Apparently, HS1 has raised concerns about overcrowding in the event the proposed London Theme Park at Swanscombe is built.
I find this surprising would HS1 really not be able to cope with the extra patronage even at weekends? Besides, even if overcrowding was a problem couldn't more fast classic services just be reinstated to supplement HS1?
This does lead to an interesting discussion of how to increase HS1 capacity in the longer term, especially at St. Pancras where putting in extra platforms will be a near-impossible task.
I find this surprising would HS1 really not be able to cope with the extra patronage even at weekends? Besides, even if overcrowding was a problem couldn't more fast classic services just be reinstated to supplement HS1?
This does lead to an interesting discussion of how to increase HS1 capacity in the longer term, especially at St. Pancras where putting in extra platforms will be a near-impossible task.
https://www.newcivilengineer.com/la...oss-st-pancras-station-hs1-claims-06-05-2021/
London Theme Park would require major upgrade at Kings Cross St Pancras station, HS1 claims
06 May, 2021 By Rob Horgan
HS1 Ltd has joined the list of transport operators objecting to plans for a £3.5bn theme park in the Swanscombe peninsular in Kent.
In its submission to the Planning Inspectorate, HS1 Ltd concludes that the high speed rail line between London and Kent would become overwhelmed by the additional passengers using the service to access the proposed London Resorts Theme Park.
In particular, HS1 Ltd said that a major upgrade of Kings Cross St Pancras station would be required, including the construction of additional platforms.
“As a critical piece of national infrastructure and under our Concession Agreement obligations HS1 must also seek to protect its infrastructure from the potential risks that this development poses,” HS1 Ltd’s submission states.
“Therefore, for the reasons set out in this representation, HS1 objects to the application in its current form”.
It adds: “The increased demand for rail transport generated by the Project is likely to require additional platform capacity at St Pancras International station and additional stabling for up to five trains on the Railway. […]
“St Pancras International is a Grade 1 Listed station with limited room for expansion. The provision of such platform capacity will therefore be extremely hard to accommodate and a feasibility study will be required to understand whether this is possible.
“The provision of additional platform capacity at St Pancras International is likely to be of fundamental importance in terms of the Promoter achieving their predicted rail mode share.
“Despite this, St Pancras International is not included within the Development Consent Order limits and no assessment of any effects on the station has been carried out in the Environmental Statement.
“[…] As such, there can be no certainty that they can or will be delivered if the Project receives development consent. HS1 considers that the Application should not be examined further until these problems have been rectified.”
CGI of what London Resorts Theme Park may look like
Network Rail and Transport for London (TfL) have both previously raised concerns that transport infrastructure in London and Kent would be overwhelmed under the current plans for the theme park.
TfL warned that the Elizabeth line and Dartford Crossing could be “chocked” as well as the Blackwall and Silvertown tunnels.
London Resort Company Holdings (LRCH) submitted its formal planning application for the theme park in January.
The proposed London Resort comprises two theme parks covering an area of 465ha in Swancombe, Kent. If approved, work could start next year with the opening of the first theme parks in 2024. The second would follow in 2029.