Amazing how long a route so short you could walk it in 15min has been closed three -four years

Anyone having to endure the diversion on a daily basis should be awarded a medal
It's been found on a number of previous projects that the walk is slowed considerably if you stop to build a new station, viaduct and massive flyover on the way. It does speed up subsequent trips quite considerably though.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,281
Just looking at RTT for the day, it looks at first glance as if the earlier problem of some peak Charing Cross trains non-stopping London Bridge "went away". Does anyone know if this resulted from a specific timetable change, or was it just some sort of gradual ramp up to the eventual full service after all.

This subject received quite a bit of discussion a few months ago, and then went quiet...
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
Just looking at RTT for the day, it looks at first glance as if the earlier problem of some peak Charing Cross trains non-stopping London Bridge "went away". Does anyone know if this resulted from a specific timetable change, or was it just some sort of gradual ramp up to the eventual full service after all.

This subject received quite a bit of discussion a few months ago, and then went quiet...

I noticed that too. I assumed it was part of some sort of rationalisation connected to the timetable changes.
Charing Cross-bound skippers have gone away, but there are a couple of Cannon Street-biund skippers in the evening peak, against the rush:

http://www.realtimetrains.co.uk/train/W00628/2018/01/10/advanced
http://www.realtimetrains.co.uk/train/W02785/2018/01/10/advanced
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,961
Location
Airedale
For Cannon Street services, it seems the platform allocation for off peak is to have 1 go 'down' and 2&3 go 'up' (so breaking the pattern for the evening peak when 1&2 are 'down'). I am fairly sure this used to be the other way around in the old station (1 was 'up' and 2&3 was 'down' for most of the day except the morning peak), but I guess this makes more sense given 2&3 is the island now, rather than 1&2.

The old 1 was never an Up platform, for rather obvious reasons - it wasn't even signalled reversibly. I think you mean 3 Up, 1 and 2 Down?
 

telstarbox

Established Member
Joined
23 Jul 2010
Messages
6,378
Location
Wennington Crossovers
Have Southeastern altered some allocations now that (nearly) all their trains are stopping at London Bridge? I ask as my regular train used to be 10 coaches (2 x Class 376) and has been 8 coaches for the last couple of days, which would make sense as passengers going to London Bridge can spread over the Cannon Street services too.
 

talldave

Established Member
Joined
24 Jan 2013
Messages
2,682
Have Southeastern altered some allocations now that (nearly) all their trains are stopping at London Bridge? I ask as my regular train used to be 10 coaches (2 x Class 376) and has been 8 coaches for the last couple of days, which would make sense as passengers going to London Bridge can spread over the Cannon Street services too.
Yes they have.
 

FOH

Member
Joined
17 Oct 2013
Messages
768
It's all very strange. The boards for P11 and P15 are displaying correct information. All others are either blank or covered over
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
It's all very strange. The boards for P11 and P15 are displaying correct information. All others are either blank or covered over

Last night, the boards for P6/7 and P8/9 at the bottom of the West staircases were working, but the ones at the bottom of the East staircases were not.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
7uyXBIJ.png


Leaks today. I think this is below the new building outside the Shard concourse, or perhaps underneath the bus station, rather than the tracks, correct?
 

Chrisgr31

Established Member
Joined
2 Aug 2011
Messages
1,704
I think its underneath the bus station. They have recently done some patching of the tarmac in the bus station. They are doing more works up there though on preparing the last lane of the bus station. Does seem to be a problem with the waterproofing in that area.
 

FOH

Member
Joined
17 Oct 2013
Messages
768
Typical Southern ineptitude on display this evening. 1906 just remained On Time until it just disappeared off the boards. Ask the only visible staff there are what's going on and get a shrug of the shoulders "no radio". Why can a brand new signalling system not allow the boards to show relevant information?
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,224
Presumably lots of different drivers getting to drive that train to do the route knowledge though?

I was under the impression that it was the driver instructors/trainer learning the route at the moment, as so they in turn can start the huge task of teaching all the various drivers from various depots in GTR land that are going to work through the core.
 

James H

Established Member
Joined
25 Jun 2014
Messages
1,544
On Sunday due to engineering works, Southeastern trains to Robertsbridge were leaving from platform 10.

For some reason these trains couldn't be displayed on the normal CIS screens on the upper concourse, which was rather unhelpful.
 

FOH

Member
Joined
17 Oct 2013
Messages
768
As someone who relies on lifts as far as I’m concerned 1 lift isn’t fine because when that one lift stops working I’m stuck.
P8/9 lift was out of action today. No signs giving any estimate to fix it.
 

John1975

Member
Joined
21 Aug 2013
Messages
115
All this week run via London Bridge

2T23 08.54 BDM - TBD
1T27 11.10 BDM - BTN
1T31 12.10 BDM - BTN
1T33 12.40 BDM - BTN
2T41 13.24 BDM - TBD
1T39 14.10 BDM - BTN
2T45 14.24 BDM - TBD
2T47 14.54 BDM - TBD
2T49 15.24 BDM - TBD
2T53 16.40 BDM - TBD
2T59 18.00 BDM - GTW
1T55 18.10 BDM - BTN
1T63 20.10 BDM - BTN

1T22 10.05 BTN - BDM
2T36 12.29 TBD - BDM
1T34 13.05 BTN - BDM
1T36 13.35 BTN - BDM
1T38 14.05 BTN - BDM
1T40 14.35 BTN - BDM
1T88 15.05 BTN - BDM
1T90 15.35 BTN - BDM
1T94 16.02 BTN - BDM
1T84 18.07 TBD - BDM
2T62 19.43 TBD - BDM
1T66 21.05 BTN - BDM
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
That tweet doesn't seem to exist anymore....

Simon

Hah. It was the London Bridge team saying they were expecting TL services to be calling at Platform 4/5 in passenger service Monday onwards. I wonder if TPTB were hoping for a quieter launch than that, or whether it's not actually been confirmed for sure yet.
 
Last edited:

John1975

Member
Joined
21 Aug 2013
Messages
115
From Monday, TL passenger services will stop at London Bridge, but it will only be an operational stop.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
That will really annoy people. Sitting in a station with the doors locked! Reminds me of when I travelled 50 years ago through West and East Berlin...
 