What's happening with platform 1 at London Bridge, which has been roped off for months?
Is it simply that a reduced timetable is still operating as a result of COVID-19 and one up platform and one down platform can accommodate the Cannon Street traffic? Or is something wrong with it?
Is it simply that a reduced timetable is still operating as a result of COVID-19 and one up platform and one down platform can accommodate the Cannon Street traffic? Or is something wrong with it?