This summer I am planning a return to Ireland, and during my trip planning I noticed that ATW have LHCS services from Manchester to Holyhead. A little more research revealed it to be 4 x Mark 3 coaches hauled by a '67 with a DVT. Is that correct? I note that 1D34 arrives ECS at 09:48 and departs at 09:50(!) - will they really be able to rock 'n roll so quickly after arriving ECS? That super-quick turnaround worries me greatly, as I have never loaded a bicycle in a DVT. What is the procedure for doing so? Presumably the guard will open the DVT door, but what happens next? Does he/she take my bicycle and place it in the DVT, or am I expected to place it into the DVT? If the latter, do I walk through the gangway to the coaches, or do I step out of the DVT and re-board via the nearest slam door? As I'm not a fan of the Manchester central stations, I'm thinking of bailing out at Wigan and cycling down to Newton-le-Willows. Will that make it easier or harder to load compared with Piccadilly? Although I've been on many LHCS railtours in my time, I've never needed to use a DVT (if the rake had one), hence my noobness. Can you tell that I live on the west coast? 
P.S. Are there any bars on the dropdown windows? Thanks!

P.S. Are there any bars on the dropdown windows? Thanks!
Last edited: