• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

lymigton branch

Status
Not open for further replies.

341o2

Established Member
Joined
17 Oct 2011
Messages
2,013
I've noted 3 recent occasions where a 450 has worked the branch weekdays. Is the branch now worked by a 450 and the 158's have been displaced? Any info appreciated
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

David10

Member
Joined
25 May 2012
Messages
391
Location
Manchester
Has been operated by a 450 during the Olympics to release the normal 158 to operate Bournemouth - Weymouth extras.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
SWT are deferring small maintenance jobs to increase the number of units available so there are a few extra 450s available, it wont last past the olympics because then they will be playing catch up before the paralympics start.
 

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
Has been operated by a 450 during the Olympics to release the normal 158 to operate Bournemouth - Weymouth extras.

Forgive my pedantry, but would it not make more sense to use the additional 4 car 450 on the Olympic extras rather than a 2 car 158? Seems a very bizarre way of doing things, is that for definite? I would have thought that strengthening the diesel services out of Waterloo might have been a more sensible option?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,270
Forgive my pedantry, but would it not make more sense to use the additional 4 car 450 on the Olympic extras rather than a 2 car 158? Seems a very bizarre way of doing things, is that for definite? I would have thought that strengthening the diesel services out of Waterloo might have been a more sensible option?

As mentioned in about a dozen different discussions so far, there are power supply restrictions at the far end of the Weymouth line. Using a couple of 5 car 158/159 combinations to augment the service beyond Bournemouth means that they can run extras without worrying about third rail overloads...
 

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
As mentioned in about a dozen different discussions so far, there are power supply restrictions at the far end of the Weymouth line. Using a couple of 5 car 158/159 combinations to augment the service beyond Bournemouth means that they can run extras without worrying about third rail overloads...

Ah, that would explain it then! I'd missed those other conversations, thanks for that info :)
 

louis97

Established Member
Joined
14 May 2008
Messages
2,147
Location
Derby
As mentioned in about a dozen different discussions so far, there are power supply restrictions at the far end of the Weymouth line. Using a couple of 5 car 158/159 combinations to augment the service beyond Bournemouth means that they can run extras without worrying about third rail overloads...

A few 8 and 12 car 450s have visited Weymouth over the Olympics with special permission from Network Rail.

However, as a result of the power supply on the line to Weymouth, which was electrified in the late 1980s and the single track section on part of the route, the number and length of trains that run on this route are limited. We have worked in partnership with Network Rail to enable the maximum number of trains to operate during the Games, and to enable key trains to be strengthened by drawing extra power for this limited period.

http://www.southwesttrains.co.uk/games-train-tickets.aspx#102383
 

Helvellyn

Established Member
Joined
28 Aug 2009
Messages
2,572
A few 8 and 12 car 450s have visited Weymouth over the Olympics with special permission from Network Rail.
They've got a couple of 8-cars booked to/from Weymouth each day, but no 12-cars. They definitely would overload the third rail.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
When the 8 coach trains have run to Weymouth every electrical substation has been manned with NR staff in case of problems, not a very efficient use of staff.

the 12 coach one ran at times when it would be the only train drawing power.
 
Status
Not open for further replies.

Top