telstarbox
Established Member
I'm going to cycle to work tomorrow just in case 
On a different note, has anyone else had any experience of SouthEastern services during the last few days while London Bridge was closed to SouthEastern so all lines were running a heavily reduced service to Victoria?
I was on the 17:55 Woolwich line service from Victoria on the 27th. This was a line that normally handles 8tph, but last week was running only half-hourly. It struck me that, despite this, and that it was a peak hour service that the train was very lightly loaded. I know trains will have generally been less busy last week, but even so, that suggests to me that all SouthEasterns warnings over the last few months about the closure, and telling people to make alternative plans must've had a big impact.
It’s all going relatively well so far!
Some delays right now. Obstruction on the track. Due to the works? Station looks great.
When will London Bridge to Blackfriars be possible on Thameslink again? I thought it was supposed to be the start of this this year but it clearly isn't. I am getting fed up about this now. I am very very angry actually.
Please could someone tell me when? I really do prefer it to the Northern Line.
When will London Bridge to Blackfriars be possible on Thameslink again? I thought it was supposed to be the start of this this year but it clearly isn't. I am getting fed up about this now. I am very very angry actually.
Please could someone tell me when? I really do prefer it to the Northern Line.
Excellent. Thank you. It looks like it is only (another) 5 months to to!May 2018 timetable change is the official passenger opening of Thameslink trains running between London Bridge and Blackfriars anything before then would be a bonus.
Because when you are in a rage you don't have time or patience and especially don't like reading information, you want instant answers and you want them now. I have been looking forward to this for so long and it has been a huge damper on the start of my 2018.
The re-signalling of the SE side of the London Bridge box area finishes in mid 2019Yes, looks good.
Though on the downside I was a bit put out to discover that it only stays open for eleven days before yet another full shutdown of the southeastern side, and the same again the following weekend, when will it end ?
The re-signalling of the SE side of the London Bridge box area finishes in mid 2019
Because when you are in a rage you don't have time or patience and especially don't like reading information, you want instant answers and you want them now. I have been looking forward to this for so long and it has been a huge damper on the start of my 2018.
I have been reading a few relevant threads but apparently not the ones with the useful information I have been looking for. I am happy that I now have what I need though.
There has been some speculation in this thread, and others, that once GTR starts routing Blackfriars services through the London Bridge route (which will happen over the next few weeks and months, as drivers are trained, before the May timetable change) there may be scope to make some unadvertised passenger calls at London Bridge, but this is purely speculative and not confirmed by any actual source.
They could well decide to have the trains wait at junctions instead of the new platforms, although if they do this, there could be as much as 4tph or so running through to Blackfriars, but it's an 'if' not a 'when'.
I was under the impression that from the start of this year all services from London Bridge would resume exactly as they used to. With Cannon Street services now able to stop again, I assumed that Thameslink trains would also stop, seeing as the work has been completed.With all due respect your anger seems unjustified and could have been entirely avoided by simply doing a little research. Unless I'm missing something it was never promised that the full TL service would go live in Jan 2018. Being angry about the absence of something that was never intended to happen in the first place is completely irrational.
It just strikes me as rather odd that someone who cares enough about TL services to be angry hasn’t made it their business to keep abreast of when the timetable changes take place.
I do my best to keep up myself updated. Searching for "Thameslink London Bridge Blackfriars" and reading about the upgrade work coming to an end got me all excited. I even asked in the ticket office just before Christmas and was told that Thameslink trains would resume in January - I am disappointed to have been lied to.With all due respect your anger seems unjustified and could have been entirely avoided by simply doing a little research. Unless I'm missing something it was never promised that the full TL service would go live in Jan 2018. Being angry about the absence of something that was never intended to happen in the first place is completely irrational.
It just strikes me as rather odd that someone who cares enough about TL services to be angry hasn’t made it their business to keep abreast of when the timetable changes take place.
Ah, this must have caused the confusion. Open and open for use are two different things. I will calm down for now and wait in anticipation for May.As things stand at the moment the TL platforms are open for traffic but not yet fully commissioned for passenger use. Therefore at least initially any such “unadvertised calls” will not be passenger calls and doors will not be released. They are unadvertised because there is a choice of routes these services could take between Blackfriars and East Croydon.
I do my best to keep up myself updated. Searching for "Thameslink London Bridge Blackfriars" and reading about the upgrade work coming to an end got me all excited. I even asked in the ticket office just before Christmas and was told that Thameslink trains would resume in January - I am disappointed to have been lied to.
Reading all these posts from various people both inside and outside the actual railway industry and companies involved, the impression I get is that GTR could have run the 4tph from January 2nd if they'd pushed for it, and perhaps at one point the intention was to do so, but they haven't, either because of a risk management decision, or because they simply didn't have their sh** together early enough with driver training and other factors. That's my guess, anyhow.