hexagon789
Veteran Member
Which was the successor to the pre-war LNER's long-standing Leeds/Glasgow train.Back in the day the morning Leeds to Edinburgh train was named "The North Briton". I remember using it in the early seventies.
Which was the successor to the pre-war LNER's long-standing Leeds/Glasgow train.Back in the day the morning Leeds to Edinburgh train was named "The North Briton". I remember using it in the early seventies.
Not sure but I vaguely remember the "Thames-Clyde Express" from St. Pancras to Glasgow Central via Leeds and Settle.Which was the successor to the pre-war LNER's long-standing Leeds/Glasgow train.
That was the LMS working though. This was one was the LNER equivalent and left Leeds around 8.55am typically reaching Glasgow via York, Newcastle and Edinburgh at about 3pm with the same carriage set then returning to Leeds an hour later at 4pm.Not sure but I vaguely remember the "Thames-Clyde Express" from St. Pancras to Glasgow Central via Leeds and Settle.
LNER providing the service would allow a small follow on 80x order for when the latest keep Newton Aycliffe open order for the open access operators runs out.
My logic for using LNER is that CrossCountry should be terminating much further south than Edinburgh. Doubling the voyagers through the core section should be the priority.
Leeds is an obvious terminating point for the via Leeds. Whilst the via Doncaster could continue to Newcastle, York termination has much to support it.
That would save units, increase capacity on the core and ensure that there was a justified additional small 80x order in the coming years.
Why would LNER procure more Hitachi stock when their latest rolling stock order is for CAF Class 897?LNER providing the service would allow a small follow on 80x order for when the latest keep Newton Aycliffe open order for the open access operators runs out.
That would save units, increase capacity on the core and ensure that there was a justified additional small 80x order in the coming years.
Granted. My thinking is that at some point we're going have to do odd things to squeeze a quart out of a pint pot; more trains per hour from York, but one of them takes a minor detour?It is just like the dead end of Manchester services, or indeed London ones.
That really slows down journeys between York and stations south of Doncaster, which is what the London to York services are about.
They won't. I think the most LNER drivers would do is north as far as Micklefield, then via Hambleton to Doncaster (and vice versa) for any issues between Leeds and Doncaster. It's probably going because it used to be an HST service, which have left Neville Hill. The Azumas don't bed there for the night, I think Doncaster is the nearest for them. So, start back from Kings Cross with a set coming off Bounds Green.Out of interest. Why is the direct Leeds to Aberdeen being removed?
How would Leeds crew retain route knowledge from Leeds - York - Newcastle (which I assumed was the biggest driver for retaining this service)?
Not really. You'd need somewhere to stick the terminating unit. The paths at the moment don't help either; xx08 northbound, xx11 southbound. That will change from December 2025, but I doubt there's time to clean and turn around the set at Leeds. If they both terminated at York, however, it could come in as a via Leeds and head out as a via Doncaster... An additional question would be around flows from Birmingham and Derby to York and Newcastle - are they large enough to warrant keeping services running as far as Newcastle (where there is also no space)?Leeds is an obvious terminating point for the via Leeds. Whilst the via Doncaster could continue to Newcastle, York termination has much to support it.
Surely reintroducing the Liverpool to Edinburgh service would be the headlining service that can make use of new electrification enabling hundreds of miles of continuous electrification, even better if it’s worked by a brand new 7 or 8 carriage train.Much as I appreciate the complexities of change in the present railway with its inflexible TOC and rolling stock arrangements, it hardly makes a case for electrification (or other railway investment) when the industry cannot see its way to make good use of such a long wired route as Leeds - Edinburgh.
WAO
Not minor though, and is York to Doncaster actually congested infrastructure? York to Doncaster is about 25 minutes direct and about an hour via Leeds once dwells at Leeds and Wakefield are taken into account.more trains per hour from York, but one of them takes a minor detour?
Not minor though, and is York to Doncaster actually congested infrastructure? York to Doncaster is about 25 minutes direct and about an hour via Leeds once dwells at Leeds and Wakefield are taken into account.
Not much use to a Yorkshireman.Surely reintroducing the Liverpool to Edinburgh service would be the headlining service that can make use of new electrification enabling hundreds of miles of continuous electrification, even better if it’s worked by a brand new 7 or 8 carriage train.
Isn’t this proposing reintroduction of a through TPE Liverpool to Edinburgh service via Leeds, York and Newcastle? The hoped for regular service never really got started and was reduced to a separate 2 hourly service between Newcastle and Edinburgh?Not much use to a Yorkshireman.
IIRC, an EMU service from Lancashire (albeit Manchester!) to Scotland started as soon as the wires reached Parkside from Deansgate.
There may be a case for levying track access charges for say 8 cars even if only two are operated, where there are pathing limits.
WAO
Isn’t this proposing reintroduction of a through TPE Liverpool to Edinburgh service via Leeds, York and Newcastle? The hoped for regular service never really got started and was reduced to a separate 2 hourly service between Newcastle and Edinburgh?
Azumas definitely stable overnight at Neville Hill.It's probably going because it used to be an HST service, which have left Neville Hill. The Azumas don't bed there for the night, I think Doncaster is the nearest for them.
