WessexWarrior
Member
Not sure if this has been posted before or not...
From: http://www.southwesttrains.co.uk/SWTrains/Timetablesearch/EngineeringWorks/
From: http://www.southwesttrains.co.uk/SWTrains/Timetablesearch/EngineeringWorks/
The Lymington branch will be closed for seven weeks from 30 September 2007 to 18 November 2007 for major flood defence work between Lymington Town and Lymington Pier. Replacement bus services will run during this period and passengers connecting with the Lymington to Yarmouth ferries will need to allow extra time.