• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

London to Brighton fast runs.

Status
Not open for further replies.

AM9

Veteran Member
Joined
13 May 2014
Messages
16,063
Location
St Albans
Not for the first time, I came across this Video 125 video on Youtube today:
and it triggered some thoughts in my mind about how a run would fare today. The 2005 record was set using a class 377/4 carrying 300 passengers, running from London Bridge down the BML to Brighton.
A few things have changed since then that might make an even faster time possible (or not):
a class 700 could be used as it is lighter than an Electrostar but has more power available even after it being limited on 750VDC
the track layout from London Bridge to Bricklayers Arms junction might allow a quicker getaway
the track may be in better condition at key junctions, e.g. East Croydon, Haywards Heath, etc..
the driver wouldn't have Charles Horton looking over his shoulder :)​
Can anybody suggest whether a faster time could be achieved, (using representative stock used on the route?)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Warwick

Member
Joined
10 Apr 2018
Messages
353
Location
On the naughty step again.
Could it be done faster?
Almost certainly yes.
Will it be done faster?
Well, I would refer you to GWR's attempt on the Paddington to Reading run with a powerful modern EMU, a re-signalled and re-aligned line....which failed to beat a record set by an HST some years previously.
 

Ted633

Member
Joined
15 Mar 2018
Messages
571
Something against a faster time though would be Gatwick, as (I think) they can no longer go flat out since platform 7 was put in (going southbound anyway)
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,063
Location
St Albans
Something against a faster time though would be Gatwick, as (I think) they can no longer go flat out since platform 7 was put in (going southbound anyway)
In the 2005 run, the route was set through platform 2 which iSTR was taken at 100mph. Isn't that still possible as the formations seems to be the same now?

My other observation was that the driver, on several occasions said that the effect of a 300 passenger load was slowing progress both on inclines (e.g. Forest Hill) and acceleration at various locations. I believe that a class700 (8 or 12 car) has a higher power-to-weight ratio than any Electrostar (including 387) so even an 8-car set would probably perform better on the run.
 

Warwick

Member
Joined
10 Apr 2018
Messages
353
Location
On the naughty step again.
Having recently travelled through Gatwick Airport railway station I seem to remember that platform 2 is a curvy one. I believe that 4 and 5 are the fast lines straight ones.
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,400
Something against a faster time though would be Gatwick, as (I think) they can no longer go flat out since platform 7 was put in (going southbound anyway)

Not through platform 7 (turnout limited to 60mph, I think). However platform 5 can still be run through at linespeed, which some trains still do, though there are more trains stopping at Gatwick now, and punctuality on the line has been pretty poor during the evening peak since the timetable change.

Any record-attempting run would have to go at a quiet time, probably early on a Sunday.
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,145
Location
Redcar
Well, I would refer you to GWR's attempt on the Paddington to Reading run with a powerful modern EMU, a re-signalled and re-aligned line....which failed to beat a record set by an HST some years previously.

When did they attempt this? Was there a thread? Thanks
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,063
Location
St Albans
When did they attempt this? Was there a thread? Thanks
If the HST run was in BR days, wasn't there a more relaxed attitude to speed limits than today's 'more than 3mph over and it's tea and no biscuits' rules?
 

Warwick

Member
Joined
10 Apr 2018
Messages
353
Location
On the naughty step again.
If the HST run was in BR days, wasn't there a more relaxed attitude to speed limits than today's 'more than 3mph over and it's tea and no biscuits' rules?

I would suppose rather than a more relaxed attitude perhaps a more sensible attitude in that an experienced driver could be trusted. I'd find it insulting to be treated as the London to Brighton driver was by having a bloke standing beside him with a clipboard apparently telling him/reminding him what the speed restrictions were.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,280
Should have used this music (even if it might draw unfavourable comparisons with the LGV Nord for which is was written!)

 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,530
Well, I would refer you to GWR's attempt on the Paddington to Reading run with a powerful modern EMU, a re-signalled and re-aligned line....which failed to beat a record set by an HST some years previously.

No speed limits were relaxed for the IET run, so it had to do the first couple of miles at 40 then 50mph; whereas in BR days the linespeed out of Paddington was much higher once you’d cleared the throat.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,403
I would suppose rather than a more relaxed attitude perhaps a more sensible attitude in that an experienced driver could be trusted. I'd find it insulting to be treated as the London to Brighton driver was by having a bloke standing beside him with a clipboard apparently telling him/reminding him what the speed restrictions were.

