Here is the sorry tale of the disruption at New St and the Coventry Corridor on Friday.

Track Circuit Failures Hampton in Arden & Coventry
At 0220 15 axle counters failed on the Up Stour line between Hampton in Arden & Coventry after the passage of 4O52 1829 (Thu) Wakefield – Southampton Western Docks.
Cause found to be handbrakes left on rear vehicle of train causing damage to all 4 wheelsets.
At 0449 12 axle counters reset.
At 0745 the remaining 3 axle counters reset.

4O52 1829 (Thu) Wakefield – Southampton Western Docks
At 0220 4O52 1829 (Thu) Wakefield – Southampton Western Docks stopped by signals at Coventry after leaving track circuit failures behind from Hampton In Arden
At 0240 Driver reported finding handbrake applied to all wheels on last vehicle
At 0343 fitter arrived to inspect
At 0427 fitter reports vehicle had 8 damaged wheels and would have to be removed from the train. The locomotive was run-round the train and the defective vehicle was shunted into Coventry Yard and secured.
At 0640 train clear of connections at the north end of Coventry station.
At 0745 train clear of connections at the south end of Coventry station, and train moved to Nuneaton line.
Cancellations 29 full, 14 part
105 trains affected causing 3047 minutes of delay.

Signalling Failure New St and Coventry Corridor
At 1003 multiple track circuit failures occur between Proof House Junction, Birmingham New Street and Birmingham International.
At 1119, a blown transformer is replaced which reopens the Stour line.
At 1159 Normal signalling is available out of Platforms 1, 2 & 3 at Birmingham New Street towards the Up Stour line.
Trains on the Down Stour to Platform 5 being talked past two signals.
Trains on the Down and Up Derby being talked past one signal into Platform 8.
At 1208 the cause was found to be three cables cut, two signalling cables and one domestic power cable, when a hole was drilled into Platform 1B.
At 1704 all the signalling cables were repaired and all track circuits showing clear.
At 2125 all signalling tested and restored to normal working.
Reported delays 14687 minutes
Trains affected 639
Trains cancelled 302 full, 230 part.

2R66 1157 Redditch – Lichfield Trent Valley High Level
At 1305 2R66 1157 Redditch – Lichfield Trent Valley High Level fails on the Up Gloucester line at University station with loss of power.
At 1415 2N54 1204 Longbridge – Lichfield City terminated at New St and set back to University to assist 2R66.
At 1425 both units depart for New St
At 1440 both units clear inside at New St
Significant reactionary delays were incurred until close of service, with severe platform congestion in the Birmingham New Street station area.
Train cancellations 3 full, 12 part
36 trains affected 1742 minutes delay.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SWT Driver

Member
Joined
29 Aug 2009
Messages
777
Location
The Twiglet Zone.
It seems procedures on the freight side are getting very lax, with the incorrect loading of a container which did loads of damage to Basingstoke canopy & loads of delays to all of the following services.

This isn't the only time I've heard of parking/hand brakes being left on.

I'm seriously starting to wonder if Disney Corp. are running it because it definitely seems to be run by a Mickey Mouse outfit.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
That's unbelievable... I wonder who has the bill for the damage caused by the freight train?
As far as I know, all train delay minutes are taken by the TOC concerned and at the end of the period they are balanced out against delays caused by other TOCs/ Network Rail.

The balance becomes payable.

As far as Infrastructure train delays and cancellations affecting renewals work are concerned there is effectively a cap above which the FOC does not pay. Some Contracts however require the Infrastructure Contractor to bear all their losses, staff, machines, loss of profit, rework, etc which can be substantial and means that this has to be covered in the potential losses (risk "pot") thus increasing the costs to everyone.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,125
Location
Birmingham
I am so glad I have not had to go to London so far this year. With all of the weather issues and contractor cockups affecting the WCML, and the DLR station at Bank being closed, the trip from Birmingham International to East India (DLR Station) and return could have taken an age :D
 

Wyvern

Established Member
Joined
27 Oct 2009
Messages
1,573
Originally Posted by GB
computed axial tomography
Wrong. CAT is a Cable Avoidance Tool and should be used along with a signal generator (genny).
Thank the Lord for that. I was wondering how the hell it could work. :-x
 

SWT Driver

Member
Joined
29 Aug 2009
Messages
777
Location
The Twiglet Zone.
Newsflash!

They've found the contractor responsible for doing the damage!

They ran a full medical scan on the individual & one of the scan pictures is now available for public viewing...

homers-brain1.jpg
 