• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Liverpool Lime St remodelling

Status
Not open for further replies.

daikilo

Established Member
Joined
2 Feb 2010
Messages
1,623
Always an EMU.
Merseyrail don't do anything else.
It just saves a couple of EMUs for other work (and reduces Hooton-Liverpool to the 4tph Chester trains).

Yes, but others do, and it is not unusual to hire stock and crew for short-term cover.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,325
I would assume it's because Merseyrail want to have as many 6 car sets on routes such as South Parkway to Liverpool/Southport, and Liverpool - Chester as alternatives.

Maybe they should have taken on some of the former South Eastern 508's when they had the chance?

I think those available were considered "too knackered" for repairs to be "economically affordable".
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
Yes, but others do, and it is not unusual to hire stock and crew for short-term cover.

Merseytravel define the service level, and must be happy with the temporary reduction.
The branch retains 2tph, just with a longer journey time and change at Hooton.
The main impact really is Hooton-Liverpool which loses 2tph.
We've just had 6 months of reduced timetable for the Loop works, so they are not going to do anything more for the few weeks of Lime St disruption.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,198
I used to organise cross-TOC hires for a living.

The thought of arranging a hire-in (cleared stock, route knowledge & traction knowledge) for Ellesmere Port - Liverpool would be ... challenging.

:D
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I would assume it's because Merseyrail want to have as many 6 car sets on routes such as South Parkway to Liverpool/Southport, and Liverpool - Chester as alternatives.

Maybe they should have taken on some of the former South Eastern 508's when they had the chance?

Would 313s be any good?
 

Gareth

Established Member
Joined
10 Mar 2011
Messages
1,505
I don't think Merseyrail will take any units that aren't refurbished up to the standards of its current fleet. 313s may be similar to the 507/8s but if there are any technical differences in operating then, then that means driver/guard training too.

There may have been an argument a few years back to take some of the redundant 508s from Southeastern but it was deemed not worth refurbishing them. I think the plan for the new rolling stock has been delayed a fair few years and was due to come online around now or 2018. If they knew that back then, then maybe they would've reconsidered. But we're where we are until the new fleet arrives (which also seems worryingly small).
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
I was at Liverpool South Parkway Station earlier today and I had notice a "new" signal has appeared at the south end of the up slow "extended" platform (4) which I assume will "temporary" replace Signal AN5 which is currently at the end of the existing Platform 4. This would suggest the latter signal will be dismantled when the extended platform comes live at the end of September. Also notice they have put the "car" signs up at the relevant places along the platform too.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,184
Location
"Marston Vale mafia"
So they'll still run to Central but passengers have to change to other trains (as they no doubt will rather than walking, so Central will still be busy)? That'll be popular. If they need them out of the way why not use the Central reversing siding?
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,824
Location
Liverpool, UK
So they'll still run to Central but passengers have to change to other trains (as they no doubt will rather than walking, so Central will still be busy)? That'll be popular. If they need them out of the way why not use the Central reversing siding?

All Mersyrail trains from South Parkway run to Southport.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
So they'll still run to Central but passengers have to change to other trains (as they no doubt will rather than walking, so Central will still be busy)? That'll be popular. If they need them out of the way why not use the Central reversing siding?

There *must* be some sensible logic Merseyrail have applied for crowd control. I would imagine it is genuinely to encourage as many Ormskirk/Kirkby passengers as possible to walk to Moorfields (and effectively 'forcing' any people changing to/from the Wirral Line to do so there).

Plus, having a simple 'Southbound platform for South Parkway, Northbound platform for Moorfields and Southport' makes a queueing system much easier to organise and enforce, especially in a constrained station like Central. The 'normal' platform usage sees Kirkby trains turning back in one platform and Ormskirk trains in the other, which would be a nightmare to manage with crowds on/off the other trains.

Turning at Moorfields may also mean that a second driver can get on the rear cab to assist with a quick reversal at Central without releasimg the doors (maximising remaining platform space to allow for longer dwell times of South Parkway services)

Remember also that on a weekday, the split of usage between Moorfields and Central is much more even than its is on a weekend, so the number of passengers forced to walk might not be quite as high as you might expect compared to a Saturday.
 

KevinTurvey

Member
Joined
9 Oct 2016
Messages
262
Just a quick note on progress to say track laying has now commenced. Sleepers are in place to both of the new platforms.

Only 2 weeks to go!
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Extra ticket machines going in at South Parkway apparently.
 

johnmoly

Member
Joined
26 Dec 2014
Messages
111
Location
liverpool
There are ticket machines going in all over Merseyside, one recently installed at Edge Hill and other places, all manned stations as well.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
I picked up the VT leaflet about the Lime St service alterations today.
There is a timetable which shows connections to/from South Parkway on Merseyrail.
But the station entries are rather odd.
One is for "Liverpool Central (Northern)".
Another is for "Moorfields HL/NL".

What has Northern got to do with Liverpool Central?
What does HL/NL mean?
 

Y Ddraig Coch

Established Member
Joined
1 Nov 2013
Messages
1,510
Location
Llandudno
I picked up the VT leaflet about the Lime St service alterations today.
There is a timetable which shows connections to/from South Parkway on Merseyrail.
But the station entries are rather odd.
One is for "Liverpool Central (Northern)".
Another is for "Moorfields HL/NL".

What has Northern got to do with Liverpool Central?
What does HL/NL mean?

HL - Higher Level ??
NL - Northern Line ??

Possibly because the Wirral line is below it so they are describing it as higher level even though it isn't as such.
 

