The line basically made a triangular junction with the Atherton Line. . . .
The way the Hilton House branch came to achieve its final triangular configuration was a little non-intuitive, with intervals of several decades (or one generation) between construction of the various legs.
The opening dates of the different lines involved were:
- 1841 Bolton - Chorley (subsequently extended to Euxton & Preston)
- 1848 Lostock Jn - Hindley - Wigan -Liverpool
- 1868 Hindley (Crow Nest Jn) to Blackrod (Red Moss Jn)
- 1889 Daisy Hill (Dobbs Brow Jn) to Hindley & Blackrod Branch Jn (midway along the Hilton House branch.
As with many lines in the area, the initial impetus was accessing multiple small collieries along the route - mainly around Hilton House and Scot Lane. In fact the formation of the line between Hilton House and the junction with the Bolton-Preston line seemed to follow the course of a pre-existing colliery line.
Also worth mentioning is that the original Crow Nest Junction was not in the form it is today - the Atherton line did not exist back then, and the original junction was only between the Blackrod and Westhoughton lines, located closer to the site of Crow Nest Farm.
The branch became really quite useful after 1889, when the north-to-east connection to Dobbs Brow Junction was built by the L&YR as an enhancement to their brand-new four-track "Atherton" main line.
Has anyone other information on other services that would have used that line. . . .
The 1968 Working Timetable, the final year before the Hilton House line closed, shows the pattern of services in its final run-down state. Both halts, of course, were long-closed by this time.
There were significant difference between Mon-Fri and Saturday trains.
Mon - Fri - Down direction
0F19 12:33 Wigan NW - Chorley Light Diesel (to work return parcels train)
2P65 17:05 Manchester Vic - Blackpool North DMU
1P32 21:50 Manchester Exchange - Heysham Newspapers (noted as "Q" - only ran when required)
1S04 23:20 Manchester Exchange - Glasgow Central Postal
Saturdays Only - Down direction
1M51 08:17 Morley Low - Blackpool North (summer Saturdays only)
1P75 08:15 Leicester London Rd - Blackpool North (summer Saturdays only)
2P65 10:55 Man Vic - Blackpool North DMU (summer only, called at all Atherton line stations between Pendleton & Daisy Hill)
1S78 21:26 Manchester Exchange - Aberdeen Newspapers
1S04 22:50 Manchester Exchange - Glasgow Central Newspapers
Mon - Fri - Up direction
3F19 13:55 Chorley - Wigan NW parcels
This was the only train booked over the line in this direction SX. The three fast morning peak Residential trains from the Fylde to Manchester all had been routed non-stop via Bolton by 1968.
Saturdays Only - Up direction
1N84 12:55 Blackpool North - Leeds City (summer Saturdays only)
2J64 13:00 Blackpool North - Man Vic DMU (summer only, called at all Atherton line stations from Daisy Hill to Pendleton).
0Z00 13:00 Blackpool North - Newton Heath TMD Light Diesel (operated on those Saturdays when 2J64 did not run)
. . . . especially those which would have called at the two railway stations.
I suspect even in the earliest days the two stations at Dicconson Lane & Aspull and Hilton House were of very peripheral importance. Neither was in a densely populated or heavily-industrialised area, and as far as I can see, they were only ever served by local trains between Wigan Wallgate and Chorley, not by longer distance trains to Manchester or Preston which passed through non-stop.
Geoffrey Holt's
Regional History of the Railways of Great Britain gives the following chronology for Dicconson Lane and Hilton House stations:-
- July 1868 - line opened.
- April 1917 - both stations closed as World War 1 economy measure.
- May 1919 - both station re-opened.
- 1936 - Dicconson Lane reduced to status of a halt.
- 1945 - Hilton House reduced to status of a halt.
- Feb 1954 - both stations closed.
The nails would really have been driven into the coffins after WW2 when Wigan and Bolton Corporations and Ribble Motor Services started regular bus services to/from Wigan, Bolton and Chorley which ran right past both Dicconson Lane and Hilton House stations.
These attachments show the 1949 timetable for the Wigan - Chorley line with stops at Dicconson Lane / Hilton House - rendered into the clearer modern BR / Network Rail format (and 24hr clock). Given the inertia of rail services on lines like this, this may well have been the timetable for many years through the LMS era.
