SpacePhoenix
Established Member
- Joined
- 18 Mar 2014
- Messages
- 5,491
What type(s) of couplings do the existing LM fleet have?
Sadly, the northern chip on your shoulder trick wont work with me.
Hopefully, though I believe the 319/4 is (as it doesn't have First Class) to be a dedicated unit on the St Albans line, unless of course it breaks.
319 (+321) Tightlock
323 - Tightlock
350s - Dellner
Diesels are all BSI
Some of Southern's Turbostars have been converted from BSI to Dellner, and further former Scotrail examples are currently being converted, so in some cases it can be done. I've no idea as to the viability of converting an entire class of older stock however, and any electrical mods that are probably necessary.How difficult (and what's the costs like) of converting units with BSI and Tightlock couplings over to using Dellner couplings?
Also if LM/West Midlands successor franchise take on the 8 ex London over ground 172/0 they could release the 8 153's. However the only potential issue is the LO 172 don't have inter unit gangways like the LM units.
Porterbrook lease 17x323 units and 20x319 units to Northern. 37 in total. They lease 37x350/2 units to LM. The same LM that is now getting some 319s. Perhaps Northern will get all the 350/2 units and LM those 319/3s and 323s in the new franchises? Maybe?
Also if LM/West Midlands successor franchise take on the 8 ex London over ground 172/0 they could release the 8 153's. However the only potential issue is the LO 172 don't have inter unit gangways like the LM units.
Chase line electrification will see 4 DMU diagrams replaced, namely 2 diagrams of 153/170 combos & 2x 170/6 in peak (only 3 diagrams off-peak). Cascade within LM with 2x 170/6 replacing 1x 153+170/5 Hereford & 1x 153+170/5 Snow Hill, then 2x 170/5 replace 2x 150 (one on Bedford-Bletchley & one Hereford). Other 2x 170/5 replace 2x 153 diagrams, one Bedford-Bletchley & one Coventry-Nuneaton. Result, in theory, is that LM release 3x 150s and 8x 153s, the only issue being platform lengths on Bedford-Bletchley for the 170s...
I don't see why LM need the LO 172s, unless significant growth needs to be covered on the Snow Hill lines.
You are forgetting Kenilworth.....
How difficult (and what's the costs like) of converting units with BSI and Tightlock couplings over to using Dellner couplings?
If it is the intention of Porterbrook to withdraw all 17 of their Class 323 leased units from the current Northern franchise area, will they have had to issue formal notification to bodies involved with the tendering process for the new franchise, as there will be 17 less available units to use in that new franchise which will need replacing?
The way Modern Railways puts it, Porterbrook "declined to offer" the Northern 323s to the bidders for the new franchise.
So whatever went in the bids, it wasn't 323s.
In the north, anything with the Desiro name on it would go to Siemens at Ardwick.
Interesting thanks, assuming Kenilworth would need 2x 170/5 shuttling back and forth then Chase line electrification should allow LM to dispose of the 153's, without any extra stock. The 3x 150's would still be need for Bedford-Bletchley which given the platform issues mentioned makes sense, 2 would be in service and 1 spare undergoing maintenance. Would it be possible to base the fleet at Bletchley or would they still need to go to Tyseley for maintenance?
Porterbrook's 319 brochure indicates to improve acceleration the units will have to be reduced to 3 car and completely rewired. As the 319s have 20m carriages, a 3 car 319 will be around 25% shorter than a 3 car 323.
Northern can't just timetable their services at any time they want. They are heavily restricted by Virgin and that's exactly why slower accelerating trains on Stoke services could be an issue.
The 170 fiasco was the biggest one because DfT kept bleating on about no new DMUs being required when anyone with a realistic view on electrification plans knew that was rubbish.
319s on Manchester - Scotland?!
No different to Birmingham-London really...
Personally I'd like to see the 350/4s going to LM along with the remaining 323s. This would allow LM to not take on 319s as the 350/4s could replace 350/2s on longer diagrams, and the 2s going on current 321 diagrams.
319s could be refurbished for TPE and Northern, or maybe even Man Airport- Scotland services transferring to Northern to allow them all to be with one operator.
This would allow for all 323s and 350s to be with 1 operator, which should always be aimed for if possible, and also consolidates the units needed by each TOC, reducing staff training, and increasing diagramming flexibility.
No different to Birmingham-London really...
That just benefits LM both in unit quality and financially. You've just created a lot of expense for TPE and Northern in training costs alone before you've accounted into more stabling space and other items.
I always question what a refurbishment is these days. Some TOCs think it's a repaint internally, new seat covers and possibly a PIS system. 319s are not suitable for Manchester - Scotland and yes, it is different to London - Birmingham... :roll:
Funniest post I've seen in a long time.
Passengers travelling between Birmingham and London have the option of a fast Virgin Pendolino service or slower services operated by LM and Chiltern.
Manchester/Manchester Airport to Scotland passengers only have TPE offering direct services. Manchester Airport to Edinburgh takes around 90 minutes longer than Birmingham to Euston does on the slow LM service.
Maybe if the routes are similar TPE should offer £6 Advance fares for Manchester Airport to Scotland like LM offer for Manchester to Birmingham? The cheapest TPE Advance fare for Manchester Airport to Edinburgh is £20.40.
LM don't offer any advance fares for Manchester to Birmingham considering XC run the service, and from memory tickets are much more than £6.
And if you consider that post sillier than the most claiming that 3+2 seating is better on a regional service taking almost 3 hours than on a stopping commuter service I think that you clearly over estimate Manchester to Scotland services.
Oh and as you've been told before no one travels end to end on the TPE service...
Northern's training costs will be the same whatever EMUs they get, in fact they'll be slightly lower if they had 319s than 350s, based on the fact that some staff are already trained on 319s.
Northern's training costs will be the same whatever EMUs they get, in fact they'll be slightly lower if they had 319s than 350s, based on the fact that some staff are already trained on 319s.
In the long run it may also be cheaper for TPE to get 319s as there are no more 350s for them after further electrifacation but more 319s are becoming available.
Lastly I don't use either route so if both were suddenly ran by 153s I wouldn't care, meaning that I've looked at it without bias with the aim of consolidating stock, and minimising the number of services that recieve inferior stock.