Based on the LNER fare increase trial thread, it is clear that LNER is in need of more capacity, especially on the Edinburgh route.
I would suggest a way to provide that extra capacity would be to make some changes to the 897 order, in particular, go for 12-car units instead of 10-car. Assuming cars are the same length as in the 397s, that would give a train of 2x24m end cars + 10x 23.3m intermediate cars, for a total length 281m. This fits in platforms 0-4 and 6-8 at King's cross, and certain platforms at Edinburgh. These trains would be 47m longer than a 9-car azuma so should be used on the busiest Edinburgh diagrams to increase capacity. With ten units, that would likely enable a bit less than half the diagrams to go to these longer trains.
This would also help to reduce per-seat subsidy, as it would have the same staffing requirements* (1x driver, 1x guard, 1x catering staff), but more passengers to pay for them.
Further capacity increases on the route would likely be necessary, and Lumo should be enabled to run 10-car trains to help with that. In the long term, what we need is HS2.
*I'm excluding whatever staff is used for First Class, as they should be entirely paid for by the premium charged for First Class tickets.
I would suggest a way to provide that extra capacity would be to make some changes to the 897 order, in particular, go for 12-car units instead of 10-car. Assuming cars are the same length as in the 397s, that would give a train of 2x24m end cars + 10x 23.3m intermediate cars, for a total length 281m. This fits in platforms 0-4 and 6-8 at King's cross, and certain platforms at Edinburgh. These trains would be 47m longer than a 9-car azuma so should be used on the busiest Edinburgh diagrams to increase capacity. With ten units, that would likely enable a bit less than half the diagrams to go to these longer trains.
This would also help to reduce per-seat subsidy, as it would have the same staffing requirements* (1x driver, 1x guard, 1x catering staff), but more passengers to pay for them.
Further capacity increases on the route would likely be necessary, and Lumo should be enabled to run 10-car trains to help with that. In the long term, what we need is HS2.
*I'm excluding whatever staff is used for First Class, as they should be entirely paid for by the premium charged for First Class tickets.