I stand corrected; I thought it was just the 225 sets (plus Northern’s units).Azumas definitely stable overnight at Neville Hill.
That electric service was introduced, indeed routed via Wigan instead of via Bolton as a matter of urgency to displace 185s to work the new Liverpool to Newcastle via Manchester Victoria service, with the Manchester Airport to Newcastle service being cut back to York before being re-extended to Newcastle.Not much use to a Yorkshireman.
IIRC, an EMU service from Lancashire (albeit Manchester!) to Scotland started as soon as the wires reached Parkside from Deansgate.
Manchester to York is slated to be possible in 63-66 minutes. That would give a Manchester Victoria to Edinburgh via ECML travel time of around 3 hours 40 minutes. Yes that’s certainly not as good as the 3 hours 10 minutes of the WCML service but it provides alternatives in the event of disruption and much more capacity. I doubt that non-time conscious travellers would mind the extra travel time if the price of an AP ticket was lower than via the WCML.You could be at Carlisle quicker than at York, going to Scotland that way.
WAO
The phrase “a bit of a tourism trade” in relation to York is doing a lot of heavy lifting there!It's a tiny city in comparison to most places with a bit of a tourism trade
Of course, a lot of that would have been LNER HSTs, which were replaced with electric or bimode 80x. As you say TPE will resolve itself once the power upgrade is finally complete. XC would ideally have bimodes, but I think the best we can hope for is that, in addition to the 12 ex-avanti voyagers they will get the 8 remaining ex-avanti voyagers as well.The original point of this discussion was that more Leeds York and onwards passenger trains should be electrically hauled. The 2009 RUS (p26) pointed out that North of York more than 50% of passenger tonnage was Diesel hauled. TPE should solve itself eventually but when XC is struggling with capacity, there is surely a prima facie case for splitting XC around Leeds (or even Sheffield with bi-modes) and strengthening the Diesel services to the South. Yes there all sorts of problems with stock choice, station congestion, TOC boundaries etc but this must be the way to go.
I am a fan of Voyagers, having had excellent experience over 15 years. They just need more of them (and better toilet extract!).
WAO
there is surely a prima facie case for splitting XC around Leeds (or even Sheffield with bi-modes) and strengthening the Diesel services to the South. Yes there all sorts of problems with stock choice, station congestion, TOC boundaries etc but this must be the way to go.
Maybe but up until the Eureka timetable of 2011 it started from Glasgow at 8pm and terminated at York on Mondays to Thursdays and ran to King's Cross on Friday though stopped doing so in 2002 when terminated at I think York or Doncaster whilst the 1818 ran Aberdeen to Edinburgh before in 2011 once again becoming the Aberdeen to Leeds train!Always nice when someone types before checking the timetable.
There has been a northbound morning service with a balancing southbound service for many decades now…
So too is "tiny city": depending on source/geographic definition it's population is between 140,000 and a shade over 200,000. Not large but absolutely not tiny. And in railway terms it has a substantial hinterland as post Beeching plenty of travellers do indeed use it as a railhead in the way Beeching had expected.The phrase “a bit of a tourism trade” in relation to York is doing a lot of heavy lifting there!
So too is "tiny city": depending on source/geographic definition it's population is between 140,000 and a shade over 200,000. Not large but absolutely not tiny. And in railway terms it has a substantial hinterland as post Beeching plenty of travellers do indeed use it as a railhead in the way Beeching had expected.
As with Swindon, I think York's strong London service is due to its place on the network as much as to do with demand to it. Without a faster route between Sheffield and Leeds, a Liverpool Lime Street High Level – Prestatyn tunnel, reinstatement of a north-south route through Nottingham or massive works around Castlefield, those cities aren't going to have the same level of demand for through services as York.Compared to the other cities in the North it is though; Leeds, Sheffield, Nottingham, Liverpool and Manchester don't have more than 3 TPH from London and they're mostly areas of 1 million+
No arguments about tourism but it flows in the opposite direction and again most the places above will have as much, if not more anyway.
York has a good service, arguably the best service in the country outside of the major cities. It doesn't need more trains to London at the cost of other links like Sheffield to Edinburgh, as it's all the OP is doing pretty much because Crosscountry has the wrong trains.
It’s a shame that this train is going. Myself and others used it to get Edinburgh from Leeds for a decent time. It was well used by folk in financial and oil industry.One train at 0710, which is really only for stock movement, is pretty meaningless. It’s also going with the 2025 timetable recast
Absolutely the case, you can't argue with geography!As with Swindon, I think York's strong London service is due to its place on the network as much as to do with demand to it. Without a faster route between Sheffield and Leeds, a Liverpool Lime Street High Level – Prestatyn tunnel, reinstatement of a north-south route through Nottingham or massive works around Castlefield, those cities aren't going to have the same level of demand for through services as York.
York lies roughly half way between London and Edinburgh. Plenty of foreign tourists visit all 3 cities as part of a single holiday. To say the tourist flow is all in one direction is plain wrong.No arguments about tourism but it flows in the opposite direction and again most the places above will have as much, if not more anyway.