on the Chat Moss line due to be made in the next year or two?
 