I’ll divide this into several categories;
- Service provision
- Rolling stock
- Necessary infrastructure improvements
- Miscellaneous e.g. ticketing
- Aspirational / Borderline fantasy
Service provision (In addition to the 2016 Arriva aspirations):
- A return to pre-COVID/MRTF frequencies
- The planned 4tph Leeds to Harrogate should also call at Headingley & Burley Park
- An additional 1tph Preston to Leeds also calling at Bamber Bridge, Church & Oswaldtwsistle, Rose Grove & all stations beyond there. This could be an extension of the existing Halifax to Hull so that it doesn’t take up any more paths around Leeds & Bradford Interchange.
- 1tph Huddersfield to Wigan via Calder Valley to create 2tph between Brighouse & Wigan with the same stopping pattern
- Accelerate the Chester to Leeds service to have the same stopping pattern as the Leeds to Manchester Victoria service on the opposite side of the hour. This will also provide Walsden with 2tph in each direction.
- 1tph Barnsley to York via Castleford
- 1tph semi-fast Huddersfield to Sheffield via a reopened Horbury curve
- Extend the Huddersfield to Castleford service to Leeds
- Accelerate the Sheffield to Leeds stopping service to run non-stop from Normanton to Leeds
- Accelerate the Blackburn to Manchester Victoria via Todmorden service to call only at Rochdale beyond Todmorden.
- Accelerate Leeds to Wigan to run non-stop between Leeds & Dewsbury.
- Accelerate Skipton to Leeds to run non-stop from Keighley to Shipley.
- 2tph from Keighley to Leeds, calling at all stations apart from Kirkstall Forge
- 1tph York to Sunderland (Will probably have to use the slow lines from York to Thirsk)
- 2tph Newcastle to Ashington via Blyth
- 2tph Newcastle to Morpeth, later extended to Ashington with a stop at Pegswood.
- Re-route the Southport to Castlefield service via Golborne
- 2tph all stations vice Clifton Wigan to Stalybridge via Bolton (once electrified)
- 2tph all stations vice Ardwick Manchester Piccadilly to Stalybridge.
- Accelerate the Manchester Piccadilly to Hadfield / Rose Hill Marple service to run non-stop from Piccadilly to Guide Bridge.
- 2tph ALL stations vice Ardwick Manchester Piccadilly to New Mills Central.
- Accelerate the Hope Valley stopper to run non-stop from Piccadilly to Romiley.
- 2tph from Sheffield to Nottingham, also calling at the reopened Dore MML platforms.
- 1tph Manchester Airport to Windermere/Barrow, dividing at Lancaster.
- Extend all Cumbrian coast services to Lancaster.
- 2tph Lancaster to Morecambe
Rolling stock:
- At least three coach trains on all services into Sheffield, Manchester, Liverpool, Leeds & Newcastle.
- Any more pure EMUs should be 331s or a future variant for more homogeneity.
- Look into the possibility of using Batteries on services that spend just a few miles away from electrification.
- Stadler Flirts, ideally with a door arrangement like that of TfW rather than GA to replace Class 150, 155, 156 & 769 on stopping services and longer distance services that spend at least half of their time beneath the wires.
- Keep some 158s for express passenger trains and rural services e.g. Leeds to Carlisle/Morecambe, Tyne & Tees valley services, Cumbrian Coast (if there’s any way to clear them), Yorkshire Coast & York to Scarborough that would have happened if it weren’t for COVID.
- Use 170s only on services with long gaps between stations where they can routinely get into direct drive.
- Use 195s on services where there is the lowest percentage of electrification.
Infrastructure (That hasn’t already been announced/confirmed):
- Castlefield corridor upgrade (Well… Obviously!)
- Power supply upgrades (BOO… boring)
- Changes to signalling and level crossings to facilitate increased frequencies
- A turnback at Keighley.
- Platforms for the Hallam line platforms at Leeds, maybe this could go where the HS2 platforms were supposed to go.
- Budget (Or half-a***d depending on your viewpoint) electrification projects where tunnels / discrete areas aren’t electrified and trains fitted with small battery packs, similar to what is being done in the Welsh Valleys, ideally on routes with self-contained service. The two that I can think of being the Harrogate loop and Bolton to Clitheroe, as well as Miles platting to Rochdale which is required to run these services but would most likely fall into a greater Calder Valley scheme.
- Some form of grade-separation at Salford Crescent to enable parallel movements without needing trains travelling in the other direction to wait outside the station, although I’m not sure if this is entirely possible.
- Segregation of Harrogate loop from ECML.
Miscellaneous:
- PAYG tickets in PTE areas with the same fairs system as Metrolink/TfL
Aspirational / Borderline fantasy:
- Full electrification of the Calder Valley line, Hope Valley line, MML to Doncaster & South Kirkby Jn & Hallam line.
- Reopen the Skipton to Colne line to fully another, preferably electrified Transpennine route.
- Put ECML trains passing Doncaster without stopping into a tunnel to allow more east-west traffic.
- 4 track Apperley Jn to Armley Jn & 6-track Armley Jn to Leeds.
- 4 track Dore to Meadowhall, with Grade separated junctions at Dore & Meadowhall.
- Segregate arrivals into Leeds from Wakefield Westgate & Bradford Interchange.
Let me what you think of my ideas and add your own.
