marko31161
Member
- Joined
- 31 Jul 2014
- Messages
- 16
The overnight runs Monday,Tuesday will be test train going first, 319 unit following.
Now for two naive questions:
1. can electric trains run under power if autotransformer (AT) wire is missing?
2. AT insulators generally stick out above or beside masts, including portals. Other wires are up. How does a wiring team physically get AT wires up with all that clobber, especially portals, in the way?
The overnight runs Monday,Tuesday will be test train going first, 319 unit following.
Not sure of the technical in's and out's of the OHL proving but it was testing of the OHL.
My understanding the overnight runs will be 319's.
1. Yes, I was under the impression that the Wigan branch wasn't using AT
2. The wire is be run by a simple method of 2 MEWPS pulling it out and passing it to each other over the portals and around the back of the masts. Sometimes they pull a rope winch cable through rollers hung off the insulators then attatch the wire and winch it back. One firm I know use a mix of the 2 systems above i.e 1 team pulling the winch and 1 pulling the cable, join where they meet then winch the rest. Alot also depends on the thickness of the wire, and how keen the H&S guy is on the night :roll: The stuff used up there can be done without the winch, but some on the WCML needs the winch.
This is the way its usually run anyway. A decent team can run, tension, splice and clip in around 2000m in a normal mid week night possession if all the insulators are in place.
Section Proving is the activity of opening and closing section switches and breakers in a laid down sequence to make the OLC live and seeing what goes bang, trips out or bursts into flames*. It's the last set of tests prior to the wires being energised for normal use.
* Rare, but not unknown. It can be quite hair-raising ...
Anything on RTT yet?
I posted yesterday there is a train tonight at 8pm ish from LIV
That appeared to be booked for a diesel loco and not a 319.
Characteristically clear, thank you. Has this happened successfully from Edge Hill to Earlestown yet?
<horsesmouth> No, but soon </horsesmouth>
This is due to happen this tonight. I know the horse!
I forgot to mention that the steps up to Huyton Station are now in use. There's a temporary light fixed to the handrail at the top of the steps, until the lamp post is installed.
That appeared to be booked for a diesel loco and not a 319.
With all parts of the L&M covered plus new loop at Huyton/Roby and west to south curve at Earlestown, this looks suspiciously like a registration test train before overheads are energised.
Pendolino or Class 92 later in the week followed by 319s from the 2nd March as forecast?
Looks like it's reached Warrington BQ
Been following it on RTT, has no one nipped out yet to get a photo
At Platform WBQ![]()
Is it a 31 or 47 hauling it?
Now in Liverpool, I believe
47 front 37 rear running early past Vulcan Village with pantograph up

Been following it on RTT, has no one nipped out yet to get a photo
At Platform WBQ![]()
One thing is certain that electric services must be truly close to happening now, with this testing now in place.
And I witnessed it at a bridge near St Helens Junction.![]()
Well, here's one for what it's worth ! Been at the Junction and I can assure you it IS the test train with its pant up going through P2 of St H Junct on its first (Lpl bound) pass 2 mins early. Had the video camera part of my phone set up for the second (Mcr bound) pass, but the thing froze just as it came down the incline fro Lea Green. Filled with anger, frustration and hypothermia in equal amounts I decided to call it a night....
Well, here's one for what it's worth ! Been at the Junction and I can assure you it IS the test train with its pant up going through P2 of St H Junct on its first (Lpl bound) pass 2 mins early. Had the video camera part of my phone set up for the second (Mcr bound) pass, but the thing froze just as it came down the incline fro Lea Green. Filled with anger, frustration and hypothermia in equal amounts I decided to call it a night....
Further schedules have just appeared in the database for tonight, two runs from Allerton via Lime Street (d. 23.45 and 00.45) to Newton-le-Willows and both booked for an emu!
http://www.realtimetrains.co.uk/train/O76146/2015/02/23/advanced
http://www.realtimetrains.co.uk/train/O76147/2015/02/23/advanced
and I'm stuck in work!
Update 23:20 both are parked in P1 at Lime Street