LM 350/3 discussion (was Construction Progress)

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Kristofferson

Member
Joined
23 Nov 2012
Messages
1,132
The LM Desiros on the WCML are relatively new, what's the reason behind the 350/3s?

I'm assuming it's not replacement stock, and the WCML seems pretty full so extra capacity doesn't seem practical... Are they for the Cross City Line?
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
The LM Desiros on the WCML are relatively new, what's the reason behind the 350/3s?

I'm assuming it's not replacement stock, and the WCML seems pretty full so extra capacity doesn't seem practical... Are they for the Cross City Line?

Extra capacity on the WCML ie longer formations, also they come as 110 capable i believe?
They are also to (release i believe so indirectly) provide units for the increased frequency to Redditch and the extensions to Bromsgrove.

That is my understanding anyway.
--- old post above --- --- new post below ---
3 for extra birmingham services and 7 for more wcml 110mph services.

this :D
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
It should provide a mini internal cascade with the /3s going to WCML south jobs with some capacity enhancements, three /2s to Wolverhampton-Walsall jobs releasing 323s for the Redditch branch enhancement. I should know more in a couple of weeks.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Sorry just for my clarification are the 350/3 2+2 long distance? and the /2s 3+2 hence them moving to commuter work?
^^^^^^^^^^^^^^^
Sorry just googled that.

Are the /2s ever going to be uprated to 110?
 
Last edited:

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
No plans to upgrade the /2s to 100mph at the moment. They don't need to really since they will be concentrated on Commuter work and not the outer suburban work that needs 110mph.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
No plans to upgrade the /2s to 100mph at the moment. They don't need to really since they will be concentrated on Commuter work and not the outer suburban work that needs 110mph.

Except those that work the Birmingham-Liverpool service. :(
About 2/3 of these units are currently 350/2 (and they also appear on the Trent Valley services).
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
The first 350/3 appears to have been finished externally: (not my photo)
10001477_746820085351820_1053933267_n.jpg
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
And in one fell swoop disappears the best chance of identifying for sure if it's a 110mph (and 2+2) unit ;)
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
Where did that come from? That's a Class 700 on the right.

It was uploaded by a Facebook friend without a caption, but I would guess it must have been taken at Siemens' test track at Wildenrath? I thought the 350s and 700s were being built at different locations, but I assume they are both being tested there.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
It was uploaded by a Facebook friend without a caption, but I would guess it must have been taken at Siemens' test track at Wildenrath? I thought the 350s and 700s were being built at different locations, but I assume they are both being tested there.

Both the 350 and 700 are being built in Krefeld. Don't think its Wildenrath as the first one is due there shortly from what I've been told.

Thanks for sharing tho.
 

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
Both the 350 and 700 are being built in Krefeld. Don't think its Wildenrath as the first one is due there shortly from what I've been told.

Well I'll take your word for it Class377/5 as you are clearly in the know over such things. Must be Krefeld then.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Well I'll take your word for it Class377/5 as you are clearly in the know over such things. Must be Krefeld then.

Its not 100% as the info is a couple of weeks old (and partly based on my understanding of Siemens testing events/locations).

Anyway back to the 350/3....
 

Class83

Member
Joined
8 Jun 2012
Messages
609
Will these new low density units change this?

At a quick glance the Liverpool-Birmingham run will have 8 diagrams, so could probably take up 10 units with maintenance and peak doubles. Which would keep the new fleet together and free up the /1s and /2s for Crewe and commuter services.
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,458
Location
Milton Keynes
I'm pretty sure that unit on the right is a European loading gauge unit.

Any more pictures of 350368 would be very welcome!
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,832
Location
Nowhere Heath
Class83:1740961 said:
At a quick glance the Liverpool-Birmingham run will have 8 diagrams, so could probably take up 10 units with maintenance and peak doubles. Which would keep the new fleet together and free up the /1s and /2s for Crewe and commuter services.

10 350s wouldn't be far off from a bit of estimates. I've yet to see a double 350 on a peak time Liverpool-Birmingham or vice versa service mind.

It's also fair to point out that yesterday it was almost all /1s on Liverpool runs, noted only a few /2s in use on the route.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,572
Location
Macclesfield
8 car 350s can't be used on Birmingham - Liverpool runs because of short platforms IIRC
Indeed - There are no pairs of 350s diagrammed for the Birmingham to Liverpool services. Certainly, platform 4c at New Street, the usual bay that they use, would be unable to accomodate an 8-car formation.
--- old post above --- --- new post below ---
Except those that work the Birmingham-Liverpool service. :(
About 2/3 of these units are currently 350/2
Actually, the current diagrams show it as being more like half and half between 350/1s and 350/2s. It has been a 2:6 split previously though.

As such, I don't think that any proposals to concentrate the 350/3s on the Birmingham to Liverpool corridor would work: While we won't know exactly what services the 350/3s will be working until all their diagrams are in place from the December 2014 timetable, presumably more 110mph capable units than would be freed up from Birmingham - Liverpool will be required to introduce 8-car working on some Crewe 110 services, and whatever other improvements have been announced (A new morning fast service from Northampton to London, was it?).
 