And on it goes ... we’re well into October now, has anyone noticed much happening? Those units just look like empty shellsThey seem to be finally doing the paving outside the upper concourse. The last part before those hoardings come down I think?
And on it goes ... we’re well into October now, has anyone noticed much happening? Those units just look like empty shellsThey seem to be finally doing the paving outside the upper concourse. The last part before those hoardings come down I think?
And on it goes ... we’re well into October now, has anyone noticed much happening? Those units just look like empty shells
And on it goes ... we’re well into October now, has anyone noticed much happening? Those units just look like empty shells
That isn’t the final setup. There are a few of the usual suspects outside the upper concourse gateline already, but there’s also going to be many in the east/west passageway leading to the underground, and a few other places on the west side of the main concourse that are outside the gate-line...Most of the catering seems behind the gate line too, I was working at a customer site near to London Bridge last week and tightth I'd visit the station for lunch only to realise it'd cost me a 'nowhere journey' so in the end I carried on through to the other side and went down to MoreLondon.
Oh gosh the amount of times I wish that Greggs was open for a quick breakfast or lunch. "Summer 2018" sure
That isn’t the final setup. There are a few of the usual suspects outside the upper concourse gateline already, but there’s also going to be many in the east/west passageway leading to the underground, and a few other places on the west side of the main concourse that are outside the gate-line...
As you say though, there are about 10 spots that are yet to be filled in the Western concourse (underground passage) although some of these are very small, perhaps more suitable for a takeway-style coffee bar (for example) rather than a full-sized shop. Likewise there are a few small spots on the upper concourse near thew new information point and a few more outside around the bus station, including the large two-floor building which is destined to be a casual restaurant with some outdoor tables too if the CGI of the original transformation plan is to be believed.
Last but not least there are many spots pointing out on to Tooley Street and St Thomas Street still to be filled. I assume this is where Honest Burger, McDonalds and the rumoured Wetherspoons will be finding their homes.
Lower Concourse:
Caffe Nero (on the outside face of the station building on St Thomas St)
Krispy Kreme (near the ticket office and TVMs)
Pret
M&S (in the arcade)
Caffe Nero (on the outside face of the station building on St Thomas St)
The newsagenty place near the Southeastern platforms
I was under the impression that more than one restaurant/pub type of venue would occupy said two-storey structure on one side of the Upper Concourse. One of these could be Wetherspoons or similar - not sure.
Can’t comment for how much, if anything, may be positioned on the Upper Concourse itself, away from the clearly-defined outlets each side of it.
I can’t think of one. And you’re right, it’s frickin freezing in winter, the wind whistles through and the narrow and high canopies allow snow to fall on platform surfacesIs there a waiting room anywhere at London Bridge? A couple of days ago I had a 15 minute wait for a train there late in the evening, and it was pretty cold, even down on the main concourse. I dread to think what it'll be like in the middle of winter there if there isn't an enclosed waiting room.
Currently-available food and drink outlets outside the gateline are roughly as follows:
Outside the station entirely:
St Thomas side:
Sainsbury’s within the hospital grounds
Coffee cart in the mornings near the Shard escalators
Shard eateries
Tooley St side:
Pret/Starbucks etc. in the Hays Galleria complex
Eat/M&S/restaurant chains in the More London complex
Tesco / H+H / Costa over the road near the PwC offices
Had a look around today.
- James Shoe Care - high end shoe repair and dry cleaning at its other locations
A useful establishment to have in third-rail territory.
I changed trains at London Bridge on Monday - travelling into Waterloo so then crossed to Waterloo East & change at London Bridge onto the Thameslink Cambridge train.
There seems to be only one lift for each island platform. The lift was out of order on the platform I arrived on so had to take my luggage down the long escalator. There was another passenger with a pushchair and suitcase who was stuck on the platform as obviously she could not take these onto the escalator.
For a major station that has been rebuilt I would have expected there to be 2 lifts for each platform.
The problem is not so much in having one lift per se, it's the frequency and duration of the breakdowns. They really do not seem particularly reliable and/or they need to increase the service levels on their lift contractor.
The problem is not so much in having one lift per se, it's the frequency and duration of the breakdowns. They really do not seem particularly reliable and/or they need to increase the service levels on their lift contractor.
What about Finsbury parkHaving watched a team of about 12 people work on the concrete paving outside the shard entrance for nearly 6 months now I’m convinced this is something of a scam
I’ve seen bigger areas than this be paved in a week and have no idea what these people are doing all day long
Perhaps they are relaying the same stones multiple times as there doesn’t seem to be any other possible explanation as to how little could change on a week to week basis - the whole area has looked 95% done for at least 3 months now.
Having watched a team of about 12 people work on the concrete paving outside the shard entrance for nearly 6 months now I’m convinced this is something of a scam
I’ve seen bigger areas than this be paved in a week and have no idea what these people are doing all day long
Perhaps they are relaying the same stones multiple times as there doesn’t seem to be any other possible explanation as to how little could change on a week to week basis - the whole area has looked 95% done for at least 3 months now.