South of Luton adjacememt to the crescent stone siding, there is a centre siding, the S&C has been removed its totally redundant. I’m curious how this was used in its day, whether it was for passenger trains or freight. I’m also interested In what year it’s last use would of been.

any help appreciated
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Supercoss

Member
Joined
5 Jun 2016
Messages
464
Siding fell out of favour as it didn't have a walking route to get to or from under modern day safety practise , ok for class 319 and 317 as you could drive in change ends and driver could ' change ends' within unit before coming back out, a few services attached or detached units at Luton but this was usually achieved in plat 2 and the area north of plat 2 that could stable a 4 car clear of platform
i can't recall anything post 2000 , when a rail defect occurred the pointwork was 'plain lined'
then when Luton South Junction was renewed with concrete bearers it was removed altogether
pic of plain lined era with crossing removed and switch spiked out of use
1672496132011.jpeg
1672496732604.jpeg
 
Last edited:

Ladder23

Established Member
Joined
29 Oct 2015
Messages
1,880
Siding fell out of favour as it didn't have a walking route to get to or from under modern day safety practise , ok for class 319 and 317 as you could drive in change ends and driver could ' change ends' within unit before coming back out, a few services attached or detached units at Luton but this was usually achieved in plat 2 and the area north of plat 2 that could stable a 4 car clear of platform
i can't recall anything post 2000 , when a rail defect occurred the pointwork was 'plain lined'
then when Luton South Junction was renewed with concrete bearers it was removed altogether
pic of plain lined era with crossing removed and switch spiked out of use
View attachment 126317
Nice shot, have waked the patch many times, my rail career started just shy of 10 years so the sidings current state is how I always remember it. It always bugged me.

Thanks for the additional info
 

Supercoss

Member
Joined
5 Jun 2016
Messages
464
Later next year (2023 ) the ground frame at adjacent Crescent Road gets renewed with an electronic ground switch panel replacing the mechanical ground frame , this will allow empty trains to stable at Luton yard overnight then run empty towards Parkway and coming into passenger use at Harpenden giving Harpenden punters an empty train to fill , Then off peak it allows longer length freight trains to serve the stone siding Without multiple shunts they can set back in directly to unloading area
Harpenden punters finally get the extra train they wanted and G T R have to employ someone to operate electronic ground frame to let empty set out onto up line .
 

Ladder23

Established Member
Joined
29 Oct 2015
Messages
1,880
Later next year (2023 ) the ground frame at adjacent Crescent Road gets renewed with an electronic ground switch panel replacing the mechanical ground frame , this will allow empty trains to stable at Luton yard overnight then run empty towards Parkway and coming into passenger use at Harpenden giving Harpenden punters an empty train to fill , Then off peak it allows longer length freight trains to serve the stone siding Without multiple shunts they can set back in directly to unloading area
Harpenden punters finally get the extra train they wanted and G T R have to employ someone to operate electronic ground frame to let empty set out onto up line .
Very interesting, I wonder how this will affect the stone yard, most days the wagons are in there and both sidings are used for shunting of wagons, I assume a complete redesign and more electrification
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
I seem to remember that there were still some Midland Railway chairs down towards the buffer end of that siding.
 

Ladder23

Established Member
Joined
29 Oct 2015
Messages
1,880
I seem to remember that there were still some Midland Railway chairs down towards the buffer end of that siding.
I could take a look, I'm always working around there.
 