Given track relaying with concrete sleepers and welded rail, is there any scope for speeding up the DMUs? I'm assuming anything loco hauled is limited at bridges and generally lower speed limits. Very interested to see what is being planned to increase services to Fort William, when the new normal is over!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Journeyman

Established Member
Joined
16 Apr 2014
Messages
6,295
Given track relaying with concrete sleepers and welded rail, is there any scope for speeding up the DMUs? I'm assuming anything loco hauled is limited at bridges and generally lower speed limits. Very interested to see what is being planned to increase services to Fort William, when the new normal is over!

I think the biggest issues affecting speeds are gradients and curves, but it'll be interesting to see what something light and flexible like the FLIRT would make of those.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,875
Given track relaying with concrete sleepers and welded rail, is there any scope for speeding up the DMUs? I'm assuming anything loco hauled is limited at bridges and generally lower speed limits. Very interested to see what is being planned to increase services to Fort William, when the new normal is over!

You don’t need concrete sleepers and CWR to increase the speed above what the WHL is now.
 