Thats a lovely piece of work with the spreadsheet, are you going to have a colour for finished sections, ie complete apart from energising.
The Network rail Wiring train is currently parked on platform 4 at Victoria. Hoorah!
Its not doing anything but still![]()
Thats a lovely piece of work with the spreadsheet, are you going to have a colour for finished sections, ie complete apart from energising.
D Black, or am I missing something?
As I read it that was for existing wiring dating back many years.
I've had another look at Table 2 (below Table 1) which serves as a Key to the colours on Table 1. To be honest I'm struggling to understand where you're coming from. Having built it, perhaps I can't see it from strangers' eyes.
A (Purple) is lines which have been electrified for ages, eg Lime St-Edge Hill
B (Red) is stretches where old and new overlap, eg by Tuebrook Sidings
C (Yellow) is where there's a blitz taking place on piling & masts, ie Roby/Huyton
and
D (Black) is where a full set of wires have been put up recently (ie 2014), eg Wavertree Technology Park through Broad Green.
and so on....
The Network rail Wiring train is currently parked on platform 4 at Victoria. Hoorah!Its not doing anything but still![]()
Keep it up!
I've had another look at Table 2 (below Table 1) which serves as a Key to the colours on Table 1. To be honest I'm struggling to understand where you're coming from. Having built it, perhaps I can't see it from strangers' eyes.
A (Purple) is lines which have been electrified for ages, eg Lime St-Edge Hill
B (Red) is stretches where old and new overlap, eg by Tuebrook Sidings
C (Yellow) is where there's a blitz taking place on piling & masts, ie Roby/Huyton
and
D (Black) is where a full set of wires have been put up recently (ie 2014), eg Wavertree Technology Park through Broad Green.
and so on....
Sorry my bad misread the key. You are correct must read more carefully. I think I misunderstood the phrase "recent times"
I think that Ormskirk - Preston electrification comes under the category "dreamware". Unless thay plant a massive new town in the Rufford / Croston area, there simply is not enough population to justify the high cost of electrification north of Burscough.Yeah but factor in the work that would be involved in adapting Preston for a DC line.
The 3rd rail system has worked (almost) perfectly for over 100 years...why bother ripping it all up and installing ole? Besides, the underground loop and link tunnels don't have enough clearance for overhead wires.
Regardless of installation cost where 25kv is supposed to be cheaper than dc due to reduction in feeder stations, wastage of electricity in transmission between shoe and rail is 25% compared to 4% between pan and wire. This wastage alone, which is a considerable operating cost, justifies conversion of 3rd rail to 25kv.
A big new town can be arranged.....
These figures only really apply on the Southern Region.
And considering that the 25kV cost estimates are now essentially worthless (they have been blown as badly as the WCRM estimates were) this is likely not true for the Merseyside area.
Where electrical demand is a tiny tiny fraction of what it is in South London.
And reduction of feeder stations doesn't really help on such a compact network - or are you really suggesting that all the branches should be fed from one point so a single failure takes down the entire system?
Voltage drops will also be drastically lower as a result of the above.
Not sure if this is "new news" but the Liverpool tracks through Salford Central appear to be fully wired this morning.
Have you ever looked a the official flooding charts that cover the Croston and Rufford areas? Burscough itself is often mentioned in flood situations in the area of railway station infrastructure.
Lessons surely have been learnt from areas of the South-East and South-West where flooding is a problem.
It's true that DC is more cost-effective where stops are close together and in urban areas where the local grid is suitable to take large amounts of power every few miles. And I doubt OLE would fit in the Merseyrail tunnels without enlargement. This becomes less so when extensions are considered into more rural areas where stations and power supplies are further apart.
As that DeltaRail study on Branch line electrification showed a while back 750vDC also has important benefits in rural areas.
A six car multiple unit (pair of 377/3s as an exemplar) draws something like 2500hp including hotel loads, roughly 1900kW.
