Will Waterloo East go to 2 up 2 down from the current alternating arrangement as per new London Bridge platforms? That is, will platforms B and C switch directions if they haven't already?
Aside from the other replies, what would be the benefit even if you could plausibly do it? If Waterloo (East) had two island platforms, then the benefit to passengers would be obvious: All trains in each direction would depart from the same island, so it would be easier for passengers to decide which platform to go to. But that isn't the arrangement at Waterloo (East). With the actual current platform arrangement, even if you did have an u/u/d/d system, the middle island would still serve both up and down trains, so things wouldn't be any easier for passengers.
You could argue that u/u/d/d removes the conflicting move between Waterloo and London Bridge, but in practice that wouldn't be fewer conflicting moves: It would just be shifting the conflicts so that they all occur between Waterloo and Charing Cross, instead of some of them east of Waterloo. So again - as far as I can see - no benefit.
Yes, hopefully it's an optical illusion. I'm still a bit nervous though, especially as those platforms will be a major drop-off / pick-up point for people travelling to London Bridge itself, and not just passing through.
Saw your question the other day but didn't have access to my PC at the time. The planning drawings I've downloaded show the P4/5 island is identical in width to the other three islands along the main part of the length, i.e. where the lifts and escalators are. P4/5 is a bit narrower at the very furthest country end, similar to P2/3, but is actually wider ('squarer') than the other three at the London end.
I've attached a screenshot from the planning application that shows what you mean
They do indeed look about the same width.
Looking at that diagram, I can't help noticing the differences in lengths in the through platforms. Platform 1 appears to be considerably longer than platforms 2/3, which seems odd as all those platforms will serve the same trains (the Cannon Street ones). Anyone know the thinking there? Then platforms 4/5 are slightly longer than 2/3 (are Thameslink trains expected to be longer than SouthEastern ones?), while the four CHX platforms look (roughly) the same length as 2/3, which would make sense.
Thank you both. That is reassuring. I think I was seeing the easternmost part and extrapolating from there.
P1 ends up being longer because of the positioning of the stairs at the platform ends.
update today (thurs) - the p15 cattle pen has been removed !
The automatic computer generated announcements need to stop they are awful. Why recorded ones by humans can't be used instead is baffling.
An annoying feature of the platform displays, noticeable when waiting for a service back to Waterloo East in the afternoon, is that when the next train is showing a non-stopping service, the second and third train displays go blank, so you have no idea if they are delayed or cancelled until the first train has passed.
I agree. The one I seem to hear the most (way too frequently) is something to the effect of "Please use the lifts instead of escalators to reach the platforms ... ... ... if you have heavy or bulky luggage."
And they play it every minute or two. It's rubbish.
That's what websites like Real Time Trains are useful for. Southeastern's information displays have been absolutely useless, displaying blatantly incorrect information, for as long as I can remember.
One thing I've noticed about RTT is that when an incoming train to CHX arrives at a different platform than was planned (so the new platform number shows in red), the platform number of the corresponding outgoing service doesn't update (and go red) until some time later, usually just before the outgoing service leaves. I'd assume that being "Realtime" it would update simultaneously?
I've also noticed that recently SE's Live Trains site doesn't always provide platform numbers at CHX.
I agree. The one I seem to hear the most (way too frequently) is something to the effect of "Please use the lifts instead of escalators to reach the platforms ... ... ... if you have heavy or bulky luggage."
And they play it every minute or two. It's rubbish.
A few screenshots of videos showing progress on P1-5
It is real time, based on the signaller inputting the train's headcode into the panel. It seems like sometimes they wait until they're ready to clear the signals before they do that.
ThanksIt is real time, based on the signaller inputting the train's headcode into the panel. It seems like sometimes they wait until they're ready to clear the signals before they do that.
Is he sitting there to rescue trapped pax? Or stop them using it? Or this one of the lifts still unfinished?
It's weird, I have no idea why they've done this. They seem to have made a late decision to change the lift on P11/12 from passenger use to staff use only, as it's shown as a passenger lift on the planning application. The shaft goes all the way down to concourse level but currently is only set up to only stop at the upper floor of the staff building. At concourse level there's just frosted glass where the doors would be.
It seems totally out of place to have a huge accessible lift with 'Staff Only' above it, surely if they were really concerned about drivers getting to the break rooms quickly, they could have installed another set of stairs like on 13/14 (which aren't shown on the planning application btw), or surely there'd be a system available where a driver could use a key or contactless badge to let the lift make a special stop at the staff only floor, like countless other systems found the world over in offices and apartment buildings. Right now though, there is apparently no lock at all on the lift, electronic or manual, so they have a staff members sat outside on a chair all day in shifts.
Does anyone know why this change happened? I have never actually seen a driver (or any other staff) using the staff lift.
I did wonder if it might be a temporary arrangement and this lift might get switched to being a passenger lift when they've finished the additional lifts down to the Western Concourse from the 'services spine', but who knows. The lift car that's been installed in the shaft only has front doors, whereas the concourse level would need doors on both sides, so they'd have to fix that. I'd put my money on it being some driver H&S request from Southern that the station was forced to make.