Hail All! 
As a long standing observer and supporter of the Transrapid system, thought I'd drop in a few brief comments about a few bits and pieces...
Germany's plan to launch a magnetic levitation - or maglev - rail service has collapsed amid soaring costs.
It was to be built in Munich from the airport to the city centre, making it Europe's first commercial maglev train.
The plans came unstuck after the estimated cost of the track spiralled to 3.2bn euros ($5bn; £2.5bn), up from 1.85bn euros...
NOOOOOOOOOOOOOOOO!!!!!!!!!!!!!!! :cry::cry::cry:
And just when things were starting to look up after the (Easily avoidable)
Emsland incident as well...

ad:
Maglev is a lot of money...and at present, it's only 45 minutes from the Airport to the City centre via S8 (or S1)...which it has to be said, puts any local train service in the UK to shame.
Two words: Stansted Express!

:razz:
...Although I've been giving thought to a better version of the Stansted Express that'd use the Transrapid system running in a vacuum (See the Discovery
Extreme Engineering episode on the
Transatlantic Tunnel) insted of the bog standard wheel/rail combo. Assuming even a
very low operational speed for such a system (Say about 750mph), Liverpool Street to Stansted could be cut down to a five minute or quicker journey, I reckon! :grin:

I think Maglev is an expensive waste of money. 220mph for conventional rail, which is happening now, is quite sufficient...
In my own opinion, the only trains that should ever go as slow as 220mph are modified Pacers on stopping services.
Although I understand (And support) the idea of running a decent number of services on slower Intercity workings (Those under 300mph) for the benefit of passengers who may not like more reasonable speeds, I'd sooner choose the TR-07 doing 1,250mph any day!

(And besides...Given the short distance between the two, London to Aberdeen shouldn't ever take more than ten minutes anyway IMO!

)
And in terms of cost: Read up on the old Maglev system that used to operate between Birmingham Intl. Airport and the NEC. The thing was so devoid of wear and tear that it ran for 30 years on all of it's original components, with nothing more than inspections and the occasional adjustment being needed in all that time - As far as I am aware.

hock::grin:
Now try convincing me that traditional trains could claim a maintenance record like that!

:razz:
You're correct. HSR is probably near it's top speed, because of wear on the parts and limitations on noise pollution.
Again, I agree with ye that HSR is probabally getting near it's maximum potential, although I daresay that the French and the Japanese will probabally manage to push Intercity HSR up to about 350-400mph before HSR is considered to have "peaked".
That, and ye do NOT want to see what I would be managing if ever I was to take the controls of an APT whilst listening to Finntroll...

hock:

To summerise: I support decent Maglev designs all the way, and dream of the day when we'll be able to "fly" from London to Moscow in 20 minutes, on a Transrapid 07 in perfect comfort and at half decent speeds.

However, I'm happy with most designs of Maglev system...So long as we don't end up with that wasteful and completely impractical pile of cack (IMHO) that Japanese Railways are developing at the moment! :grin::razz:
Farewell...
>> Death <<