Recently passed through Wimbledon station and it looks like there’s now a siding/headshint past the end of the ‘new’ platform
This lead me to wondering if anyone knew how many other sidings/refuges there are (and if there’s any stock transfer points/interfaces with NR)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mcv378

Member
Joined
31 Dec 2023
Messages
89
Location
London
There is also a siding at Elmers End, I believe it will be used in passenger service when a second platform is built, although news about construction of the second platform has gone very quiet.
 

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,474
Why would Elmers End ever need a second platform without frequency increases?
 

Mcv378

Member
Joined
31 Dec 2023
Messages
89
Location
London
Why would Elmers End ever need a second platform without frequency increases?
It was planned but currently hasn’t been constructed. IMG_3588.jpeg

Description of image : "Double tracking of the branch line and a second platform at Elmers End tram station will provide additional facilities to enable service improvements and address reliability issues on the network.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,168
Location
JB
The overrun at Wimbledon isn’t new - it dates from the opening of 10B in 2015.

There is also a ‘cripple siding’ for stabling a disabled tram on the approach to Wimbledon, facing towards Croydon.

A cripple siding previously existed at Elmers End when the system first opened, but this was subsumed into the passing loop as part of the capacity enhancements in - off the top of my head - 2015 also. There are no physical connections to the mainline, and never have been.

The additional platform at Elmers End was essentially a casualty of Covid, but it is debatable as to how much of a business case ever existed for it without additional trams.
 