What's the conflict at North Kent?
Ahh right, so not conflicts with other Thameslink trains. Does seem like not sending them via Greenwich would make sense, but I'm guessing that will be an "innovation" after 6 months when the whole thing is falling apart every day.Thameslink trains to and from the Greenwich line have to cross in front of opposite direction Cannon Street services on the flat.
Ahh right, so not conflicts with other Thameslink trains. Does seem like not sending them via Greenwich would make sense, but I'm guessing that will be an "innovation" after 6 months when the whole thing is falling apart every day.
Thameslink trains to Greenwich line have to cross in front of up Cannon Street services on the flat.
It isn’t really a London Bridge construction issue, it’s covered at length in one of the many Thameslink timetable threads somewhere, but it’s as FOH just mentioned. Having originally decided to share the 24 tph Thameslink as 8 trains via Elephant and 16 via London Bridge, there was then seen to be a bottleneck further down the ‘Southern’ network at the lower end of the Sydenham corridor, ie Windmill Bridge junctions, where the lines from Victoria merge north of East Croydon.Why is there a need for north Kent trains to run through the core?
I think they didn’t want to go there at all but needed these trains to go through London Bridge but not Windmill Jn and needed an 8 car platform to reverse at. My guess is Crystal Palace would’ve been the choice had it had longer bays.
...and the ELL seems to have first dibs on additional paths anyway, with another 4 tph planned by TfL already appearing in route studies etc.That, and the Slows are also increasingly full of East London Line trains nowadays.
It isn’t really a London Bridge construction issue, it’s covered at length in one of the many Thameslink timetable threads somewhere, but it’s as FOH just mentioned. Having originally decided to share the 24 tph Thameslink as 8 trains via Elephant and 16 via London Bridge, there was then seen to be a bottleneck further down the ‘Southern’ network at the lower end of the Sydenham corridor, ie Windmill Bridge junctions, where the lines from Victoria merge north of East Croydon.
So in an attempt to reduce that 16 tph they decided to go back to an earlier plan, and run some services onto the Southeastern part of the network. The infrastructure had always allowed for this possibility, it is why the Bermondsey Diveunder has four tracks.
Having a major station like London Bridge, right outside a major terminus is operationally bit of a nightmare. Throw in a complicated, tight throat, and a slow, very tight junction. Then this is the result.
If trains are a couple of minutes late, then they start to loose their slots over the junction. Towards the evening peak a lot of empties are pumped up towards Cannon St. Even in the timetable, trains are essentially booked to wait. once that que starts building, it soon builds up quickly.
Yes, it was thought about. They went into detail in the London and SE RUS (2011) about the intended reduction in the number of services to Cannon St following the Thameslink changes.I wonder whether any thought was given to redesigning the timetable so slightly fewer trains an hour go to Cannon Street? Obviously, that would require somewhere else to receive more trains. Since Charing Cross is probably full, that would presumably mean either more trains terminating at London Bridge (building an extra terminating platform?) or more Thameslink trains?
At that time the intention was that Cannon St terminating trains would reduce from 25 to 22 per hour. The grand total number of services on the approaches to London Bridge was to increase from 84 to 88 tph. Charing Cross basically stayed the same at 29/28 tph.
I know there are now only 2 terminating platforms at London Blackfriars today, rather than the 3 which existed before the remodelling of the station. However, they do not appear to be well utilised.
Platform 3 and 4 at London Blackfriars now appear to service 8-car units to Rochester and Ashford. Yet following the 1729 departure from Platform 3, there is an hour and a half gap to the next scheduled departure.
Given capacity at Cannon St and Charing Cross is so limited, could not more services use the bay platforms at London Blackfriars ?
Even a half hour interval should permit an extra 4 departures between 1730 and 1900.
Wait till after the December TT change and you'll find they are running at 8tph into the terminating platforms...I know there are now only 2 terminating platforms at London Blackfriars today, rather than the 3 which existed before the remodelling of the station. However, they do not appear to be well utilised.
Platform 3 and 4 at London Blackfriars now appear to service 8-car units to Rochester and Ashford. Yet following the 1729 departure from Platform 3, there is an hour and a half gap to the next scheduled departure.
Given capacity at Cannon St and Charing Cross is so limited, could not more services use the bay platforms at London Blackfriars ?
Even a half hour interval should permit an extra 4 departures between 1730 and 1900.
Wait till after the December TT change and you'll find they are running at 8tph into the terminating platforms...
Lots of the Thameslink / railplan 2020 related changes are taking place over quite along time (till Dec '19 though mostly in place post Dec '18 TT change) and SN /SE don't have the stock until lots more 700s are in service.
Having helped to kick start discussion of timetables again myself, with the stuff about London and SE RUS etc, can I suggest to everyone that we ease off about future timetables into Blackfriars, as this thread is supposed to be about London Bridge construction?
We could end up completely sidetracked...
NKE should have been rebuilt when it was surrounded by semi derelict industrial areas, now full of new build housing. Huge opportunity lost.Thameslink trains to Greenwich line have to cross in front of up Cannon Street services on the flat.