• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Lots of ECS running

Status
Not open for further replies.

Bovverboy

Established Member
Joined
1 Dec 2013
Messages
2,098
I never cease to be amazed how much empty running there is on Britain's railways. This morning, Northern's 2K30 (0603 Manchester Piccadilly - Crewe) was cancelled through lack of a conductor. Naturally enough, the return 2F23 (0713 Crewe - Liverpool Lime Street via Manchester Airport) was cancelled over the section Crewe - Manchester Oxford Road. Yet both those journeys operated, ECS. Does that sort of thing happen a lot?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gnolife

Established Member
Joined
4 Nov 2010
Messages
2,047
Location
Johnstone
I never cease to be amazed how much empty running there is on Britain's railways. This morning, Northern's 2K30 (0603 Manchester Piccadilly - Crewe) was cancelled through lack of a conductor. Naturally enough, the return 2F23 (Crewe - Liverpool Lime Street via Manchester Airport) was cancelled over the section Crewe - Manchester Oxford Road. Yet both those journeys operated, ECS. Does that sort of thing happen a lot?
You'd have to run at least part of it, whether it's to Longsight, to Alderley Edge, or all the way to Crewe to get the unit in place at Oxford Road for it to work 2F32 to Liverpool.
 

Bovverboy

Established Member
Joined
1 Dec 2013
Messages
2,098
Services regularly get cancelled Piccadilly - Crewe - Oxford Road, or vice versa, but they aren't usually sent to Crewe to reverse.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,873
Location
East Anglia
Until I became traincrew I thought like that. Nowadays it’s just normal. Miles & miles of ECS & all I worry about is getting back & done as early as possible.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,201
I never cease to be amazed how much empty running there is on Britain's railways. This morning, Northern's 2K30 (0603 Manchester Piccadilly - Crewe) was cancelled through lack of a conductor. Naturally enough, the return 2F23 (0713 Crewe - Liverpool Lime Street via Manchester Airport) was cancelled over the section Crewe - Manchester Oxford Road. Yet both those journeys operated, ECS. Does that sort of thing happen a lot?
Presumably it's easier to keep them rolling than to find somewhere to stable it.
 

175001

On Moderation
Joined
3 Feb 2007
Messages
1,360
Location
Between Heaven and Hell
Yesterday, a Blackpool - Hazel Grove was caped at Oxford Road due to no conductor, so the units ran ECS to Hazel Grove to sit in the sidings out of the way
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,873
Location
East Anglia
Yesterday, a Blackpool - Hazel Grove was caped at Oxford Road due to no conductor, so the units ran ECS to Hazel Grove to sit in the sidings out of the way
EMR regularly run empty Norwich-Nottingham if no conductor is available.
 

The Lad

Member
Joined
22 Jan 2015
Messages
408
If the driver is available it keeps the unit in the right places for crew swaps or in one recent case to catch up the conductor who had mistakenly caught an earlier train.
 

47827

Member
Joined
3 Mar 2020
Messages
591
Location
Middleport
I know how ridiculous some of these things are. It's been going on for years too. I wouldn't be surprised if sometimes the drivers don't sign a siding or depot (say Longsight) the train should be sent instead. There's also the mindset that diversion into a depot or siding space could create a conflict with another scheduled train using the route. On some occasions trains have also run ECS to keep up route knowledge on occasions when drivers don't get to go over a line very often. There's a whole host of random reasons. I remember 47772 one Sunday on a XC service many years ago running ECS from Darlington to Newcastle and back to somewhere else as it had a safety fault preventing it carrying on in service as there was nowhere to put it.
 
Status
Not open for further replies.

Top