It is likely that some of the speed restrictions were relaxed for the journey in a number of places - eg 100 marginally before the usual point where 100 would apply or where 90 may be the usual limit. You wouldn't want the driver to be looking at a clipboard as his job is to look where he is going and at the usual controls so it is appropriate for him to have the adjusted limits read out to him.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,197
It is likely that some of the speed restrictions were relaxed for the journey in a number of places - eg 100 marginally before the usual point where 100 would apply or where 90 may be the usual limit. You wouldn't want the driver to be looking at a clipboard as his job is to look where he is going and at the usual controls so it is appropriate for him to have the adjusted limits read out to him.
You are correct, there were several sections where the special was allowed to go at 100 on 90 mph track. When the 319s started running the Brighton fasts in the mid 1990s, most of the section from Earlswood to Balcombe tunnel was uprated to 100 mph but I'm not sure if that still applied in 2005.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,197
Something against a faster time though would be Gatwick, as (I think) they can no longer go flat out since platform 7 was put in (going southbound anyway)

The video below shows a Brighton fast belting through platform 5 around 40 seconds in. By my calculation it's only doing around 80 mph, 90 was the norm as it's slightly downhill from Earlswood. It's still possible to run non stop through platform 5 at 90 today.

 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,333
When the 319s started running the Brighton fasts in the mid 1990s, most of the section from Earlswood to Balcombe tunnel was uprated to 100 mph
When the new Gatwick Express stock took over in 1984 the conductors regularly announced that they were up at 100mph south of Earlswood until shutting off for Gatwick.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,197
When the new Gatwick Express stock took over in 1984 the conductors regularly announced that they were up at 100mph south of Earlswood until shutting off for Gatwick.
Interesting. The sign on the down fast at Earlswood definitely said 90 mph in the early 1990s. If they left them on full power in the up direction then they probably got to 100 around Stoats Nest Junction too. I usually loitered next to the middle cabs on CIG/BIG/VEP units and the speedo was usually up to the mid 90s through Purley.
 

Warwick

Member
Joined
10 Apr 2018
Messages
353
Location
On the naughty step again.
No speed limits were relaxed for the IET run, so it had to do the first couple of miles at 40 then 50mph; whereas in BR days the linespeed out of Paddington was much higher once you’d cleared the throat.

So all of those millions spent improving the line actually didn't make any improvements, it slowed the service. If it wasn't so ironic it'd be funny.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,530
So all of those millions spent improving the line actually didn't make any improvements, it slowed the service. If it wasn't so ironic it'd be funny.

There weren’t any linespeed improvements, and the linespeed is lower because of Ladbroke Grove accident. The millions spent have brought us back to where we were, with lower line speeds and higher safety.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,333
There weren’t any linespeed improvements, and the linespeed is lower because of Ladbroke Grove accident. The millions spent have brought us back to where we were, with lower line speeds and higher safety.
What part of the Ladbroke Grove report identified that excessive speed limits were in any way a contributing factor, and/or that they should be reduced? I must have missed it.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,530
What part of the Ladbroke Grove report identified that excessive speed limits were in any way a contributing factor, and/or that they should be reduced? I must have missed it.

None, but the amended signalling required lower line speeds to make Braking Distances compliant for 3 aspect signalling.
 

rob w

Member
Joined
18 Apr 2011
Messages
17
Interesting. The sign on the down fast at Earlswood definitely said 90 mph in the early 1990s. If they left them on full power in the up direction then they probably got to 100 around Stoats Nest Junction too. I usually loitered next to the middle cabs on CIG/BIG/VEP units and the speedo was usually up to the mid 90s through Purley.
Yup only if they were kept on full power.

The 60 restriction at South Croydon used to be quite far north or the platform but seems to have been brought further south now. Had some crazy runs where we were still doing around 80 passing the platforms at South Croydon with the brakes on hard.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,197
Yup only if they were kept on full power.

The 60 restriction at South Croydon used to be quite far north or the platform but seems to have been brought further south now. Had some crazy runs where we were still doing around 80 passing the platforms at South Croydon with the brakes on hard.
So many places have got more restrictive over the years. For example, down trains at Horsham through platform 3 could accelerate back up to 75 as soon as they cleared the junction north of the station. This meant that trains could (and did) depart at full power heading south. Now it's 25 mph until you clear the pointwork south of the station, even though it's the same track layout as before and the route from platform 3 is straight. It's very strange watching trains crawl past the car park heading south.
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
So many places have got more restrictive over the years. For example, down trains at Horsham through platform 3 could accelerate back up to 75 as soon as they cleared the junction north of the station. This meant that trains could (and did) depart at full power heading south. Now it's 25 mph until you clear the pointwork south of the station, even though it's the same track layout as before and the route from platform 3 is straight. It's very strange watching trains crawl past the car park heading south.

The trackbed through the Horsham station area has recently had a lot of geological and “wet bed” issues. This may well account for any changes to lower speeds. The junctions also get a hammering with very diverse movements being accommodated, although marginally less now that TL run fixed formations which do not have different portions working in and out of sidings. (When it was the centre of Southern’s universe, a couple of years ago, the stock workings really were a sight to behold!) It’s not just the bits north of the station, even though those have caused a lot of the headaches.
 
Status
Not open for further replies.

Top