Going back to the original topic.....
What I'd like to see is very Pie in the Sky, for financial and (mostly) structual reasons. Nevertheless my dreams are....
1) Fast and slow up & down lines between Kings Cross and Doncaster. It means building an extra viaduct in parallel with the Welwyn Viaduct, parallel tunnels north & south of Grantham and rebuilding stations, particularly Grantham, Newark and Doncaster.
2) Fast and slow up & down lines between Euston and Weaver Junction. This doesn't need so much work - mostly between Rugby and Stafford.
3) Installing flyovers or dive-unders at MAJOR junctions, such as Hitchin, Newark Crossing, Doncaster Marshgate, Colwich Junction, Westerleigh, Stoke Gifford. The list is almost endless.
I shall refrain from suggesting electrification, as this has been dealt with elsewhere. However, I have been assured that it is NOT possible to electrify the Severn Tunnel - there is no room for OHLE as the trackbed can't go any lower.
As someone rightly said, Birmingham New Street needs a rebuild, but I haven't got a scooby how to implement it. I'd like to see the New Street - Moseley - Kings Norton upgraded and have regular XC (and local) services run along it. It'll save time reversing Wolverhampton - Cheltenham services. Also, I think it's feasible to open (re-open?) a line from Derby through Lichfield and Walsall to the North-West entrance of New Street. Again, it's to obviate reversing Derby - Birmingham - Coventry XC services.
I fail to understand why some junctions (such as Euxton or Carstairs South - there are others) insist on reducing the joining double line to a single line. It makes an existing bottleneck even worse.
As a sort-of side issue, I'd like the ENTIRE Passenger TimeTable converted to Clock face. I reckon it could be done, but I'm denied the mechanism to (dis)prove it.