• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Manchester Castlefield relief... again.

Dspatula

Member
Joined
19 Dec 2019
Messages
182
Location
Manchester
Been thinking since HS2 seems to have died the death in Manchester the opportunity to construct a north-eastern access to Piccadilly from Ashburys Philips park line.
Would be about 850 metres for the main viaduct between the Mancunian Way to Viaduct Street with probably around 200m of extension between Fairfield street and Travis Street.
Three 240m Platforms to the north of Platform 1 on the car park and new car park somewhere on Sheffield street to replace that.
Victoria to Piccadilly roughly 11 to 13 minutes if 20 miles per hour, or 9 to 10 minutes if upgraded to 35 miles an hour south of Philip park south junction.
Loss of around 5 to 9 minutes compared to current route from Salford Crescent depending on line speed and dwell times.

Divert the Blackpool and Southport Services onto this route (depends on TRU timetable)
Gain of three path at Oxford Road allows for return of all day 2 per hour Warrington stopper.
Flexibility of route between Stalybridge and Piccadilly.
A far from perfect solution but much more affordable than a tunnelled option.
Dark Ln curve.png
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,625
2 platforms are already planned next to 1. I don't see the need for access off Phillips Park myself, you are just sending trains through Vic which isn't exactly awash with capacity anyway, hence the new turnback sidings being built to pre empt TRU configuration states.
 

Top