• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Longer trains for Lumo - how?

Status
Not open for further replies.

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,142
Location
"Marston Vale mafia"
From the LNER fares thread:

If adding luggage racks is the aim then extending existing units has to be the answer. The reason that there are no racks is that Lumo found a novel way to comply with the 400 seat minimum within five car trains. Extending existing units can only be done by ordering from Hitachi

I would be astonished if they didn't get agreement to reduce the capacity of their existing sets on the condition of running them only in ten-car formations unless forced to run a 5 because of a failure. You can then order whatever you like for the other units.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BRX

Established Member
Joined
20 Oct 2008
Messages
4,502
What's the 400 seat minimum about?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,142
Location
"Marston Vale mafia"
What's the 400 seat minimum about?

It was a condition of their track access application to have a minimum of 400 seats in each train. The intention of this was I believe to force them to go for 7-car trains to make the most of capacity, but what they decided to do was a very high density layout with almost no luggage provision in order to save money by cramming that into a 5-car train.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,265
No, it wasn’t. It was to make sure that they procured trains that met their submitted business plan demand and couldn’t just hire or lease in lower density stock that didn’t.

7 cars were never contemplated in the initial application process, either by the ORR or Lumo.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,315
Reading an interview with Martin Gilbert, managing Director of Open Acess for first group, and he says he has ambitions for Lumo to operate some of there ECML services as 10 car operation, but they are currently unable to due to the over head power supply not having the capacity (presume between Edinburgh and Newcastle)
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,611
Reading an interview with Martin Gilbert, managing Director of Open Acess for first group, and he says he has ambitions for Lumo to operate some of there ECML services as 10 car operation, but they are currently unable to due to the over head power supply not having the capacity (presume between Edinburgh and Newcastle)

Which seem reasonable given Hull Trains plan 10 car services 4 (or is it 5) days a week.
 
Status
Not open for further replies.

Top