• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

London Bridge - Track Fire Outside Station

Status
Not open for further replies.

MrB

Member
Joined
3 Jan 2016
Messages
389
Location
London
Not seen this on the forum, forgive me if I’ve missed it, but looks like a track fire outside London Bridge last night. SE reckon P 6 & 7 will be shut until Sunday due to cable damage, etc.

Revellers looking to enjoy a Friday night out in London are facing huge travel disruptions because of a lineside fire at London Bridge train station.

Video footage shows a fire burning away while shocked would-be passengers look on from the platform.

Trains to and from Charing Cross are being severely disrupted because of the fire next to the track, Southeastern Railway reported.


 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,363
Location
Yorkshire
It was a bit shambolic with no information regarding which train may be quickest to get to any particular destinations, but I guess they didn't know.

I therefore got the first available direct train to where I was going, but it turned out there would have been two quicker options. However with no other information to go on, I wasn't going to let a train go without knowing there was an alternative.

Either it wasn't mentioned that some trains were starting at New Cross or, if it was was, I certainly didn't hear or see it.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
I went through at around 2245 - trains starting from Cannon St. No PIS displays (understandably), but clear announcements about which departure was going where and an impressive throughput of trains on P1.

Made all of ten mins difference to my journey home - a very good effort in the circumstances.

== Doublepost prevention - post automatically merged: ==

Here’s another view of the fire (not my video, taken by a friend who went through a little earlier).

View attachment 029c5e3d-6c49-475c-8cd0-21e56081ea89.mov
 

OxtedL

Established Member
Associate Staff
Quizmaster
Joined
23 Mar 2011
Messages
2,631
With platforms 6&7 unavailable today, and the Thameslink core also shut, Down Charing Cross trains today are all taking the somewhat unusual route of Platform A Waterloo East, Down Snow Hill (Thameslink viaduct), Platform 3 London Bridge, Line 4 Down (Thameslink track) and then rejoining the Down Kent Fast at New Cross.
 

davews

Member
Joined
24 Apr 2021
Messages
1,011
Location
Bracknell
It was confusing this morning. At Waterloo East the PIS was saying 'delays after London Bridge due to emergency track work in the London Bridge area'. But once we got past LBG with no issues I noticed the PIS on the platforms on the other side on the following stations also said 'delays after London Bridge' as if they couldn't make their mind up where it was. Thanks for the explanation, it all makes sense and thankfully didn't delay my own journey.
 
Status
Not open for further replies.

Top