Did a tour Lime St-Wigan NW-Roby-Earlestown-Lime St today, findings below:
Headlines:
1. First wires up East of Huyton Junction on Chat Moss
2. First "masts" up in Thatto Heath "canyon"
3. Visible signalling progress North of St Helens Central
4. Steady drip, drip, drip of masts put on top of bases
1. "Return Wires" now run on both sides of the track from about half way from Rainhill eastwards to immediately West of Lea Green station.
Just one extra photo, not especially exciting:
https://picasaweb.google.com/110155...hkey=Gv1sRgCJe_4d32ifS5bA#6043727916948023634
2. Eight (I think, I was distracted by another pasenger) "masts" have been attached to the fixings on both sides of the "canyon" between Eccleston Park and Thatto Heath. I write masts in inverted commas because they appear to be sections of standard masts, but only a few feet long and suspended above carriage roof height. This seems a really nifty way of dealing with the problem of such a steep-sided cutting. If the masts really are bog-standard mast sections or the bog-standard hangers protruding down at places such as Man Vic then bog standard arms etc can be attached to them using bog-standard methods. The arms won't know the masts they're attached to are suspended rather than stood.
3. There are now at least three signals lying flat, one signal up and bagged and two half signals on the Wigan Branch North of St Helens Central. There are also at least two signal bases in the area.
4. I counted 164 bases without masts, a net decrease of two, which isn't a huge amount, except it is a
net loss, ie some bases have been installed, notably just East of Huyton Junction but two more have been "topped" with a mast.
Otherwise, Roby is still liftless, though it now has some outside seats on platforms 1 & 2/3, though none in the shelter on P2/3. A substantial trench has been dug to the North of track 4-to-be, purpose seems to be for cabling, but wasn't really clear. No-one to hand to explain.
Between Roby and Huyton the trackbed of track 4 is being scraped down to bottom-of-ballast level. I have heard a rumour that track 4 will be laid earlier than expected, but have no corroboration for this. No masts or bases visible to the North of track 4 Roby-Huyton.
Two bases between tracks 2 & 3 immediately East of Huyton station. I can't fugure out where the masts for tracks 3 & 4 will go until installers have access to the new land North of track 4, anyone any ideas?
I estimate that the Wigan Branch bridge over the M6 will need a mast midway, the structure seems significantly longer than other mast spacings.
Two men in orange (one carrying a clipboard!!) on Rainhill station.
Two men painting the railings at Earlestown station.