If we assume voltage sag to 500V for the worst case of end-of-line and maximum power draw that gives us a peak current per train of 3.8kA and a voltage drop of 400V (if we use the full width of voltage range in the standard and supply at 900V).
As this is a branch line each track will likely ever only support one train at a time, so we will use one continuous conductor rail. In reality since trains will not be at the end of the line and the rails will be paralleled regularly this is a conservative estimate.
3.8kA over 400V allows for a conductance of ~100milli-ohms.
The resistance of a high conductivity aluminium-steel conductor rail (according to the RGS) is roughly 7milli-ohm per km.
That means our standard will still be met after a full 14km from the substation.
That implies that no more than one substation is likely to be required for Ormskirk-Southport - although I would position two on the system, one at Southport where it can feed into the rest of Merseyrail and on at Burscough to reduce voltage drops. It would also put the high draw locations where trains are accelerating from a stand closer to the substations.
Since maximum load on the line is likely to be on the order of 8kA peak at 900V that will give a substation power of 7.2MW - which is still in the range of suitable metro substations if two facilities are taken.
(Two of ~3-4MW).
Additionally these stations can be far more flexible in choice of location as they can draw power from existing 33kV circuits such as those provided in the vicinity of Southport and Burscough, 25kV would either require a full 138kV circuit be provided or a special cross coutnry single phase line powered by the WCML electrification system.
25kV is inherently a single phase standard and the system won't like several hundred kW drawn from one phase unexpectedly in a rural setting where the 33kV system will struggle to absorb it.
A six car multiple unit (pair of 377/3s as an exemplar) draws something like 2500hp including hotel loads, roughly 1900kW.
If we assume voltage sag to 500V for the worst case of end-of-line and maximum power draw that gives us a peak current per train of 3.8kA and a voltage drop of 400V (if we use the full width of voltage range in the standard and supply at 900V).
That implies that no more than one substation is likely to be required for Ormskirk-Southport - although I would position two on the system, one at Southport where it can feed into the rest of Merseyrail and on at Burscough to reduce voltage drops. It would also put the high draw locations where trains are accelerating from a stand closer to the substations.
...
Additionally these stations can be far more flexible in choice of location as they can draw power from existing 33kV circuits such as those provided in the vicinity of Southport and Burscough, 25kV would either require a full 138kV circuit be provided or a special cross coutnry single phase line powered by the WCML electrification system.
The subject of extensions to the Merseyrail network has cropped up several times on the Merseyrail Planning New Stations Thread and in particular the subject of the possible OHLE electrification of the 1970's built tunnels. The original tunnels under the Mersey were built for steam traction and have a much larger bore, the 1970's extensions can handle full size 20m stock, and even Class 66's ! Class 313's were tested through the tunnels so there is obviously no problem with pan down, but nobody has yet been able to confirm one way or another if similar sized stock could work the tunnels with their pans up. It might be better to respond to this issue on the other thread given the topic of this current one.
Then again, Class 313's have a very similar body to the 507/508's.
Judge for yourself, personally I very much doubt it....
![]()
![]()
![]()
You also have to ask, why would you want to?
*The system is pretty much self contained.
*There is no freight that would benefit.
*Line speeds are unlikely to be raised any higher.
*Expensive (especially when there are other lines that are not electrified at all).
The only benefit I can see is that 25Kv is more efficient, however when you consider the fairly short length of each line (Chester, Ellesmere Port and Southport Excluded) will it really make that much difference?
I continue to have exasperating problems with Picasa, despite 8A_Rail's generous help. I've added 20 photos here:
https://picasaweb.google.com/110155...rification20134?authkey=Gv1sRgCNmM9tLBtNTlgAE
I'm sure someone will let me know if they are inaccessible.
Further evidence that Picasa no longer likes you? The above link doesn't work for me, nor do links from your previous posts that have worked before. (They may be textually identical to the above link, I haven't checked.)