adamedwards
Member
- Joined
- 4 Apr 2016
- Messages
- 796
Given track relaying with concrete sleepers and welded rail, is there any scope for speeding up the DMUs? I'm assuming anything loco hauled is limited at bridges and generally lower speed limits. Very interested to see what is being planned to increase services to Fort William, when the new normal is over!