I’ll divide this into several categories;
- Service provision
- Rolling stock
- Necessary infrastructure improvements
- Miscellaneous e.g. ticketing
- Aspirational / Borderline fantasy
Service provision (In addition to the 2016 Arriva aspirations):
- A return to pre-COVID/MRTF frequencies
- The planned 4tph Leeds to Harrogate should also call at Headingley & Burley Park
- An additional 1tph Preston to Leeds also calling at Bamber Bridge, Church & Oswaldtwsistle, Rose Grove & all stations beyond there. This could be an extension of the existing Halifax to Hull so that it doesn’t take up any more paths around Leeds & Bradford Interchange.
- 1tph Huddersfield to Wigan via Calder Valley to create 2tph between Brighouse & Wigan with the same stopping pattern
- Accelerate the Chester to Leeds service to have the same stopping pattern as the Leeds to Manchester Victoria service on the opposite side of the hour. This will also provide Walsden with 2tph in each direction.
- 1tph Barnsley to York via Castleford
- 1tph semi-fast Huddersfield to Sheffield via a reopened Horbury curve
- Extend the Huddersfield to Castleford service to Leeds
- Accelerate the Sheffield to Leeds stopping service to run non-stop from Normanton to Leeds
- Accelerate the Blackburn to Manchester Victoria via Todmorden service to call only at Rochdale beyond Todmorden.
- Accelerate Leeds to Wigan to run non-stop between Leeds & Dewsbury.
- Accelerate Skipton to Leeds to run non-stop from Keighley to Shipley.
- 2tph from Keighley to Leeds, calling at all stations apart from Kirkstall Forge
- 1tph York to Sunderland (Will probably have to use the slow lines from York to Thirsk)
- 2tph Newcastle to Ashington via Blyth
- 2tph Newcastle to Morpeth, later extended to Ashington with a stop at Pegswood.
- Re-route the Southport to Castlefield service via Golborne
- 2tph all stations vice Clifton Wigan to Stalybridge via Bolton (once electrified)
- 2tph all stations vice Ardwick Manchester Piccadilly to Stalybridge.
- Accelerate the Manchester Piccadilly to Hadfield / Rose Hill Marple service to run non-stop from Piccadilly to Guide Bridge.
- 2tph ALL stations vice Ardwick Manchester Piccadilly to New Mills Central.
- Accelerate the Hope Valley stopper to run non-stop from Piccadilly to Romiley.
- 2tph from Sheffield to Nottingham, also calling at the reopened Dore MML platforms.
- 1tph Manchester Airport to Windermere/Barrow, dividing at Lancaster.
- Extend all Cumbrian coast services to Lancaster.
- 2tph Lancaster to Morecambe
Rolling stock:
- At least three coach trains on all services into Sheffield, Manchester, Liverpool, Leeds & Newcastle.
- Any more pure EMUs should be 331s or a future variant for more homogeneity.
- Look into the possibility of using Batteries on services that spend just a few miles away from electrification.
- Stadler Flirts, ideally with a door arrangement like that of TfW rather than GA to replace Class 150, 155, 156 & 769 on stopping services and longer distance services that spend at least half of their time beneath the wires.
- Keep some 158s for express passenger trains and rural services e.g. Leeds to Carlisle/Morecambe, Tyne & Tees valley services, Cumbrian Coast (if there’s any way to clear them), Yorkshire Coast & York to Scarborough that would have happened if it weren’t for COVID.
- Use 170s only on services with long gaps between stations where they can routinely get into direct drive.
- Use 195s on services where there is the lowest percentage of electrification.
Infrastructure (That hasn’t already been announced/confirmed):
- Castlefield corridor upgrade (Well… Obviously!)
- Power supply upgrades (BOO… boring)
- Changes to signalling and level crossings to facilitate increased frequencies
- A turnback at Keighley.
- Platforms for the Hallam line platforms at Leeds, maybe this could go where the HS2 platforms were supposed to go.
- Budget (Or half-a***d depending on your viewpoint) electrification projects where tunnels / discrete areas aren’t electrified and trains fitted with small battery packs, similar to what is being done in the Welsh Valleys, ideally on routes with self-contained service. The two that I can think of being the Harrogate loop and Bolton to Clitheroe, as well as Miles platting to Rochdale which is required to run these services but would most likely fall into a greater Calder Valley scheme.
- Some form of grade-separation at Salford Crescent to enable parallel movements without needing trains travelling in the other direction to wait outside the station, although I’m not sure if this is entirely possible.
- Segregation of Harrogate loop from ECML.
Miscellaneous:
- PAYG tickets in PTE areas with the same fairs system as Metrolink/TfL
Aspirational / Borderline fantasy:
- Full electrification of the Calder Valley line, Hope Valley line, MML to Doncaster & South Kirkby Jn & Hallam line.
- Reopen the Skipton to Colne line to fully another, preferably electrified Transpennine route.
- Put ECML trains passing Doncaster without stopping into a tunnel to allow more east-west traffic.
- 4 track Apperley Jn to Armley Jn & 6-track Armley Jn to Leeds.
- 4 track Dore to Meadowhall, with Grade separated junctions at Dore & Meadowhall.
- Segregate arrivals into Leeds from Wakefield Westgate & Bradford Interchange.
Let me what you think of my ideas and add your own.