While this is a long way off, I've just learned that between 2015/16, Charing X trains won't call at London Bridge (probably Thameslink services as well), while between 2016/17, no Cannon St services will call at London Bridge.

Obviously this will cause major disruption. But, does anyone know what (if any) changes will occur in services to work round this?

http://www.networkrail.co.uk/aspx/12179.aspx under timeline.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Well, Charing Cross services heading west can use the avoiding line, but I can't think how they would work it as it lies now. However, the new bridge and work to the low number bays may make it more obvious at the time.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
More details of the work sequence can be found in the attached file below, it is from the planning application.

I think we discussed it a while ago, in a thread where someone was proposing the use of Waterloo International during the works, as can be seen this isn't mentioned, it seems to have been completley dropped as a solution...
 

Attachments

  • London Bridge plans Jul 2011 - sequence.pdf
    1,015.8 KB · Views: 95

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,495
Location
DTOS A or B
Seeing as TL services are being diverted for many years, when the high level run through's are in effect could some services to cannon street, not shunt via blackfriars run round road or metropolitain reversible then around the little used metropolitain chord into cannon street. Thus still enabling a stopping call at London bridge.
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
You're not getting the platform space at Cannon Street.
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
Sorry, I see.

Not going to get the platform space at Blackfriars.

Or the capacity on the "shunt road", really, which plays an important escape route during current peak patterns.
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
Well, Charing Cross services heading west can use the avoiding line, but I can't think how they would work it as it lies now. However, the new bridge and work to the low number bays may make it more obvious at the time.

Unlikely as the avoiding lines and Platforms 5/6 will be the first to be removed to allow building of the Borough Viaduct and the Charing Cross through platforms. Presumably the Charing Cross lines will be moved over towards the Cannon Street lines on a temporary route (probably where the Thameslink platforms will eventually be) whilst the building work occurs then the reverse when the Cannon Street Platforms are constructed. Then lastly they will install the Thameslink Platforms.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
Seeing as TL services are being diverted for many years, when the high level run through's are in effect could some services to cannon street, not shunt via blackfriars run round road or metropolitain reversible then around the little used metropolitain chord into cannon street. Thus still enabling a stopping call at London bridge.

The western connection into Cannon St is removed as part of the project. There's no info that I can find on exactly when that will happen, but I don't think it can necessarily be assumed to be available throughout the period.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Thameslink trains from May 2015 until December 2017 will all be diverted via Herne Hill with an additional 8mins added to jounery times
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,964
Location
Surrey
Thameslink trains from May 2015 until December 2017 will all be diverted via Herne Hill with an additional 8mins added to jounery times

Is that 8 minutes longer journey or are they just matching the timetable with their normal lateness?
 
Status