Polarbear

Established Member
Joined
24 May 2008
Messages
1,903
Location
Birkenhead
I picked up the VT leaflet about the Lime St service alterations today.
There is a timetable which shows connections to/from South Parkway on Merseyrail.
But the station entries are rather odd.
One is for "Liverpool Central (Northern)".
Another is for "Moorfields HL/NL".

What has Northern got to do with Liverpool Central?
What does HL/NL mean?

I'd guess the reference to 'Northern' in the context of Liverpool Central would be to do with the Northern Line platforms being used?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,904
Location
Mold, Clwyd
HL - Higher Level ??
NL - Northern Line ??
Possibly because the Wirral line is below it so they are describing it as higher level even though it isn't as such.

I'd guess the reference to 'Northern' in the context of Liverpool Central would be to do with the Northern Line platforms being used?

Yes, maybe that's it, just identifying the platforms.
I somehow thought Northern meant the TOC!
 

johnmoly

Member
Joined
26 Dec 2014
Messages
111
Location
liverpool
At Moorfields, and for that matter Central, I'm under the impression that the Northern Line is classed as Low level, and the Wirral as Deep level, seeing as its under the Northern line.
 

Arcadia77

Member
Joined
28 Apr 2011
Messages
30
The temporary platform at South Parkway appears to be complete!

http://www.liverpoolecho.co.uk/news...pool-south-parkway-platform-extended-13672725

Liverpool South Parkway platform extended to get ready for Lime Street trains

AHR_LEC_250917_parkway_01.jpg


Liverpool South Parkway station has been upgraded so it can welcome trains from Lime Street when the city centre station closes.

Liverpool Lime Street will be closed from September 30 for 23 days. During the closure, many passengers will have to change at South Parkway for connections into the city centre.

So Network Rail has extended Platform 4 at the station so it can accommodate the longer Liverpool to London trains.

The work saw the temporary 150m extension built on scaffolding around existing overhead line structures. A signal also had to be moved to make way for the extension.

Sean Hyland, senior project manager at Network Rail, said: “Liverpool South Parkway station is going to act as a major interchange station during Lime Street’s major transformation.

“In order to prepare for this we’ve completed vital platform extension works at the station to allow passengers travelling on Virgin services to alight at South Parkway during the upgrade, ready to pick up the next Merseyrail service into Liverpool.”

Frank Rogers, chief executive at Merseytravel, said: “The work completed at Liverpool South Parkway represents our commitment not only to providing quality transport services but to keeping people moving during the Lime Street Station upgrade.

“Transport providers have worked together to provide services to keep people moving and it’s really important that customers, both local and from further afield, plan ahead and familiarise themselves with the alternative arrangements so they can continue to get about easily and seamlessly during the works.”

The work on Lime Street will mean the station can handle an extra three services an hour, including direct services to Scotland. It will be given longer platforms with more space for passengers, while overhead power lines will also be extended.

The station will be closed twice – one starting this month and another next summer.

The RMT has confirmed two strike dates on October 3 and October 5, when Lime Street is closed, over Merseytravel’s plans to introduce driver-operated trains and remove guards from trains.

AHR_LEC_250917_parkway_02.jpg
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,315
I wonder how much 150m of temporary platform cost?

Or if a bit of scaffolding with wooden boards on top (and fitted in around the ohle) is safe enough for unloading trainloads of inter city passengers, why is something more expensive required for potential country reopenings?
 

Holly

Member
Joined
20 May 2011
Messages
783
I imagine that quite many people will find Liverpool South Parkway to be more convenient than Liverpool Lime Street and would wish that the temporary arrangement be made permanent.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
I imagine that quite many people will find Liverpool South Parkway to be more convenient than Liverpool Lime Street and would wish that the temporary arrangement be made permanent.
May I ask how you work that out please? More convenient for what? Given that LSP is approx 5 miles away from Liverpool City Centre, not sure is that convenient.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
Yes, maybe that's it, just identifying the platforms.
I somehow thought Northern meant the TOC!
"Northern" (Arriva) referring to the TOC only came about last year. Prior to that it was "Northern Rail". The "Northern Line" (Merseyrail) came in to being around 1977 (I think) so there is really no confusion as such.
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,033
Location
Frodsham
May I ask how you work that out please? More convenient for what? Given that LSP is approx 5 miles away from Liverpool City Centre, not sure is that convenient.

I suppose some people will want to go to South Liverpool anyway, so getting off at South Parkway would be better for them. However I can't see Virgin wanting to make another stop on their London service long term, maybe if two an hour, one calling at Runcorn and one for South Parkway. Just hypothetical.
 
Last edited:

Nean

Member
Joined
28 Dec 2013
Messages
158
Location
Sheffield
I suppose some people will want to go to South Liverpool anyway, so getting off at South Parkway would be better for them. However I can't see Virgin wanting to make another stop on their London service long term, maybe if two an hour, one calling at Runcorn and one for South Parkway. Just hypothetical.

I'm one of those people wanting the Parkway stop to be made permanent- It's slightly annoying having to go 30-60 minutes into Liverpool to get a train to London when I could just go 1 stop down the Northern Line!
 

frodshamfella

Established Member
Joined
25 Sep 2010
Messages
2,033
Location
Frodsham
I'm one of those people wanting the Parkway stop to be made permanent- It's slightly annoying having to go 30-60 minutes into Liverpool to get a train to London when I could just go 1 stop down the Northern Line!

Yes I can see how annoying it must be. I'm sure there would be a demand from South Parkway to have some sort of Euston service.
 
Status
Not open for further replies.