I've been out and about today, by car.
1. Yesterday's photos showed the single wire over the eastbound line from Roby Jct to Huyton Jct. It now has a wire underneath (ie Catenary and Contact Wire pair?) at least as far as the eye can see east of Roby.
2. Adverts at WTP and Roby (may well be elsewhere, too) saying electrics are coming. Nicely done I reckon.
3. No changes visible at Carr Mill or Sankey Viaducts.
4. I examined the wires over Penkford Lane bridge at Collins Green. All looked kosher to me, the removed wire reported yesterday must have been reinstated. (The dead horses have also been removed.)
5. St Helens Junction was good news, bad news for me.
5.1 Bad news is the scale of the preventive/remedial work under way towards the eastern end of the westbound platform. There seems to be something of a saga there. Plan A appeared to be a portal or pair of masts, one on each side of the tracks. Bases were duly constructed. Plan B then emerged, with the base on the northern side being abandoned (it is now tarmaced over) and a TTC being erected on the southern base. Plan C (which might have been part of Plan B) involved a crew putting significant reinforcement underground around the southern base (I stumbled across them doing this and photographed it.) Now Plan D involves further reinforcement. I hope to goodness it is preventative rather than remedial. The retaining wall doesn't show obvious signs of disturbance, but the affected area is largely obscured by the props which appear to be in place to support what will be a substantial concrete block. Please note this is all my lay observations, not something someone with a brain cell has told me.
5.2 Good news is that everything else looked ship-shape, notably the wires all seemed 'finished', the fencing seemed 'sorted' and the foliage seemed 'fettled'. Not very quantified and scientific, but a clear contrast to my last visit not long ago.
6. The three headspan mast pairs at Rainhill which were in process of being fixed now look as near as dammit done.
7. The lifts at Roby remain out of use, but, oddly, they appear to be 'working'. I was standing near the one on Platform 3 when the recorded voice said 'Platform'. I whizzed round to see the lift ascending to the platform, where it stopped, unoccupied, and sat there, doors closed, lights on. Is it undergoing some sort of 'mileage accumulation' or is it just a cockup? The buttons are covered over, so no-one can have triggered it by hand.
8. Quite a sprinkling of orange around all parts. Three senior looking Balfour Beatty Orangemen were touring St Helens Junction when I was there.
9. The fence being constructed yesterday west of Roby looks done and dusted.
Photos later.